MATAGORDA SH 35 (0179-04-104)

Items: 100

County: MATAGORDA
Length: 0.4170 MILES
Highway: SH 35
District: YOAKUM
Control Number: 0179-04-104
DBE Goal: 3.5%
Project: BR 2B24(073)
Guaranty: $100,000.00
Time: 467 WORKING DAYS
Engineer's Estimate: $26,875,955.70
Date: 09/06/2024 (1 year ago) Changed
Contract Number: 9243208
Type: BRIDGE REPLACEMENT
Project ID: A00183901
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$26,875,955.70
$30,981,397.22
Over/Under Est: 15.28% $4,105,441.52
$32,441,315.10
Over/Under Est: 20.71% $5,565,359.40
Amt Left: 4.71% $1,459,917.88
$32,666,406.63
Over/Under Est: 21.55% $5,790,450.93
Amt Left: 5.44% $1,685,009.41
Delta: -0.69% -$225,091.53
Over/Under Est: 26.44% $7,105,483.48
Amt Left: 9.68% $3,000,041.96
Delta: -4.03% -$1,315,032.55
$37,349,665.95
Over/Under Est: 38.97% $10,473,710.25
Amt Left: 20.56% $6,368,268.73
Delta: -9.91% -$3,368,226.77
Over/Under Est: 39.2% $10,534,644.46
Amt Left: 20.75% $6,429,202.94
Delta: -0.16% -$60,934.21
Subcontractor Percentage Amount
A. H. BECK FOUNDATION CO., INC. 15.20% $4,709,172.38
HERMANOS STEEL, LLC 3.67% $1,137,017.28
TRAFFIC SIGNS & LINES, LLC 0.38% $117,729.31
USA AMTECH, INC. 0.37% $114,631.17
PENHALL COMPANY 0.35% $108,434.89
SELECT MAINTENANCE, L.L.C. 0.14% $43,373.96
MATAGORDA CONSTRUCTION & MATERIALS 0.13% $40,275.82
TEXOP CONSTRUCTION 0.09% $27,883.26
PRIMATE CONSTRUCTION, LP 0.07% $21,686.98
LONE STAR EROSION CONTROL 0.05% $15,490.70
MPIRE INDUSTRIES COMMERCIAL DIVING SERVICES LLC 0.04% $12,392.56
AVILES CONSTRUCTION SERVICE, INC 0.02% $6,196.28
Total: 20.51% $6,354,284.59

Bid Items & Bid Tabulations

100 Total 0 of 100
MATAGORDA  |  SH 35  |  YOAKUM  |  0179-04-104  |  09/06/2024  |  $26,875,955.70  |  BR 2B24(073)  |  BRIDGE REPL  |  467 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
MC2 CIVIL, LLC
ISI CONTRACTING, INC.
MORTMARA CONSTRUCTION, INC.
ORION CONSTRUCTION, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 4.000 $25,000.000 $750,000.000 $269,000.000 $12,789.580 $250,000.000 $825,000.000 $50,000.000
REMOVING CONC (RIPRAP)
SY 36.000 $41.000 $22.000 $100.000 $124.230 $68.000 $25.000 $100.000
EXCAVATION (ROADWAY)
CY 10,088.000 $28.000 $30.000 $30.000 $20.740 $75.000 $70.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 430.000 $35.000 $30.000 $50.000 $23.400 $100.000 $135.000 $95.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 662.000 $28.000 $30.000 $50.000 $27.950 $100.000 $90.000 $70.000
BLADING
HR 16.000 $159.000 $180.000 $150.000 $2,460.990 $160.000 $110.000 $355.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 3,803.000 $1.500 $0.790 $1.000 $1.180 $0.450 $1.000 $0.510
BROADCAST SEED (TEMP) (WARM)
SY 951.000 $1.700 $1.500 $3.000 $0.510 $0.350 $1.500 $0.460
BROADCAST SEED (TEMP) (COOL)
SY 951.000 $1.700 $1.500 $3.000 $0.510 $0.350 $1.500 $0.460
VEGETATIVE WATERING
MG 33.000 $65.000 $50.000 $40.000 $82.940 $40.000 $40.000 $56.840
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 924.000 $105.000 $145.000 $200.000 $232.860 $142.280 $225.000 $200.000
LIME TRT (EXST MATL) (6")
SY 3,160.000 $6.700 $7.000 $7.000 $16.620 $14.000 $11.000 $6.350
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 37.700 $394.000 $352.000 $350.000 $310.140 $350.000 $430.000 $400.000
CEMENT
TON 22.700 $277.000 $200.000 $225.000 $202.760 $350.000 $385.000 $400.000
CEMENT TREAT (EXIST MATL) (6")
SY 3,160.000 $5.000 $5.250 $7.000 $21.180 $14.000 $6.000 $6.350
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 6,317.000 $25.000 $28.500 $40.000 $34.850 $40.120 $33.000 $50.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 347.700 $230.000 $170.000 $200.000 $271.740 $225.000 $230.000 $255.440
ASPH (RC-250)
GAL 804.000 $12.000 $5.750 $25.000 $6.660 $7.500 $8.000 $16.980
AGGR(TY-E GR-5 SAC-B)
CY 29.000 $150.000 $350.000 $500.000 $405.200 $695.000 $675.000 $594.130
AGGR(TY-PE GR-3 SAC-B)
CY 47.000 $200.000 $350.000 $500.000 $405.200 $715.000 $500.000 $521.830
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 1,608.000 $7.500 $5.500 $20.000 $6.370 $20.000 $7.750 $15.340
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 20.000 $151.000 $375.000 $500.000 $434.150 $326.000 $725.000 $427.190
CONC PVMT (CONT REINF - CRCP) (10")
SY 5,749.000 $130.000 $90.000 $140.000 $57.740 $140.000 $165.000 $146.650
CONC PVMT (CRCP)(JCT TERMINAL)(10")
SY 374.000 $130.000 $125.000 $180.000 $15.930 $242.000 $165.000 $196.300
CEM STABIL BKFL
CY 345.000 $223.000 $140.000 $150.000 $123.480 $500.000 $325.000 $250.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 22,240.000 $30.000 $1.000 $20.000 $118.480 $21.600 $0.010 $1.000
DRILL SHAFT (18 IN)
LF 192.000 $170.000 $300.000 $525.000 $1,068.510 $190.000 $500.000 $500.000
DRILL SHAFT (36 IN)
LF 945.000 $310.000 $333.000 $525.000 $1,225.980 $439.000 $525.000 $700.000
DRILL SHAFT (42 IN)
LF 2,010.000 $500.000 $450.000 $650.000 $1,209.230 $541.000 $700.000 $760.000
DRILL SHAFT (84 IN)
LF 2,259.000 $2,100.000 $1,925.000 $3,000.000 $3,331.810 $2,388.000 $2,735.000 $2,750.000
CL C CONC (ABUT)
CY 123.700 $2,000.000 $1,300.000 $2,500.000 $2,636.900 $3,200.000 $2,000.000 $2,000.000
CL C CONC (CAP)
CY 478.500 $2,000.000 $1,750.000 $2,500.000 $2,675.460 $3,100.000 $3,600.000 $2,500.000
CL C CONC (CAP)(MASS)
CY 633.100 $2,000.000 $1,025.000 $2,800.000 $2,170.240 $3,000.000 $2,200.000 $3,600.000
CL C CONC (COLUMN)
CY 249.800 $2,000.000 $1,500.000 $2,500.000 $1,866.180 $3,000.000 $3,250.000 $2,100.000
REINF CONC SLAB
SF 90,174.000 $40.000 $22.250 $34.000 $38.000 $43.500 $42.000 $72.000
APPROACH SLAB
CY 189.000 $815.000 $610.000 $1,000.000 $1,435.990 $1,550.000 $900.000 $1,315.000
PRESTR CONC GIRDER (TX28)
LF 2,059.240 $200.000 $230.000 $200.000 $294.520 $326.000 $240.000 $305.000
PRESTR CONC GIRDER (TX54)
LF 6,083.900 $330.000 $250.000 $220.000 $257.290 $336.000 $260.000 $345.000
PRESTR CONC GIRDER (TX70)
LF 3,594.240 $400.000 $290.000 $240.000 $347.390 $411.000 $315.000 $425.000
RIPRAP (CONC)(5 IN)
CY 83.000 $710.000 $605.000 $650.000 $165.640 $605.000 $850.000 $698.590
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,513.000 $195.000 $225.000 $1.000 $165.320 $221.500 $525.000 $325.000
RIPRAP (MOW STRIP)(4 IN)
CY 61.000 $710.000 $615.000 $800.000 $169.620 $695.000 $950.000 $802.510
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 4,418.000 $80.000 $65.000 $67.000 $158.690 $80.000 $95.000 $120.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 467.000 $222.000 $220.000 $250.000 $286.170 $215.000 $370.000 $500.000
RC PIPE (CL III)(18 IN)
LF 20.000 $118.000 $150.000 $175.000 $171.240 $150.000 $170.000 $320.000
RC PIPE (CL III)(24 IN)
LF 51.000 $145.000 $140.000 $170.000 $167.300 $150.000 $175.000 $400.000
RC PIPE (CL IV)(18 IN)
LF 393.000 $155.000 $105.000 $140.000 $140.190 $150.000 $150.000 $360.000
RC PIPE (ARCH)(CL III)(DES 2)
LF 308.000 $244.000 $205.000 $260.000 $391.680 $150.000 $275.000 $500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,450.000 $1,820.000 $3,500.000 $6,302.440 $3,000.000 $6,000.000 $7,500.000
REMOV STR (PIPE)
LF 701.000 $24.000 $18.000 $35.000 $31.520 $18.000 $32.000 $100.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 2.000 $1,000,000.000 $2,500,000.000 $2,300,000.000 $835,456.760 $1,500,000.000 $1,750,000.000 $1,225,000.000
REMOV STR (SMALL)
EA 2.000 $2,030.000 $1,000.000 $250.000 $5,805.750 $1,600.000 $1,500.000 $5,884.000
MOBILIZATION
LS 1.000 $2,394,000.000 $3,500,000.000 $3,200,000.000 $2,000,000.000 $3,390,000.000 $3,700,000.000 $3,509,639.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 31.000 $20,000.000 $75,000.000 $9,000.000 $12,123.240 $14,600.000 $25,000.000 $14,500.000
SANDBAGS FOR EROSION CONTROL
EA 5.000 $13.000 $12.000 $10.000 $1.160 $30.000 $20.000 $27.380
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,507.000 $4.700 $3.400 $3.500 $9.260 $3.750 $5.500 $4.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,507.000 $1.500 $1.000 $0.500 $2.620 $2.000 $1.000 $2.220
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $10.000 $10.000 $10.000 $18.960 $8.500 $18.000 $10.170
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $2.000 $2.000 $2.000 $13.110 $2.000 $5.000 $3.050
CONSTRUCTING DETOURS
SY 3,200.000 $200.000 $200.000 $200.000 $147.150 $300.000 $275.000 $250.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,760.000 $70.000 $175.000 $120.000 $80.750 $100.000 $100.000 $450.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $67.000 $175.000 $120.000 $103.590 $105.000 $100.000 $450.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,680.000 $15.000 $10.000 $12.000 $10.790 $6.000 $9.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $18.000 $15.000 $12.000 $13.870 $50.000 $9.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,760.000 $20.000 $15.000 $10.000 $13.870 $6.000 $12.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $20.000 $15.000 $10.000 $13.870 $50.000 $12.000 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 925.000 $30.000 $23.950 $26.000 $19.070 $29.360 $50.000 $26.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,500.000 $1,684.000 $2,000.000 $1,341.010 $1,684.000 $3,750.000 $1,880.710
REMOVE METAL BEAM GUARD FENCE
LF 1,050.000 $6.000 $2.250 $4.000 $1.790 $6.000 $10.000 $2.510
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $300.000 $180.000 $250.000 $143.340 $361.290 $500.000 $201.030
MTL BM GD FEN (REMOVE & REINSTALL)
LF 175.000 $50.000 $16.000 $20.000 $12.740 $16.000 $35.000 $17.870
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,200.000 $3,157.000 $3,300.000 $2,514.000 $3,157.000 $5,000.000 $3,525.770
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $1,000.000 $1,260.000 $1,400.000 $1,003.400 $1,260.000 $850.000 $1,407.180
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $300.000 $250.000 $320.000 $199.090 $250.000 $550.000 $279.200
CONDT (PVC) (SCH 40) (4")
LF 62.000 $100.000 $40.000 $48.000 $31.850 $287.000 $55.000 $87.000
CONDT (RM) (4")
LF 1,862.000 $150.000 $205.000 $210.000 $163.250 $163.000 $280.000 $133.000
CONDT (HDPE) (1 1/4")
LF 2,793.000 $100.000 $5.000 $5.500 $3.980 $101.000 $7.000 $116.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $900.000 $832.000 $1,000.000 $662.550 $550.000 $1,800.000 $929.190
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,200.000 $1,128.000 $1,200.000 $898.260 $1,128.000 $3,200.000 $1,259.760
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $600.000 $291.000 $350.000 $231.750 $291.000 $800.000 $324.990
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $600.000 $330.000 $350.000 $262.800 $330.000 $1,100.000 $368.550
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 10.000 $2,500.000 $2,390.000 $2,400.000 $1,903.220 $2,710.000 $3,300.000 $2,669.180
REMOVE SM RD SN SUP&AM
EA 7.000 $130.000 $100.000 $120.000 $79.630 $600.000 $200.000 $111.680
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 92.000 $35.000 $15.000 $18.000 $11.950 $15.000 $40.000 $16.750
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 92.000 $35.000 $15.000 $18.000 $11.950 $15.000 $40.000 $16.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 36.000 $35.000 $21.000 $23.000 $16.720 $21.000 $65.000 $23.450
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 20.000 $40.000 $21.000 $23.000 $16.720 $21.000 $65.000 $23.450
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,540.000 $1.000 $2.250 $3.000 $1.790 $0.850 $2.100 $2.510
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 22,084.000 $1.000 $0.850 $1.000 $0.680 $0.850 $1.850 $0.950
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 21,257.000 $1.000 $0.850 $1.000 $0.680 $0.850 $1.850 $0.950
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 910.000 $2.400 $2.500 $3.000 $1.990 $2.500 $30.000 $2.790
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,450.000 $1.600 $2.000 $2.500 $1.590 $2.000 $1.500 $2.230
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 11,350.000 $1.400 $0.950 $1.100 $0.760 $0.950 $1.500 $1.060
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 9,345.000 $1.200 $0.950 $1.100 $0.760 $0.950 $1.500 $1.060
REFL PAV MRKR TY II-C-R
EA 127.000 $7.100 $6.000 $7.000 $4.780 $6.000 $15.000 $6.700
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $50,000.000 $20,000.000 $13,159.500 $21,270.000 $25,000.000 $25,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $20,000.000 $15,000.000 $6,552.750 $10,797.000 $15,000.000 $15,000.000
TMA (STATIONARY)
DAY 20.000 $300.000 $750.000 $200.000 $619.400 $400.000 $650.000 $750.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $750.000 $600.000 $1,114.230 $700.000 $1,800.000 $975.000
PAVEMENT SEALER 6"
LF 9,040.000 $1.000 $0.600 $0.750 $0.480 $0.600 $1.500 $1.100
Totals: $26,875,955.700 $30,981,397.220 $32,441,315.100 $32,666,406.665 $33,981,439.180 $37,349,665.950 $37,410,600.168