PREPARING ROW
|
STA
|
21.400
|
$3,000.000
|
$5,000.000
|
$1,700.000
|
$3,560.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(1"-9")
|
SY
|
3,561.000
|
$2.000
|
$4.000
|
$4.700
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,797.000
|
$15.000
|
$15.000
|
$26.250
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
999.000
|
$15.000
|
$15.000
|
$27.600
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
10,132.000
|
$15.000
|
$30.000
|
$15.340
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
18,294.000
|
$1.000
|
$4.000
|
$7.900
|
$3.250
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
9,147.000
|
$0.100
|
$1.000
|
$0.420
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
9,147.000
|
$0.100
|
$1.000
|
$0.430
|
$0.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
18,294.000
|
$0.400
|
$0.650
|
$0.650
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
366.000
|
$15.000
|
$40.000
|
$30.290
|
$22.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
10,147.000
|
$2.000
|
$2.000
|
$1.900
|
$2.000
|
|
|
CEMTRT (PLNTMX)(CL N)(TY A)(GR 5)(14")
|
SY
|
3,297.000
|
$20.000
|
$85.000
|
$43.400
|
$38.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
661.000
|
$4.000
|
$6.000
|
$24.400
|
$9.000
|
|
|
ASPH (TIER II)
|
GAL
|
1,716.000
|
$5.000
|
$6.000
|
$19.100
|
$7.000
|
|
|
AGGR(TY-D GR-5 SAC-B)
|
CY
|
60.000
|
$150.000
|
$150.000
|
$477.000
|
$270.000
|
|
|
CEM STABIL BKFL
|
CY
|
153.000
|
$200.000
|
$150.000
|
$170.000
|
$160.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,303.000
|
$25.000
|
$22.000
|
$35.400
|
$36.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
60.000
|
$110.000
|
$225.000
|
$215.000
|
$1,000.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
480.000
|
$220.000
|
$800.000
|
$795.000
|
$1,700.000
|
|
|
CL C CONC (ABUT)
|
CY
|
58.000
|
$950.000
|
$1,050.000
|
$998.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
117.600
|
$1,150.000
|
$1,125.000
|
$1,210.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
103.000
|
$950.000
|
$1,350.000
|
$1,300.000
|
$1,300.000
|
|
|
REINF CONC SLAB
|
SF
|
27,072.000
|
$21.000
|
$18.000
|
$24.000
|
$22.000
|
|
|
APPROACH SLAB
|
CY
|
48.100
|
$500.000
|
$846.370
|
$617.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
3,366.490
|
$170.000
|
$165.000
|
$218.000
|
$200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
198.000
|
$450.000
|
$395.000
|
$560.000
|
$560.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
1,641.000
|
$275.000
|
$110.000
|
$141.000
|
$170.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
34.000
|
$500.000
|
$425.000
|
$697.000
|
$700.000
|
|
|
RAIL (TY T631LS)
|
LF
|
1,764.000
|
$75.000
|
$62.180
|
$71.900
|
$100.000
|
|
|
ARMOR JOINT
|
LF
|
112.000
|
$150.000
|
$90.000
|
$83.400
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
33.000
|
$100.000
|
$80.000
|
$95.300
|
$100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$1,800.000
|
$2,970.000
|
$1,800.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$20,000.000
|
$22,100.000
|
$90,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$200,000.000
|
$90,000.000
|
$47,800.000
|
$130,000.000
|
|
|
REMOV STR (CATTLE GUARD)
|
EA
|
1.000
|
$800.000
|
$3,500.000
|
$0.010
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$361,905.210
|
$350,000.000
|
$356,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$4,500.000
|
$3,290.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
456.000
|
$30.000
|
$30.000
|
$38.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
456.000
|
$10.000
|
$12.000
|
$14.400
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$20.000
|
$14.000
|
$30.900
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$8.000
|
$11.100
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,458.000
|
$2.500
|
$3.300
|
$2.550
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,458.000
|
$0.600
|
$2.200
|
$0.700
|
$0.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,267.000
|
$75.000
|
$35.000
|
$127.000
|
$350.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$3,500.000
|
$5,000.000
|
$2,650.000
|
$5,000.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
920.000
|
$75.000
|
$25.000
|
$84.300
|
$35.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$50.000
|
$25.000
|
$34.500
|
$35.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$10.000
|
$12.000
|
$2.700
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$10.000
|
$12.000
|
$2.650
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
920.000
|
$10.000
|
$13.000
|
$19.300
|
$18.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$13.000
|
$19.200
|
$30.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
175.000
|
$25.000
|
$40.000
|
$73.200
|
$120.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$25.000
|
$24.750
|
$32.200
|
$35.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,600.000
|
$2,970.000
|
$3,380.000
|
$3,800.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,982.000
|
$20.000
|
$20.000
|
$10.600
|
$30.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$1,590.000
|
$1,500.000
|
|
|
GATE (TY 2)
|
EA
|
1.000
|
$2,000.000
|
$3,200.000
|
$1,590.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$650.000
|
$561.000
|
$540.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$700.000
|
$679.800
|
$655.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$90.000
|
$95.700
|
$92.200
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
24.000
|
$25.000
|
$30.800
|
$29.700
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$60.000
|
$73.700
|
$71.000
|
$80.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$20.000
|
$13.200
|
$12.700
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
7.000
|
$60.000
|
$88.000
|
$84.800
|
$100.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI)
|
EA
|
7.000
|
$60.000
|
$88.000
|
$84.800
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
1,776.000
|
$2.000
|
$2.750
|
$2.650
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,202.000
|
$0.600
|
$0.730
|
$0.710
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
20.000
|
$7.000
|
$22.000
|
$21.200
|
$25.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
238.000
|
$1.000
|
$6.000
|
$1.650
|
$1.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,692.000
|
$0.300
|
$0.550
|
$0.530
|
$0.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,692.000
|
$0.300
|
$0.550
|
$0.530
|
$0.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
2,471.000
|
$0.800
|
$1.650
|
$1.600
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
3,854.000
|
$0.800
|
$1.650
|
$1.600
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
69.000
|
$3.500
|
$16.500
|
$15.900
|
$18.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,289.000
|
$0.500
|
$0.840
|
$0.820
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$4,330.000
|
$12,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$5.000
|
$50.000
|
$21.200
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
140.000
|
$200.000
|
$200.000
|
$35.500
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$70.000
|
$80.000
|
$28.900
|
$350.000
|
|
Totals: |
$4,049,061.710
|
$4,178,807.037
|
$4,605,717.970
|
$6,034,418.000
|