Show Job Controls
Bid Cobra

MARTIN SH 349 (0380-07-026)

Items: 47

County: MARTIN
Length: N/A
Highway: SH 349
District: ODESSA
Control Number: 0380-07-026
DBE Goal: N/A
Project: NH 1802(582)
Guaranty: N/A
Time: 109 WORKING DAYS
Engineer's Estimate: $17,598,197.48
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: ARMORING WITH OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$17,598,197.48
Over/Under Est: -14.46% -$2,545,520.15
$18,142,990.91
Over/Under Est: 3.1% $544,793.43
Amt Left: 20.53% $3,090,313.58
$19,014,240.46
Over/Under Est: 8.05% $1,416,042.98
Amt Left: 26.32% $3,961,563.13
Delta: -4.80% -$871,249.55
$20,271,154.00
Over/Under Est: 15.19% $2,672,956.52
Amt Left: 34.67% $5,218,476.67
Delta: -6.61% -$1,256,913.54

Bid Items & Bid Tabulations

47 Total 0 of 47
MARTIN  |  SH 349  |  ODESSA  |  0380-07-026  |  08/08/2018  |  $17,598,197.48  |  NH 1802(582)  |  ARMORING WITH OVERLAY  |  109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RK HALL, LLC
FNF CONSTRUCTION, INC.
REECE ALBERT, INC.
REMOVING CONC (DRIVEWAYS)
SY 625.000 $20.110 $24.250 $10.090 $19.000 $21.800
BACKFILL (TY B)
STA 1,754.000 $118.880 $110.000 $101.050 $52.000 $74.260
BLADING
HR 180.000 $187.710 $375.000 $148.580 $200.000 $320.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 388,304.000 $0.370 $0.130 $0.140 $0.120 $0.130
PROOF ROLLING
HR 50.000 $95.500 $150.000 $101.600 $100.000 $74.350
FOG SEAL (CSS-1H)
GAL 26,505.000 $3.080 $3.700 $3.500 $3.500 $6.100
D-GR HMA(SQ) TY-C SAC-B PG64-22
TON 1,426.000 $141.800 $190.000 $156.550 $325.000 $230.150
STONE-MTRX-ASPH SMAR-F SAC-A
TON 104,746.000 $124.400 $107.000 $132.000 $125.000 $147.650
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 21,334.000 $31.350 $44.500 $41.300 $48.000 $54.600
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 6,991.000 $1.570 $3.910 $8.270 $2.250 $4.750
MOBILIZATION
LS 1.000 $1,592,335.450 $350,000.000 $479,632.580 $2,000,000.000 $548,378.570
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,658.600 $10,000.000 $15,000.000 $30,900.000 $32,025.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,160.000 $4.520 $6.000 $5.480 $8.000 $6.950
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,160.000 $1.370 $1.500 $1.390 $1.000 $0.600
DRIVEWAYS (CONC)
SY 625.000 $86.240 $117.180 $131.250 $85.000 $80.050
RUMBLE STRIPS (SHOULDER)
LF 349,472.000 $0.140 $0.120 $0.120 $0.100 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 349,472.000 $0.160 $0.180 $0.180 $0.150 $0.190
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 79.000 $610.130 $779.380 $525.000 $850.000 $795.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $712.450 $913.750 $577.500 $1,000.000 $931.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 7.000 $869.110 $989.000 $577.500 $1,100.000 $1,005.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 11.000 $838.130 $999.750 $630.000 $1,100.000 $1,020.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 4.000 $686.980 $994.380 $630.000 $1,100.000 $1,014.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 9.000 $1,152.330 $1,128.750 $682.500 $1,300.000 $1,050.000
REMOVE SM RD SN SUP&AM
EA 124.000 $85.760 $50.000 $78.750 $91.000 $110.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 2.000 $95.940 $150.000 $52.500 $62.000 $75.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)SRF
EA 18.000 $62.000 $91.380 $63.000 $97.000 $93.150
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 78.000 $98.050 $91.380 $63.000 $97.000 $93.150
REMOVE DELIN & OBJECT MARKER ASSMS
EA 96.000 $14.680 $20.000 $10.500 $14.000 $36.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 174,780.000 $0.240 $0.130 $0.130 $0.120 $0.120
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 701,688.000 $0.170 $0.120 $0.120 $0.120 $0.120
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,400,156.000 $0.160 $0.120 $0.120 $0.120 $0.120
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 209,740.000 $0.760 $1.000 $1.880 $0.010 $1.080
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 139,828.000 $0.320 $1.000 $1.350 $0.010 $1.120
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 134.000 $0.880 $1.080 $1.050 $0.330 $0.310
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,874.000 $0.620 $0.810 $0.790 $0.650 $0.610
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 87,370.000 $0.270 $0.290 $0.280 $0.350 $0.310
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 350,764.000 $0.270 $0.290 $0.280 $0.350 $0.310
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 699,917.000 $0.240 $0.290 $0.280 $0.350 $0.310
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 89.000 $10.940 $17.200 $16.800 $26.000 $24.380
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 15.000 $29.470 $37.630 $36.750 $49.000 $47.120
REFL PAV MRKR TY I-C
EA 8,740.000 $2.730 $2.800 $2.730 $4.000 $3.180
REFL PAV MRKR TY II-A-A
EA 8,740.000 $2.610 $2.800 $2.730 $4.000 $3.180
BONDING COURSESE
GAL 100,659.000 $2.800 $3.250 $5.050 $7.000 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,870.430 $10,000.000 $11,749.960 $20,000.000 $19,260.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $6,000.220 $3,500.000 $9,511.880 $8,000.000 $6,675.000
TMA (STATIONARY)
EA 4.000 $1,526.430 $9,500.000 $20,841.430 $10,000.000 $28,690.000
TMA (MOBILE OPERATION)
HR 512.000 $24.710 $10.000 $70.380 $86.000 $142.000
Totals: $17,598,197.480 $15,052,677.330 $18,142,990.910 $19,014,240.460 $20,271,154.000