MARTIN IH 20 (0005-04-084)

Items: 126

County: MARTIN
Length: 0.0000 MILES (2.6560 MILES)
Highway: IH 20
District: ODESSA
Control Number: 0005-04-084
DBE Goal: 0.0%
Project: F 2B25(101)
Guaranty: $100,000.00
Time: 282 WORKING DAYS
Engineer's Estimate: $5,911,334.34
Date: 07/02/2026 1:00 PM CDT (16 days ago) Changed
Contract Number: 7263010
Type: HIGHWAY IMPROVEMENT
Project ID: A00208465
Contract Type: FEDERAL
Project Description: REVERSAL OF EB ENTRANCE AND EXIT RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,911,334.34
$8,792,882.85
Over/Under Est: 48.75% $2,881,548.51
Over/Under Est: 51.74% $3,058,494.41
Amt Left: 2.01% $176,945.90
$10,399,949.72
Over/Under Est: 75.93% $4,488,615.38
Amt Left: 18.28% $1,607,066.87
Delta: -15.94% -$1,430,120.97
Over/Under Est: 88.25% $5,216,524.20
Amt Left: 26.56% $2,334,975.69
Delta: -7.00% -$727,908.82

Bid Items & Bid Tabulations

126 Total 0 of 126
MARTIN  |  IH 20  |  ODESSA  |  0005-04-084  |  07/02/2026 1:00 PM CDT  |  $5,911,334.34  |  F 2B25(101)  |  HWY IMPRV  |  282 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
RAGLE CONSTRUCTION, INC.
RK HALL, LLC
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOV CONC (RIPRAP)
SY 85.000 $42.000 $20.000 $12.500 $59.250 $66.120
REMOV CONC (DRIVEWAYS)
SY 707.000 $42.000 $20.000 $13.250 $32.220 $65.610
REMOV CONC (CURB & GUTTER)
LF 114.000 $22.000 $30.000 $11.000 $38.280 $17.320
RMV (3"-7") TRT/UNTRT BASE & ASPH PAV
SY 7,566.000 $10.000 $10.000 $4.500 $6.600 $11.080
RMV (7") TRT/UNTRT BASE & ASPH PAV
SY 8,250.000 $10.000 $10.000 $5.000 $7.210 $11.360
RMV (8") TRT/UNTRT BASE & ASPH PAV
SY 5,080.000 $11.000 $10.000 $5.750 $8.880 $12.810
EXCAV (ROADWAY)
CY 5,770.000 $10.000 $20.000 $45.000 $8.350 $34.670
EMBANK (FNL)(OC)(TY A)
CY 9,696.000 $14.000 $20.000 $30.000 $26.480 $40.200
BLADING
HR 20.000 $274.000 $310.000 $158.500 $172.260 $412.350
DRILL SEED (PERM_RURAL_SAND)
SY 45,192.000 $0.170 $0.250 $0.280 $0.220 $0.350
SOIL RET BLKT(SL_MOD_SAND_SHORT)
SY 458.000 $3.000 $5.000 $3.690 $3.240 $4.610
PROOF ROLLING
HR 20.000 $150.000 $165.000 $135.500 $152.130 $161.900
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 24,552.000 $13.000 $20.000 $10.000 $16.030 $21.610
PRIME COAT (AE-P)
GAL 4,910.000 $5.000 $6.500 $6.250 $7.810 $7.540
ASPH (AC-20-5TR)
GAL 11,873.000 $3.000 $8.000 $8.000 $5.690 $5.340
AGGR (TY-PB, GR-4)(SAC-A)
CY 260.000 $125.000 $200.000 $300.000 $533.030 $283.350
SP MIXES SP-B SAC-B PG70-22
TON 8,596.000 $120.000 $150.000 $165.000 $127.130 $131.790
TACK COAT
GAL 5,580.000 $4.500 $6.000 $6.500 $4.000 $4.550
PLANE & TEXT ASPH CONC PAV(1.5")
SY 4,037.000 $3.000 $15.000 $3.000 $21.890 $7.140
CEM STABIL BKFL
CY 210.000 $250.000 $500.000 $130.000 $345.600 $400.000
TRENCH EXCAVATION PROTECTION
LF 75.000 $50.000 $100.000 $136.000 $54.000 $62.500
TEMPORARY SPL SHORING
SF 1,712.000 $35.000 $75.000 $23.500 $64.830 $106.250
DRILL SHAFT (SIGN MTS) (24 IN)
LF 56.000 $260.000 $275.000 $280.000 $216.000 $350.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 96.000 $500.000 $300.000 $275.000 $297.000 $343.750
CL B CONC (FLUME)
CY 92.000 $1,500.000 $1,000.000 $625.000 $945.000 $1,093.750
CL C CONC (RAIL FOUNDATION)
CY 381.000 $1,000.000 $1,000.000 $670.000 $2,700.000 $3,125.000
RIPRAP (CONC)(4 IN)
CY 6.000 $500.000 $1,000.000 $1,200.000 $1,080.000 $1,250.000
RIPRAP (CONC)(5 IN)
CY 11.000 $500.000 $1,000.000 $1,250.000 $1,080.000 $1,250.000
RIPRAP (CONC)(6 IN)
CY 544.000 $500.000 $1,000.000 $600.000 $945.000 $1,093.750
RIPRAP (MOW STRIP)(4 IN)
CY 54.000 $500.000 $1,000.000 $660.000 $972.000 $1,200.000
RAIL (TY SSTR)
LF 3,376.000 $68.000 $100.000 $72.000 $270.000 $312.500
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 450.000 $600.000 $600.000 $650.000 $1,069.200 $1,237.500
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 1.000 $7,000.000 $6,000.000 $4,000.000 $5,400.000 $6,250.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C)
EA 6.000 $10,000.000 $3,665.000 $16,000.000 $11,340.000 $13,125.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $2,700.000 $3,000.000 $2,000.000 $2,970.000 $3,437.500
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $3,000.000 $3,500.000 $2,600.000 $3,240.000 $3,750.000
CLEAN EXIST CULVERTS
EA 1.000 $5,000.000 $25,000.000 $2,750.000 $9,567.330 $3,125.000
REMOV STR (SET)
EA 4.000 $500.000 $2,000.000 $610.000 $810.000 $937.500
REMOV STR (WINGWALL)
EA 6.000 $2,000.000 $2,000.000 $1,600.000 $1,080.000 $1,250.000
REMOV STR (HEADWALL)
EA 1.000 $2,000.000 $2,000.000 $2,800.000 $45,488.430 $1,250.000
REMOV STR (PIPE)
LF 154.000 $19.000 $60.000 $23.000 $21.600 $25.000
REMOV STR (BOX CULVERT)
LF 48.000 $156.000 $60.000 $85.000 $108.000 $125.000
MOBILIZATION
LS 1.000 $334,603.830 $850,000.000 $890,000.000 $804,028.990 $971,866.260
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $15,000.000 $21,000.000 $78,525.000 $16,253.180 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,000.000 $18,500.000 $9,000.000 $15,448.710 $24,500.000
TMA (STATIONARY)
DAY 123.000 $95.000 $450.000 $490.000 $250.000 $175.000
TMA (MOBILE OPERATION)
HR 120.000 $68.000 $60.000 $63.000 $250.000 $119.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 240.000 $30.000 $30.000 $26.000 $42.740 $37.810
CONSTRUCTION EXITS (REMOVE)
SY 240.000 $10.000 $14.000 $13.500 $14.470 $14.760
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,316.000 $4.150 $5.250 $5.250 $5.150 $9.340
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,316.000 $1.070 $1.150 $1.150 $1.380 $2.040
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 160.000 $15.000 $12.000 $12.000 $13.780 $14.530
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $3.000 $2.000 $2.000 $4.170 $2.040
CONSTRUCTING DETOURS
SY 190.000 $80.000 $100.000 $190.000 $211.710 $121.580
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,340.000 $40.000 $100.000 $100.000 $200.000 $15.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $60.000 $100.000 $100.000 $65.410 $25.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 13,760.000 $5.000 $5.000 $7.750 $12.300 $8.750
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 240.000 $15.000 $5.000 $9.000 $33.210 $12.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,340.000 $5.000 $15.000 $10.000 $24.820 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $15.000 $15.000 $10.500 $56.360 $15.000
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
LF 2,280.000 $24.000 $50.000 $100.000 $200.000 $21.250
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 6,530.000 $9.000 $10.000 $12.000 $18.720 $12.500
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 2,280.000 $19.000 $50.000 $10.000 $32.640 $15.000
DRIVEWAYS (CONC)
SY 1,044.000 $150.000 $175.000 $175.000 $246.900 $274.380
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 14,686.000 $0.250 $1.150 $0.440 $0.240 $0.280
MTL W-BEAM GD FEN (STEEL POST)
LF 700.000 $34.000 $39.000 $39.000 $71.600 $48.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $3,440.000 $2,800.000 $2,800.000 $5,978.650 $3,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,138.000 $1,700.000 $1,700.000 $3,121.200 $2,125.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $825.000 $850.000 $850.000 $1,560.600 $1,062.500
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,850.000 $3,500.000 $3,500.000 $6,426.000 $4,375.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,610.000 $2,500.000 $1,300.000 $4,660.690 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,300.000 $2,500.000 $1,100.000 $2,433.030 $1,875.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 1.000 $6,500.000 $63,000.000 $56,000.000 $69,305.680 $78,572.500
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 1.000 $8,033.000 $2,500.000 $35,000.000 $13,495.530 $12,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $900.000 $650.000 $250.000 $270.000 $312.500
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 12.000 $5,300.000 $6,000.000 $6,200.000 $6,696.000 $7,750.000
CONDT (PVC) (SCH 80) (2")
LF 4,595.000 $14.750 $13.000 $7.000 $7.560 $8.750
CONDT (PVC) (SCH 80) (2") (BORE)
LF 480.000 $28.250 $25.000 $24.000 $25.920 $30.000
ELEC CONDR (NO.6) BARE
LF 5,195.000 $2.500 $2.750 $2.250 $2.430 $2.810
ELEC CONDR (NO.6) INSULATED
LF 10,390.000 $2.700 $3.000 $2.750 $2.970 $3.440
GROUND BOX TY A (122311)W/APRON
EA 12.000 $2,000.000 $1,350.000 $1,850.000 $1,998.000 $2,312.500
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
EA 1.000 $10,000.000 $7,000.000 $10,000.000 $10,800.000 $12,500.000
ALUMINUM SIGNS (TY G)
SF 445.000 $42.000 $36.000 $36.000 $38.880 $45.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $727.000 $780.000 $909.000 $842.400 $1,136.250
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 12.000 $810.000 $850.000 $990.000 $918.000 $1,237.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,100.000 $1,100.000 $1,187.000 $1,188.000 $1,483.750
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $735.000 $300.000 $675.000 $324.000 $843.750
REMOVE SM RD SN SUP&AM
EA 18.000 $94.000 $100.000 $150.000 $108.000 $250.270
INSTALL LRSS (STRUCT STEEL)
LB 2,689.000 $7.400 $11.000 $8.200 $7.830 $10.250
REMOVE LRSA
EA 3.000 $888.000 $2,000.000 $800.000 $1,080.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 21.000 $102.000 $75.000 $76.000 $81.000 $95.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 15.000 $54.000 $35.000 $30.000 $100.980 $68.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $50.000 $47.000 $85.000 $73.440 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 16.000 $46.000 $36.000 $30.000 $100.980 $68.750
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 7.000 $102.000 $82.000 $82.000 $88.560 $102.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 15.000 $41.000 $15.000 $18.000 $16.200 $150.160
INSTL OM LG RD SIGN (2-OM-TY1)Y
EA 8.000 $100.000 $13.000 $108.000 $14.040 $135.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 7.000 $30.000 $14.000 $13.000 $15.120 $16.250
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 19,922.000 $0.200 $0.900 $0.280 $0.190 $0.230
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 16,676.000 $0.200 $0.900 $0.280 $0.190 $0.230
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 6,490.000 $0.750 $2.000 $1.200 $0.920 $1.060
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 458.000 $1.200 $1.000 $1.000 $1.300 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,571.000 $0.940 $1.100 $0.890 $0.920 $1.060
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 300.000 $3.200 $2.500 $3.000 $3.240 $3.750
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 4,197.000 $0.800 $0.800 $0.700 $0.810 $0.940
PAVEMENT SLER 6"
LF 10,617.000 $0.350 $0.500 $0.240 $0.380 $0.440
PAVEMENT SLER 8"
LF 1,448.000 $0.550 $0.550 $0.280 $0.810 $0.940
PAVEMENT SLER 12"
LF 300.000 $1.150 $0.600 $0.400 $2.160 $2.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 15,179.000 $0.480 $0.750 $0.670 $0.750 $0.860
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 12,761.000 $0.470 $0.750 $0.670 $0.750 $0.860
PREFAB PM TY C (W)(24")(SLD)
LF 1,347.000 $15.000 $13.500 $12.900 $11.880 $13.750
PREFAB PM TY C (W)(NUMBER)
EA 1.000 $233.000 $300.000 $210.000 $486.000 $562.500
PREFAB PM TY C (W)(36")(YLD TRI)
EA 12.000 $35.000 $50.000 $55.000 $27.000 $31.250
REFL PAV MRKR TY II-A-A
EA 312.000 $4.200 $5.000 $3.990 $4.320 $5.000
REFL PAV MRKR TY II-C-R
EA 210.000 $4.400 $5.000 $3.990 $4.320 $5.000
ELIM EXT PM & MRKS (6")
LF 5,220.000 $0.140 $3.000 $5.000 $5.830 $1.060
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $11,800.000 $7,500.000 $15,000.000 $16,200.000 $18,750.000
BONDING COURSE
GAL 3,124.000 $3.430 $10.000 $6.500 $5.590 $4.780
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $10,000.000 $25,000.000 $9,500.000 $10,483.050 $21,000.000
AUTO PORT SMART TRAFFIC MONITORING SYS
DAY 123.000 $260.000 $2,500.000 $300.000 $162.000 $312.500
1
RC PIPE (CL III)(18 IN)
LF 1,279.000 $150.000 $110.000 $83.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 1,279.000 $150.000 $0.000 $0.000 $178.200 $206.250
2
STONE-MTRX-ASPH SMAR-F SAC-A
TON 0.000 $130.000 $0.000 $0.000 $0.000 $0.000
2A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 2,846.000 $130.000 $220.000 $210.000 $174.170 $173.520
3
RC PIPE (CL III)(24 IN)
LF 110.000 $190.000 $110.000 $123.000 $0.000 $0.000
3A
THERMOPLASTIC PIPE (PP) (24")
LF 110.000 $190.000 $0.000 $0.000 $199.800 $231.250
Totals: $6,124,084.340 $8,792,882.850 $8,969,828.750 $10,399,949.720 $11,127,858.540
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $70,000.00