LYNN SL 76 (0068-09-012)

Items: 197

County: LYNN
Length: N/A
Highway: SL 76
District: LUBBOCK
Control Number: 0068-09-012
DBE Goal: N/A
Project: STP 2020(861)
Guaranty: N/A
Time: 637 WORKING DAYS
Engineer's Estimate: $20,572,612.31
Date: 05/08/2020 (6 years ago)
Contract Number: N/A
Type: SAFETY WIDENING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$20,572,612.31
$23,982,637.32
Over/Under Est: 16.58% $3,410,025.01
$29,402,487.78
Over/Under Est: 42.92% $8,829,875.47
Amt Left: 22.6% $5,419,850.46
$29,999,397.79
Over/Under Est: 45.82% $9,426,785.48
Amt Left: 25.09% $6,016,760.47
Delta: -2.03% -$596,910.01
Subcontractor Percentage Amount
ARTEX ELECTRIC, INC. 4.93% $1,182,344.02
SEALS COMMERCIAL CONCRETE, LLC 4.65% $1,115,192.64
VACA UNDERGROUND UTILITIES INC 3.91% $937,721.12
CEMTECH CONCRETE 3.61% $865,773.21
D & E LOGISTICS, LLC 2.72% $652,327.74
DTM TRUCKING, INC. 2.72% $652,327.74
INDUSTRIAL FABRICS, INC. 2.30% $551,600.66
TEXOP CONSTRUCTION 1.71% $410,103.10
BARRICADES UNLIMITED 1.60% $383,722.20
4-WAY HAULERS, LLC 1.07% $256,614.22
FC TRAFFIC CONTROL, INC. 0.78% $187,064.57
TRP CONSTRUCTION GROUP, LLC 0.70% $167,878.46
DK CONTRACTING, LLC 0.68% $163,081.93
FUSION COMMUNICATIONS, LLC 0.56% $134,302.77
TORO BRAVO CONSTRUCTION, LLC 0.38% $91,134.02
J. H. ODEN CONTRACTING COMPANY 0.22% $52,761.80
PRIMATE CONSTRUCTION, LP 0.22% $52,761.80
RED STAR CONSTRUCTION, LLC 0.14% $33,575.69
NOLAND"S CONSTRUCTION, LLC 0.14% $33,575.69
MARCOM"S MOWING SERVICE, LLC 0.14% $33,575.69
PEREZ REBAR CONSTRUCTION 0.13% $31,177.43
WAYNE BRYANT LOGISTICS, LLC 0.08% $19,186.11
SOUTHWEST CONTRACTING AND CONSTRUCTION 0.05% $11,991.32
DRILL PIER CONSTRUCTION, LLC 0.04% $9,593.05
WESTEX COOPERATIVE GIN 0.04% $9,593.05
DE NOVO TRUCKING, LLC 0.04% $9,593.05
LMSE TRUCKING, LLC 0.04% $9,593.05
ADVANCED POWER SWEEP 0.03% $7,194.79
GORMAN OUTDOOR, INC. 0.03% $7,194.79
K.A. FARMER TRUCKING, INC. 0.01% $2,398.26
RILEY INDUSTRIAL SERVICES, INC. 0.01% $2,398.26
Total: 33.68% $8,077,352.23

Bid Items & Bid Tabulations

197 Total 0 of 197
LYNN  |  SL 76  |  LUBBOCK  |  0068-09-012  |  05/08/2020  |  $20,572,612.31  |  STP 2020(861)  |  SAFETY WIDENING  |  637 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN BUTLER CONSTRUCTION, INC.
A. L. HELMCAMP, INC.
DUININCK, INC.
PREPARING ROW
STA 182.040 $6,000.000 $4,883.000 $7,500.000 $5,810.000
SUBGRADE WIDENING (ORD COMP)
SY 11,636.720 $7.000 $15.000 $4.000 $8.400
BACKFILL (TY B)
STA 115.400 $250.000 $346.000 $220.000 $210.000
BLADING
STA 115.400 $250.000 $208.000 $220.000 $195.000
BLOCK SODDING
SY 1,379.000 $3.000 $8.000 $6.400 $7.750
ROLL SODDING
SY 6,409.000 $4.000 $7.500 $6.400 $7.150
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 42,086.000 $0.300 $0.200 $0.170 $0.210
VEGETATIVE WATERING
MG 1,646.000 $25.000 $47.000 $28.000 $37.500
PROOF ROLLING
HR 110.000 $100.000 $111.000 $85.000 $185.000
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 5,709.950 $20.000 $17.000 $13.000 $31.000
CEMENT
TON 1,027.570 $180.000 $196.000 $240.000 $225.000
CEMENT TREAT (EXIST MATL) (6")
SY 31,176.380 $2.500 $3.000 $4.000 $2.900
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 67,619.320 $3.000 $3.000 $5.000 $3.350
PRIME COAT (MC-30)
GAL 20,649.620 $4.000 $5.000 $5.000 $5.050
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 5,471.000 $4.000 $6.000 $3.500 $4.550
FOG SEAL (CSS-1H)
GAL 8,751.680 $4.000 $6.500 $3.500 $4.850
ASPH (AC-20-5TR)
GAL 18,228.000 $5.000 $4.500 $3.700 $5.500
AGGR(TY-PB GR-4 SAC-B)
CY 413.340 $100.000 $318.000 $210.000 $325.000
D-GR HMA(SQ) TY-C PG70-28
TON 3,817.770 $150.000 $160.000 $200.000 $215.000
TACK COAT
GAL 44.140 $4.000 $4.000 $3.000 $3.550
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 13,243.860 $150.000 $155.000 $200.000 $185.000
TACK COAT
GAL 147.630 $4.000 $4.000 $3.000 $3.550
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,085.350 $50.000 $60.000 $84.000 $110.000
PLANE ASPH CONC PAV(8" TO 10")
SY 93,085.750 $5.000 $7.250 $11.000 $9.450
PLANE ASPH CONC PAV (2"-3")
SY 12,022.200 $2.000 $3.250 $3.000 $4.550
PLANE ASPH CONC PAV (16")
SY 16,599.000 $10.000 $13.000 $19.000 $21.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 16,599.000 $80.000 $170.000 $124.000 $200.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 814.500 $200.000 $149.000 $215.000 $365.000
CEM STABIL BKFL
CY 53.800 $300.000 $259.000 $260.000 $300.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 310.000 $30.000 $58.250 $40.000 $95.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 1,300.000 $300.000 $172.000 $150.000 $165.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 26.000 $300.000 $369.000 $320.000 $355.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $425.000 $523.000 $450.000 $505.000
RETAINING WALL (SPECIAL)
SF 916.000 $350.000 $60.000 $160.000 $180.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 90.000 $100.000 $238.000 $80.000 $355.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $200.000 $501.000 $113.000 $595.000
RIPRAP (CONC)(5 IN)
CY 241.200 $500.000 $665.000 $640.000 $715.000
RIPRAP (CONC) (CL A )
CY 39.000 $400.000 $710.000 $640.000 $715.000
RAIL (HANDRAIL)(TY B)
LF 596.000 $200.000 $117.000 $240.000 $260.000
RETROFIT RAIL (TY T223)
LF 72.000 $200.000 $549.000 $400.000 $895.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 18.000 $300.000 $1,982.000 $450.000 $510.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 6.000 $350.000 $2,387.000 $550.000 $610.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 56.400 $500.000 $1,873.000 $650.000 $750.000
RC PIPE (CL III)(24 IN)
LF 204.000 $150.000 $223.000 $160.000 $180.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $5,500.000 $9,956.000 $6,000.000 $6,800.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 2.000 $6,000.000 $10,945.000 $9,500.000 $10,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 2.000 $7,000.000 $11,038.000 $9,600.000 $11,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
EA 6.000 $8,000.000 $12,993.000 $9,200.000 $10,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 11.000 $2,000.000 $2,715.000 $1,600.000 $1,800.000
ADJUSTING MANHOLES
EA 31.000 $1,500.000 $1,993.000 $2,800.000 $1,400.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 21.000 $800.000 $677.000 $1,600.000 $1,200.000
CLEAN EXIST CULVERTS
EA 9.000 $2,500.000 $3,217.000 $1,900.000 $6,000.000
REMOV STR (PIPE)
EA 2.000 $1,500.000 $1,954.000 $270.000 $300.000
MOBILIZATION
LS 1.000 $1,870,000.000 $2,188,342.000 $2,900,000.000 $3,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 39.000 $15,000.000 $6,697.000 $41,000.000 $24,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 150.000 $25.000 $43.000 $43.000 $45.500
ROCK FILTER DAMS (REMOVE)
LF 150.000 $10.000 $14.000 $11.000 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 600.000 $30.000 $28.000 $32.000 $41.500
CONSTRUCTION EXITS (REMOVE)
SY 600.000 $10.000 $9.000 $11.000 $12.000
SANDBAGS FOR EROSION CONTROL
EA 246.000 $8.000 $7.750 $15.000 $18.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,020.000 $5.000 $2.750 $4.300 $3.550
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,020.000 $3.000 $1.250 $1.100 $1.200
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,465.000 $7.000 $6.000 $5.500 $7.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,465.000 $3.000 $1.750 $1.100 $1.200
CONSTRUCTING DETOURS
SY 2,380.000 $30.000 $92.000 $100.000 $78.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 840.000 $40.000 $104.000 $110.000 $110.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $60.000 $115.000 $110.000 $130.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,400.000 $10.000 $5.500 $33.000 $31.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 280.000 $10.000 $22.000 $33.000 $34.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 840.000 $10.000 $14.000 $30.000 $23.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $21.000 $30.000 $24.500
CONC CURB & GUTTER (TY II)
LF 4,770.000 $30.000 $54.000 $42.000 $47.500
CONC CURB & GUTTER (SLOTTED)
LF 177.000 $30.000 $99.000 $69.000 $77.500
CONCRETE GUTTER (MODIFIED)
LF 186.000 $40.000 $110.000 $60.000 $65.500
INTERSECTIONS (ACP)
SY 8,060.000 $40.000 $47.000 $55.000 $47.500
DRIVEWAYS (CONC)
SY 10,943.000 $80.000 $120.000 $117.000 $130.000
DRIVEWAYS (ACP)
SY 3,833.000 $50.000 $82.000 $59.000 $155.000
CONC SIDEWALKS (5")
SY 11,221.000 $60.000 $91.400 $104.000 $115.000
CURB RAMPS (TY 1)
SY 232.400 $200.000 $166.000 $160.000 $180.000
CURB RAMPS (TY 2)
SY 44.320 $200.000 $195.000 $160.000 $180.000
CURB RAMPS (TY 3)
SY 15.220 $200.000 $423.000 $160.000 $180.000
CURB RAMPS (TY 5)
SY 11.440 $200.000 $533.000 $160.000 $180.000
CURB RAMPS (TY 7)
SY 280.940 $200.000 $165.000 $160.000 $180.000
CURB RAMPS (TY 10)
SY 10.500 $200.000 $775.000 $160.000 $180.000
CONCRETE SIDEWALK (STEPS)
SY 37.500 $200.000 $457.000 $223.000 $250.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $30.000 $39.000 $45.000 $36.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $3,000.000 $2,400.000 $2,100.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 215.000 $3.000 $6.250 $3.500 $3.550
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $300.000 $431.000 $240.000 $355.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $4,001.000 $3,800.000 $3,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $400.000 $615.000 $245.000 $355.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 31.000 $350.000 $597.000 $355.000 $355.000
REMOVE RD IL ASM (SHOE-BASE)
EA 21.000 $500.000 $615.000 $540.000 $595.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 37.000 $3,000.000 $3,447.000 $3,000.000 $3,300.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 101.000 $3,000.000 $3,693.000 $3,200.000 $3,600.000
IN RD IL (TY SA) 50T-12-12(400W EQ)LED
EA 1.000 $5,000.000 $4,585.000 $4,000.000 $4,400.000
CONDT (PVC) (SCH 80) (2")
LF 22,106.000 $7.000 $6.250 $5.400 $5.950
CONDT (PVC) (SCH 80) (2") (BORE)
LF 6,181.000 $20.000 $16.000 $14.000 $15.500
CONDT (PVC) (SCH 80) (4")
LF 54.000 $15.000 $8.500 $7.500 $8.350
CONDT (PVC) (SCH 80) (4") (BORE)
LF 228.000 $25.000 $30.000 $25.000 $28.500
ELEC CONDR (NO.8) INSULATED
LF 1,224.000 $1.300 $1.250 $1.100 $1.200
ELEC CONDR (NO.6) BARE
LF 282.000 $1.500 $1.250 $1.200 $1.300
ELEC CONDR (NO.4) BARE
LF 27,991.000 $1.750 $1.500 $1.200 $1.350
ELEC CONDR (NO.4) INSULATED
LF 55,982.000 $2.000 $1.500 $1.300 $1.450
ELEC CONDR (NO.2) INSULATED
LF 18.000 $4.000 $1.750 $1.600 $1.800
GROUND BOX TY A (122311)W/APRON
EA 107.000 $900.000 $554.000 $480.000 $535.000
GROUND BOX TY C (162911)W/APRON
EA 20.000 $1,000.000 $800.000 $690.000 $775.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,000.000 $985.000 $850.000 $955.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 3.000 $5,000.000 $7,140.000 $6,200.000 $6,900.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $5,000.000 $6,401.000 $5,500.000 $6,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 61.000 $800.000 $917.000 $800.000 $955.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 73.000 $900.000 $1,057.000 $920.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $900.000 $1,247.000 $1,100.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 18.000 $800.000 $991.000 $860.000 $985.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 9.000 $900.000 $1,075.000 $930.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 159.000 $150.000 $185.000 $80.000 $120.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $60.000 $18.000 $12.000 $24.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 7.000 $90.000 $37.000 $13.000 $24.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 19.000 $90.000 $117.000 $100.000 $180.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 79,385.000 $0.300 $0.200 $0.140 $0.150
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 28,379.000 $0.300 $0.250 $0.210 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,052.000 $0.600 $0.250 $0.320 $0.360
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,520.000 $1.500 $1.250 $1.060 $1.200
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 984.000 $3.500 $2.500 $2.120 $2.400
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 19.000 $200.000 $92.000 $80.000 $89.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 37,423.000 $0.300 $0.200 $0.140 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 187,188.000 $0.300 $0.160 $0.140 $0.150
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 768.000 $2.000 $4.250 $3.710 $4.150
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 6,893.000 $2.000 $4.250 $3.710 $4.150
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 2,776.000 $2.000 $3.000 $2.650 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,116.000 $2.000 $3.000 $2.650 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,858.000 $1.000 $1.250 $0.400 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 23,274.000 $1.000 $1.250 $0.400 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,203.000 $1.000 $1.000 $0.850 $0.950
PAVEMENT SEALER 4"
LF 8,565.000 $0.200 $0.250 $0.270 $0.300
PAVEMENT SEALER 6"
LF 1,739.000 $0.300 $0.500 $0.370 $0.420
PAVEMENT SEALER 8"
LF 1,003.000 $0.400 $0.500 $0.530 $0.600
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 29,135.000 $0.500 $0.500 $0.420 $0.480
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 4,109.000 $0.500 $0.750 $0.640 $0.710
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,808.000 $0.500 $0.500 $0.420 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 43,344.000 $0.500 $0.500 $0.420 $0.480
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 2,014.000 $15.000 $21.000 $18.020 $20.500
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 446.000 $25.000 $42.000 $36.040 $40.500
PREFAB PAV MRK TY B (W)(ARROW)
EA 22.000 $350.000 $739.000 $636.000 $715.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 6.000 $400.000 $1,231.000 $1,060.000 $1,200.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 550.000 $15.000 $9.250 $7.950 $8.950
PREFAB PAV MRK TY C (W) (18") (SLD)
LF 74.000 $20.000 $18.000 $15.900 $18.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,197.000 $25.000 $18.000 $15.900 $18.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $300.000 $339.000 $291.500 $330.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $350.000 $615.000 $530.000 $595.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 36.000 $150.000 $31.000 $26.500 $30.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 450.000 $15.000 $9.250 $7.950 $8.950
REFL PAV MRKR TY I-C
EA 379.000 $3.200 $3.750 $3.290 $3.700
REFL PAV MRKR TY II-A-A
EA 1,028.000 $3.200 $3.750 $3.290 $3.700
ELIM EXT PAV MRK & MRKS (4")
LF 175,598.000 $0.600 $0.550 $0.480 $0.540
ELIM EXT PAV MRK & MRKS (6")
LF 14,866.000 $0.800 $0.750 $0.710 $0.800
ELIM EXT PAV MRK & MRKS (8")
LF 1,740.000 $1.500 $1.000 $0.950 $1.050
ELIM EXT PAV MRK & MRKS (12")
LF 31,239.000 $2.000 $2.250 $1.860 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 264.000 $4.000 $4.250 $3.710 $4.150
ELIM EXT PAV MRK & MRKS (ARROW)
EA 25.000 $20.000 $62.000 $53.000 $59.500
PAV SURF PREP FOR MRK (4")
LF 8,565.000 $0.500 $0.250 $0.270 $0.300
PAV SURF PREP FOR MRK (6")
LF 1,739.000 $0.800 $0.500 $0.370 $0.420
PAV SURF PREP FOR MRK (8")
LF 1,003.000 $1.000 $0.500 $0.530 $0.600
PAV SURF PREP FOR MRK (12")
LF 2,014.000 $2.000 $1.000 $0.800 $0.890
PAV SURF PREP FOR MRK (24")
LF 446.000 $4.000 $1.750 $1.590 $1.800
PAV SURF PREP FOR MRK (ARROW)
EA 22.000 $50.000 $31.000 $26.500 $30.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 6.000 $100.000 $43.000 $37.100 $41.500
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $25,000.000 $15,387.000 $14,000.000 $15,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,500.000 $9,848.000 $8,500.000 $9,500.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $250.000 $277.000 $240.000 $270.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $250.000 $277.000 $240.000 $270.000
VEH SIG SEC (12")LED(YEL)
EA 6.000 $250.000 $277.000 $240.000 $270.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $250.000 $277.000 $240.000 $270.000
VEH SIG SEC (12")LED(RED)
EA 6.000 $250.000 $277.000 $240.000 $270.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $250.000 $277.000 $240.000 $270.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $560.000 $739.000 $640.000 $715.000
BACK PLATE (12")(3 SEC)
EA 6.000 $95.000 $123.000 $110.000 $120.000
BACK PLATE (12")(4 SEC)
EA 4.000 $100.000 $142.000 $120.000 $135.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 388.000 $2.000 $4.250 $3.700 $4.150
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 262.000 $2.250 $5.000 $4.300 $4.750
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 232.000 $2.500 $5.500 $4.800 $5.350
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 372.000 $5.000 $6.250 $5.400 $5.950
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $3,000.000 $2,154.000 $1,900.000 $2,100.000
INS TRF SIG PL AM(S)1 ARM(36')ILSN
EA 2.000 $7,800.000 $12,618.000 $11,000.000 $12,000.000
INS TRF SIG PL AM(S)1 ARM(50')ILSN
EA 2.000 $12,000.000 $27,082.000 $23,000.000 $26,000.000
LITTER REMOVAL
CYC 9.000 $1,500.000 $10,786.000 $3,700.000 $9,500.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 8.000 $1,000.000 $1,885.000 $2,500.000 $2,400.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 102,219.380 $6.000 $7.000 $6.000 $6.450
ASPH FOR REINF FAB (AC-20-5TR)
GAL 20,443.880 $5.000 $5.750 $3.800 $3.650
D-GR HMA TY-B PG70-28
TON 34,663.640 $115.000 $108.000 $198.000 $145.000
D-GR HMA TY-D PG70-28
TON 348.640 $200.000 $212.000 $214.000 $220.000
TACK COAT
GAL 12,428.750 $4.000 $4.000 $3.000 $3.550
RETROFIT DET WARN SURF(SURF APPLIED)
EA 6.000 $500.000 $1,392.000 $800.000 $715.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,000.000 $23,986.000 $20,000.000 $18,000.000
TMA (STATIONARY)
DAY 2,548.000 $100.000 $133.000 $50.000 $300.000
TMA (MOBILE OPERATION)
DAY 171.000 $200.000 $676.000 $50.000 $1,100.000
TEMP SPEED MONITOR SYS
EA 2.000 $7,000.000 $11,660.000 $10,000.000 $12,000.000
Totals: $20,572,612.310 $23,982,637.328 $29,402,487.784 $29,999,397.838