LUBBOCK IH0027 (6448-11-001)

Items: 50

County: LUBBOCK
Length: N/A
Highway: IH0027
District: LUBBOCK
Control Number: 6448-11-001
DBE Goal: N/A
Project: RMC - 644811001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,303,000.00
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
MIKE STROOPE
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$1,303,000.00
$1,048,565.00
Over/Under Est: -19.53% -$254,435.00
$1,054,407.50
Over/Under Est: -19.08% -$248,592.50
Amt Left: 0.56% $5,842.50
Over/Under Est: 87.88% $1,145,050.00
Amt Left: 133.47% $1,399,485.00
Delta: -132.17% -$1,393,642.50
Over/Under Est: 107.33% $1,398,500.00
Amt Left: 157.64% $1,652,935.00
Delta: -10.35% -$253,450.00

Bid Items & Bid Tabulations

50 Total 0 of 50
LUBBOCK  |  IH0027  |  LUBBOCK  |  6448-11-001  |  09/07/2023  |  $1,303,000.00  |  RMC - 644811001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
BARRICADES UNLIMITED
MARCOM'S MOWING SERVICE, LLC
FC TRAFFIC CONTROL, INC.
MOBILIZATION (CALLOUT)
EA 25.000 $100.000 $1.000 $50.000 $500.000 $2,500.000
MOBILIZATION (EMERGENCY)
EA 25.000 $100.000 $4,150.000 $500.000 $4,000.000 $5,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,500.000 $55.000 $30.000 $30.000 $38.000 $100.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 50.000 $50.000 $30.000 $30.000 $70.000 $200.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,000.000 $800.000 $1.000 $1,950.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,000.000 $500.000 $100.000 $1,620.000 $2,000.000
MTL BM GD FEN TRANS (31"-28")
EA 25.000 $500.000 $500.000 $500.000 $720.000 $100.000
REMOVE METAL BEAM GUARD FENCE
LF 2,500.000 $1.000 $13.000 $0.250 $5.000 $100.000
REMOVE TERMINAL ANCHOR SECTION
EA 25.000 $250.000 $1.000 $10.000 $500.000 $1,000.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $250.000 $1.000 $10.000 $500.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $3,000.000 $4,500.000 $3,000.000 $4,800.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 50.000 $500.000 $1.000 $100.000 $500.000 $2,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $20.000 $1.000 $40.000 $40.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $20.000 $1.000 $1.000 $40.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $20.000 $1.000 $1.000 $40.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 100.000 $20.000 $1.000 $1.000 $40.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $20.000 $30.000 $18.000 $40.000 $100.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $25.000 $1.000 $10.000 $75.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $20.000 $20.000 $25.000 $70.000 $100.000
REM / REPL TIMBER POST W / O CONC FND
EA 250.000 $75.000 $100.000 $50.000 $80.000 $100.000
REM / REPL STEEL POST W / O CONC FND
EA 250.000 $75.000 $100.000 $90.000 $100.000 $100.000
REM / REPL TIMBER POST W / CONC FND
EA 250.000 $75.000 $1.000 $1.000 $100.000 $100.000
REM / REPL STEEL POST W / CONC FND
EA 250.000 $75.000 $1.000 $1.000 $120.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $500.000 $50.000 $1.000 $450.000 $100.000
REALIGN POSTS
EA 100.000 $25.000 $40.000 $100.000 $80.000 $100.000
REMOVE & REPLACE BLOCKOUT
EA 250.000 $25.000 $10.000 $0.250 $30.000 $300.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $500.000 $100.000 $0.250 $100.000 $200.000
REPLACE SGT OBJECT MARKER
EA 10.000 $200.000 $1.000 $0.250 $100.000 $200.000
REMOVE AND REPLACE DAT
EA 10.000 $1,250.000 $1,000.000 $1,000.000 $1,560.000 $200.000
REPLACE POSTS (TL-3)
EA 50.000 $200.000 $200.000 $125.000 $350.000 $100.000
REPLACE POSTS (TL-4)
EA 500.000 $200.000 $225.000 $150.000 $430.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $150.000 $100.000 $10.000 $300.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $150.000 $200.000 $10.000 $300.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $2,000.000 $800.000 $500.000 $1,820.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $2,000.000 $1,000.000 $4,000.000 $1,820.000 $100.000
REPLACE CABLE (TL-3)
LF 1,000.000 $2.500 $3.000 $3.000 $8.000 $50.000
REPLACE CABLE (TL-4)
LF 1,000.000 $2.500 $3.000 $10.000 $8.000 $50.000
CHECK / RE-TENSION CABLE
EA 25.000 $500.000 $100.000 $10.000 $500.000 $200.000
REPLACE POST HARDWARE (TL-4)
EA 25.000 $25.000 $80.000 $35.000 $100.000 $200.000
REPLACE POST HARDWARE (TL-3)
EA 25.000 $25.000 $80.000 $35.000 $100.000 $200.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 50.000 $250.000 $50.000 $100.000 $1,850.000 $100.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 10.000 $250.000 $50.000 $100.000 $1,850.000 $50.000
REMOVE / REPLACE (QUAD - ELITE) NARROW
EA 10.000 $2,500.000 $2,500.000 $20,000.000 $28,500.000 $50.000
REMOVE / REPLACE (QUAD - ELITE) WIDE
EA 10.000 $35,000.000 $1,000.000 $20,000.000 $38,000.000 $50.000
REPAIR (QUADGUARD - ELITE) (CYLINDER)
EA 50.000 $250.000 $100.000 $100.000 $3,000.000 $50.000
REPAIR (BEAT - SSCC)
EA 2.000 $13,500.000 $5,000.000 $3,500.000 $5,000.000 $500.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 10.000 $250.000 $200.000 $100.000 $1,000.000 $100.000
QUAD(W)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 10.000 $250.000 $200.000 $100.000 $1,000.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $50.000 $80.000 $10.000 $150.000 $100.000
TMA (STATIONARY)
DAY 200.000 $100.000 $1.000 $50.000 $250.000 $500.000
Totals: $1,303,000.000 $1,048,565.000 $1,054,407.500 $2,448,050.000 $2,701,500.000