LUBBOCK US0087 (6391-87-001)

Items: 33

County: LUBBOCK
Length: N/A
Highway: US0087
District: LUBBOCK
Control Number: 6391-87-001
DBE Goal: N/A
Project: RMC - 639187001
Guaranty: N/A
Time: 85 W
Engineer's Estimate: $408,771.00
Date: 05/04/2022 (4 years ago)
Contract Number: N/A
Type: RIPRAP REPAIR
Mail/Deliver Bids To: N/A
MICHAEL WITTIE
ROSS MCMILLAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$408,771.00
$413,625.00
Over/Under Est: 1.19% $4,854.00
Over/Under Est: 16.04% $65,569.00
Amt Left: 14.68% $60,715.00

Bid Items & Bid Tabulations

33 Total 0 of 33
LUBBOCK  |  US0087  |  LUBBOCK  |  6391-87-001  |  05/04/2022  |  $408,771.00  |  RMC - 639187001  |  RIPRAP REPAIR  |  85 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TALBRAN ENTERPRISES LLC
TI-ZACK CONCRETE, INC.
PREPARING ROW
STA 2.000 $10,000.000 $8,800.000 $4,000.000
REMOVING CONC (RIPRAP)
SY 330.000 $200.000 $80.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 126.000 $60.000 $60.000 $72.000
FLOWABLE BACKFILL
CY 4.000 $800.000 $1,200.000 $1,000.000
RETAINING WALL (CAST - IN - PLACE)
SF 2.000 $550.000 $2,200.000 $100.000
RIPRAP (CONC)(5 IN)
CY 325.000 $410.000 $660.000 $1,000.000
RIPRAP (CONC)(DISSIPATER)
CY 12.000 $1,200.000 $2,200.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $1,000.000 $550.000 $1,000.000
GABION MATTRESSES (GALV)
CY 10.000 $300.000 $770.000 $300.000
CLEAN EXIST CULVERTS
EA 3.000 $2,500.000 $7,700.000 $1,000.000
MOBILIZATION
LS 1.000 $37,000.000 $5,000.000 $22,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $1,000.000 $1,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 35.000 $60.000 $60.000 $10.000
ROCK FILTER DAMS (REMOVE)
LF 35.000 $60.000 $20.000 $5.000
SANDBAGS FOR EROSION CONTROL
EA 148.000 $12.000 $20.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 560.000 $8.000 $10.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 280.000 $3.000 $1.000 $1.000
CONC SIDEWALKS (4")
SY 6.000 $400.000 $550.000 $135.000
MTL W-BEAM GD FEN (STEEL POST)
LF 375.000 $50.000 $44.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,500.000 $3,300.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $10.000 $2.000 $9.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $220.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $4,000.000 $5,500.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $500.000 $220.000 $500.000
GROUND BOX TY B (122322)W/APRON
EA 1.000 $1,200.000 $1,100.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $1,000.000 $2,200.000 $300.000
REMOVE SM RD SN SUP&AM
EA 1.000 $300.000 $550.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $30.000 $50.000 $55.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 2.000 $150.000 $50.000 $150.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 6.000 $200.000 $50.000 $150.000
DITCH CLEAN / RESHAPING(CU YD IN PLACE)
CY 20.000 $50.000 $220.000 $40.000
DRAIN INLET CLEANING (BY LOCATION)
EA 1.000 $500.000 $5,500.000 $1,000.000
TMA (STATIONARY)
DAY 85.000 $225.000 $1.000 $1.000
Totals: $408,771.000 $413,625.000 $474,340.000