Show Job Controls
Bid Cobra

LUBBOCK IH0027 (6368-25-001)

Items: 40

County: LUBBOCK
Length: N/A
Highway: IH0027
District: LUBBOCK
Control Number: 6368-25-001
DBE Goal: N/A
Project: RMC - 636825001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $560,650.00
Date: 10/02/2020 (5 years ago)
Contract Number: N/A
Type: CALL-OUT MBGF REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$560,650.00
$507,820.00
Over/Under Est: -9.42% -$52,830.00
Over/Under Est: -6.26% -$35,120.00
Amt Left: 3.49% $17,710.00
Over/Under Est: 8.03% $45,020.00
Amt Left: 19.27% $97,850.00
Delta: -15.25% -$80,140.00
Over/Under Est: 17.38% $97,461.00
Amt Left: 29.6% $150,291.00
Delta: -8.66% -$52,441.00

Bid Items & Bid Tabulations

40 Total 0 of 40
LUBBOCK  |  IH0027  |  LUBBOCK  |  6368-25-001  |  10/02/2020  |  $560,650.00  |  RMC - 636825001  |  CALL-OUT MBGF REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
BARRICADES UNLIMITED
BK FIELD OPERATIONS LLC
BT CONSTRUCTORS, LLC
REMOVING CONC (MISC)
SY 250.000 $75.000 $50.000 $40.000 $50.000 $30.000
RIPRAP (CONC)(4 IN)
CY 24.000 $625.000 $200.000 $300.000 $400.000 $500.000
MOBILIZATION (CALLOUT)
EA 20.000 $100.000 $1.000 $1.000 $1.000 $5.000
MOBILIZATION (EMERGENCY)
EA 50.000 $100.000 $1.000 $1.000 $1.000 $5.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,500.000 $16.000 $18.000 $18.000 $26.000 $20.000
MTL THRIE-BEAM GD FEN (STEEL POST)
LF 150.000 $22.000 $22.000 $10.000 $60.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $22.000 $22.000 $22.000 $150.000 $1,200.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $100.000 $100.000 $10.000 $100.000 $700.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $100.000 $100.000 $10.000 $500.000 $650.000
MTL BEAM GD FEN TRANS (T6)
EA 2.000 $100.000 $100.000 $10.000 $350.000 $350.000
SHORT RADIUS
LF 150.000 $20.000 $20.000 $7.600 $25.000 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,000.000 $1,000.000 $1,000.000 $1,100.000 $1,100.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $10.000 $10.000 $5.000 $18.000 $15.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $15.000 $15.000 $10.000 $80.000 $49.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 5.000 $500.000 $500.000 $100.000 $150.000 $1,200.000
MTL BEAM GD FEN TRANS (TL2) 28"
EA 5.000 $600.000 $600.000 $100.000 $500.000 $450.000
MTL BM GD FEN TRANS (31"-28")
EA 50.000 $500.000 $10.000 $450.000 $650.000 $375.000
REMOVE METAL BEAM GUARD FENCE
LF 15,000.000 $0.010 $0.010 $1.250 $0.100 $2.250
REMOVE TERMINAL ANCHOR SECTION
EA 25.000 $1.000 $1.000 $1.000 $1.000 $225.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $1.000 $1.000 $1.000 $1.000 $225.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $1.000 $1.000 $1.000 $1.000 $1.000
RM MTL BM GD FEN TRANS (T101)
EA 5.000 $1.000 $1.000 $1.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $2,500.000 $3,500.000 $2,700.000 $3,000.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 50.000 $100.000 $1.000 $25.000 $1.000 $300.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 2.000 $1,700.000 $1,700.000 $100.000 $2,600.000 $1,200.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 2.000 $1,700.000 $1,700.000 $100.000 $2,600.000 $850.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $5.000 $5.000 $5.000 $5.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $5.000 $5.000 $5.000 $5.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $5.000 $5.000 $5.000 $5.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 100.000 $5.000 $5.000 $5.000 $5.000 $0.010
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $18.000 $18.000 $18.000 $21.000 $19.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $22.000 $22.000 $10.000 $30.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $22.000 $22.000 $10.000 $25.000 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $20.000 $20.000 $20.000 $40.000 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $100.000 $20.000 $65.000 $50.000 $35.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $50.000 $20.000 $60.000 $40.000 $55.000
REALIGN POSTS
EA 100.000 $10.000 $10.000 $10.000 $1.000 $18.000
REMOVE & REPLACE BLOCKOUT
EA 250.000 $10.000 $10.000 $10.000 $5.000 $12.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $100.000 $100.000 $1.000 $1.000 $100.000
TMA (STATIONARY)
DAY 200.000 $50.000 $50.000 $15.000 $1.000 $250.000
Totals: $560,650.000 $507,820.000 $525,530.000 $605,670.000 $658,111.000