Show Job Controls
Bid Cobra

LUBBOCK FM 2641 (2740-02-016)

Items: 135

County: LUBBOCK
Length: N/A
Highway: FM 2641
District: LUBBOCK
Control Number: 2740-02-016
DBE Goal: N/A
Project: F 2022(158)
Guaranty: N/A
Time: 302 WORKING DAYS
Engineer's Estimate: $6,182,628.55
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$6,182,628.55
1
$7,222,200.00
Over/Under Est: 16.81% $1,039,571.45
$8,816,370.04
Over/Under Est: 42.6% $2,633,741.49
Amt Left: 22.07% $1,594,170.04

Bid Items & Bid Tabulations

135 Total 0 of 135
LUBBOCK  |  FM 2641  |  LUBBOCK  |  2740-02-016  |  12/01/2021  |  $6,182,628.55  |  F 2022(158)  |  HWY IMPRV  |  302 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
DUININCK, INC.
REMOVING CONC (RIPRAP)
SY 2,363.000 $12.500 $29.000 $10.500
REMOVING CONC (MEDIANS)
SY 462.000 $12.500 $29.000 $20.500
REMOVING CONC (CURB AND GUTTER)
LF 5,100.000 $10.000 $21.250 $10.500
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 974.000 $10.000 $14.000 $13.000
REMOVE STAB BASE & ASPH PAV (5"-12")
SY 20,926.000 $11.000 $27.750 $12.500
EXCAVATION (ROADWAY)
CY 3,410.000 $13.000 $26.000 $64.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 160.000 $12.000 $57.800 $68.000
BACKFILL (TY B)
STA 21.000 $225.000 $1,200.000 $435.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 3,108.000 $0.300 $0.500 $0.770
DRILL SEED (TEMP)(WARM OR COOL)
SY 3,108.000 $1.000 $0.500 $0.720
VEGETATIVE WATERING
MG 29.000 $20.000 $31.500 $32.000
PRIME COAT (MC-30)
GAL 4,299.000 $5.000 $7.000 $6.750
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 1,244.000 $5.000 $7.000 $5.900
FOG SEAL (CSS-1H)
GAL 3,868.000 $5.000 $4.000 $5.050
ASPH (AC-20-5TR)
GAL 8,250.000 $4.500 $7.000 $5.450
AGGR(TY-PB GR-4 SAC-B)
CY 180.000 $125.000 $150.000 $345.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 642.000 $40.000 $110.000 $150.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 20,926.000 $120.000 $105.000 $157.000
CONC PVMT (CRCP)(JCT TERMINAL)(10")
SY 557.000 $110.000 $111.000 $240.000
CEM STABIL BKFL
CY 300.000 $90.000 $48.000 $270.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $375.000 $450.000 $450.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $475.000 $500.000 $525.000
CL A CONC (COLLAR)
EA 2.000 $800.000 $1,000.000 $1,600.000
RIPRAP (CONC)(5 IN)
CY 171.000 $700.000 $525.000 $720.000
RC PIPE (CL III)(24 IN)
LF 130.000 $200.000 $175.000 $100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $3,000.000 $2,200.000 $3,300.000
CLEAN EXIST CULVERTS
EA 10.000 $2,500.000 $2,500.000 $7,200.000
REMOV STR (SET)
EA 2.000 $750.000 $235.000 $1,200.000
MOBILIZATION
LS 1.000 $750,000.000 $710,000.000 $875,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $12,500.000 $41,750.000 $31,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $40.000 $35.000 $48.000
ROCK FILTER DAMS (REMOVE)
CY 80.000 $45.000 $15.000 $36.000
SANDBAGS FOR EROSION CONTROL
EA 1,030.000 $14.000 $15.000 $14.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,675.000 $3.500 $3.000 $2.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,675.000 $0.500 $1.000 $0.960
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 360.000 $7.000 $7.000 $4.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 360.000 $1.000 $1.000 $1.200
CONSTRUCTING DETOURS
SY 625.000 $100.000 $75.000 $150.000
COLORED TEXTURED CONC (5")
SY 1,877.000 $80.000 $75.000 $130.000
CONC CURB & GUTTER (TY II)
LF 5,100.000 $25.000 $33.900 $24.000
DRIVEWAYS (CONC)
SY 628.000 $125.000 $105.000 $89.500
CONC SIDEWALKS (5")
SY 562.000 $90.000 $80.000 $120.000
CURB RAMPS (TY 2)
SY 135.000 $100.000 $135.000 $395.000
CURB RAMPS (TY 10)
SY 20.000 $100.000 $170.000 $395.000
CURB RAMPS (TY 20)
SY 52.000 $100.000 $160.000 $395.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $750.000 $375.250 $660.000
REMOVE RD IL ASM (SHOE-BASE)
EA 1.000 $1,000.000 $550.000 $600.000
CONDT (PVC) (SCH 80) (2")
LF 735.000 $14.000 $11.000 $12.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 875.000 $26.000 $19.200 $20.500
CONDT (PVC) (SCH 80) (4")
LF 365.000 $27.500 $21.000 $22.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 500.000 $35.000 $29.000 $31.000
ELEC CONDR (NO.8) INSULATED
LF 2,925.000 $1.500 $1.250 $1.300
ELEC CONDR (NO.6) BARE
LF 1,275.000 $2.000 $1.400 $1.500
ELEC CONDR (NO.2) INSULATED
LF 1,080.000 $4.000 $3.300 $3.600
GROUND BOX TY A (122311)W/APRON
EA 6.000 $900.000 $825.000 $895.000
GROUND BOX TY D (162922)
EA 2.000 $1,000.000 $660.000 $720.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,000.000 $1,000.000 $1,000.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $6,500.000 $12,500.000 $7,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $700.000 $700.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $850.000 $800.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $500.000 $625.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 6.000 $750.000 $625.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $750.000 $900.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $750.000 $1,000.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,000.000 $1,200.000 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 9.000 $500.000 $900.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 3.000 $500.000 $900.000 $1,300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,500.000 $5,000.000 $3,600.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $750.000 $700.000 $780.000
REMOVE SM RD SN SUP&AM
EA 47.000 $100.000 $250.000 $120.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 732.000 $3.500 $5.650 $6.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 732.000 $3.500 $5.650 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 2,430.000 $2.750 $3.400 $3.600
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,430.000 $2.750 $3.400 $3.600
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,600.000 $1.000 $1.150 $1.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 520.000 $15.000 $22.600 $24.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,600.000 $1.000 $1.150 $1.200
PAVEMENT SEALER 4"
LF 13,464.000 $0.250 $0.300 $0.300
PAVEMENT SEALER 6"
LF 1,320.000 $0.250 $0.400 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 6,732.000 $0.500 $0.850 $0.900
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,320.000 $0.750 $1.400 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,732.000 $0.500 $0.850 $0.900
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 6,004.000 $4.000 $7.350 $7.800
PREFAB PAV MRK TY B (W)(6")(BRK)
LF 690.000 $6.000 $10.700 $11.500
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 910.000 $7.000 $14.100 $15.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 668.000 $23.000 $22.600 $24.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 758.000 $30.000 $45.000 $48.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 12.000 $400.000 $817.000 $865.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 6.000 $500.000 $1,410.000 $1,500.000
PREFAB PAV MRK TY B (W)(UTURN ARROW)
EA 2.000 $500.000 $2,710.000 $2,900.000
PREFAB PAV MRK TY B (W)(LNDP ARROW)
EA 1.000 $500.000 $2,930.000 $3,100.000
PREFAB PAV MRK TY B (W)(WORD)
EA 2.000 $1,500.000 $1,350.000 $1,400.000
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
EA 16.000 $50.000 $113.000 $120.000
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 5,080.000 $4.500 $7.050 $7.500
REFL PAV MRKR TY I-C
EA 58.000 $3.000 $8.450 $8.950
REFL PAV MRKR TY II-A-A
EA 96.000 $3.000 $8.450 $8.950
REFL PAV MRKR TY II-C-R
EA 88.000 $3.000 $8.450 $8.950
ELIM EXT PAV MRK & MRKS (4")
LF 7,200.000 $0.500 $1.150 $1.200
ELIM EXT PAV MRK & MRKS (24")
LF 520.000 $3.500 $6.750 $7.200
PAV SURF PREP FOR MRK (4")
LF 24,548.000 $0.300 $0.300 $0.300
PAV SURF PREP FOR MRK (6")
LF 2,013.000 $0.750 $0.400 $0.440
PAV SURF PREP FOR MRK (8")
LF 910.000 $0.600 $0.550 $0.600
PAV SURF PREP FOR MRK (12")
LF 668.000 $1.000 $1.150 $1.200
PAV SURF PREP FOR MRK (24")
LF 758.000 $1.750 $2.250 $2.400
PAV SURF PREP FOR MRK (ARROW)
EA 13.000 $40.000 $28.200 $30.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 6.000 $25.000 $39.500 $42.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 2.000 $25.000 $113.000 $120.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $50.000 $113.000 $120.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 16.000 $7.000 $11.300 $12.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 4.000 $100.000 $564.000 $600.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $20,000.000 $25,500.000 $15,000.000
VEH SIG SEC (12")LED(GRN)
EA 16.000 $260.000 $300.000 $300.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $260.000 $300.000 $300.000
VEH SIG SEC (12")LED(YEL)
EA 16.000 $260.000 $300.000 $300.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $260.000 $300.000 $300.000
VEH SIG SEC (12")LED(RED)
EA 16.000 $260.000 $300.000 $300.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $260.000 $300.000 $300.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $750.000 $725.000 $780.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 16.000 $125.000 $150.000 $150.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $125.000 $160.000 $165.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,600.000 $2.500 $4.250 $4.500
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 440.000 $2.500 $4.400 $4.800
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,120.000 $3.000 $6.100 $6.600
TRF SIG CBL (TY A)(12 AWG)(16 CONDR)
LF 1,490.000 $6.000 $8.500 $8.950
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 2.000 $15,000.000 $23,950.000 $17,500.000
INS TRF SIG PL AM(S)2 ARM(50 - 40')LUM
EA 2.000 $35,000.000 $46,950.000 $45,000.000
PED POLE ASSEMBLY
EA 9.000 $2,500.000 $2,000.000 $2,100.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $900.000 $825.000 $895.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,500.000 $2,500.000 $2,400.000
LITTER REMOVAL
CYC 2.000 $5,000.000 $2,500.000 $3,000.000
D-GR HMA TY-B PG70-28
TON 4,944.000 $130.000 $155.000 $210.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 706.000 $75.000 $75.000 $150.000
MLTPLY PV MK (Y) (MED NOSE)
EA 2.000 $500.000 $1,130.000 $1,200.000
TMA (STATIONARY)
DAY 550.000 $225.000 $245.000 $300.000
TMA (MOBILE OPERATION)
DAY 72.000 $225.000 $550.000 $1,100.000
Totals: $6,182,628.550 $7,222,200.000 $8,816,370.040