Show Job Controls
Bid Cobra

LUBBOCK FM 1585 (1502-01-031)

Items: 404

County: LUBBOCK
Length: 4.0000 MILES (3.5839 MILES)
Highway: FM 1585
District: LUBBOCK
Control Number: 1502-01-031
DBE Goal: 0.0%
Project: F 2026(487)
Guaranty: $100,000.00
Time: 957 WORKING DAYS
Engineer's Estimate: $296,722,196.95
Date: 07/02/2026 1:00 PM CDT (16 days ago)
Contract Number: 7263243
Type: INTERCHANGE IMPROVEMENT
Project ID: A00124174
Contract Type: FEDERAL
Project Description: CONVERSION OF FM 1585 TO SL 88. CONSTRUCTION OF 4 NEW FRONTAGE LANES AND WIDENING FROM 2 MAIN LANES TO 4 MAIN LANES AND CONSTRUCTION OF OVERPASS WITH ADA RAMPS, SIDEWALK ELEMENTS, SHARED-USE PATHS AND PEDESTRIAN SIGNALS.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$296,722,196.95
Over/Under Est: -25.3% -$75,081,694.73
$242,252,262.00
Over/Under Est: -18.36% -$54,469,934.95
Amt Left: 9.3% $20,611,759.78
$269,724,854.40
Over/Under Est: -9.1% -$26,997,342.55
Amt Left: 21.69% $48,084,352.18
Delta: -11.34% -$27,472,592.40
Over/Under Est: -6.7% -$19,875,822.15
Amt Left: 24.91% $55,205,872.58
Delta: -2.64% -$7,121,520.40
$307,007,227.07
Over/Under Est: 3.47% $10,285,030.12
Amt Left: 38.52% $85,366,724.85
Delta: -10.89% -$30,160,852.27

Bid Items & Bid Tabulations

404 Total 0 of 404
LUBBOCK  |  FM 1585  |  LUBBOCK  |  1502-01-031  |  07/02/2026 1:00 PM CDT  |  $296,722,196.95  |  F 2026(487)  |  INTERCHANGE IMPRV  |  957 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
WEBBER, LLC
SEMA CONSTRUCTION, INC.
ZACHRY CONSTRUCTION CORPORATION
PULICE CONSTRUCTION, INC.
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 3.000 $3,200.000 $5,000.000 $4,030.000 $6,033.790 $1,218.660 $50,000.000
PREP ROW (TREE PRUNE AND TRIM)
STA 1.000 $1,300.000 $15,000.000 $7,330.000 $28,314.230 $6,128.880 $10,000.000
DISPOSAL OF WATER WELL
EA 4.000 $1,400.000 $7,500.000 $3,580.000 $5,000.000 $2,451.550 $7,500.000
REMOV CONC (RIPRAP)
SY 29,584.000 $18.000 $6.000 $7.650 $9.890 $8.490 $30.000
REMOV CONC (DRIVEWAYS)
SY 12,865.000 $18.000 $13.000 $16.700 $11.640 $10.230 $100.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 641.000 $18.000 $11.000 $26.600 $24.920 $14.420 $50.000
REMOV CONC (CURB & GUTTER)
LF 17,502.000 $12.000 $3.000 $4.650 $6.260 $21.630 $50.000
REMOV CONC (FLUME)
SY 98.000 $100.000 $50.000 $82.750 $31.650 $36.480 $80.000
REMOV CONC (MISC)
SY 5,898.000 $37.000 $8.000 $12.200 $8.920 $19.420 $80.000
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 249,379.000 $6.500 $7.000 $6.450 $3.720 $10.910 $15.000
EXCAV (ROADWAY)
CY 209,733.000 $20.000 $47.000 $20.300 $13.540 $10.500 $46.500
EMBANK (FNL)(DC)(TY B)
CY 38,206.000 $28.000 $10.000 $2.300 $6.000 $10.000 $31.040
EMBANK (FNL)(DC)(TY C)
CY 257,237.000 $29.000 $14.000 $3.050 $18.580 $45.000 $15.000
FURN & PLACE TOPSOIL (4")
SY 401,027.000 $1.200 $1.000 $1.100 $4.780 $1.920 $3.760
BLOCK SODDING
SY 15,973.000 $5.000 $6.000 $7.000 $5.970 $8.710 $7.140
DRILL SEED (PERM_URBAN_SAND)
SY 400,916.000 $0.500 $0.200 $0.200 $0.120 $0.240 $0.190
DRILL SEED (TEMP_WARM_COOL)
SY 53,979.000 $0.500 $0.200 $0.200 $0.120 $0.220 $0.180
HYDRO MULCH SEED (PERM_URBAN_SANDY)
SY 400,916.000 $1.000 $0.500 $0.600 $0.450 $0.720 $0.590
VEGETATIVE WATERING
TGL 15,853.000 $12.000 $30.000 $18.000 $42.720 $28.830 $11.160
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 33,374.000 $5.500 $1.500 $1.350 $0.740 $1.680 $1.380
PROOF ROLLING
HR 200.000 $160.000 $100.000 $169.000 $209.150 $78.450 $500.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 8,325.000 $21.000 $15.000 $20.800 $14.900 $19.230 $50.000
FL BS (CMP IN PLC) (TY A GR 4) (9")
SY 14,654.000 $34.000 $20.000 $31.250 $21.460 $27.600 $75.000
LIME TRT (SUBGRADE) (8")
SY 19,329.000 $6.000 $3.250 $6.600 $6.130 $6.570 $10.060
LIME (QUICKLIME) (GRADE DS)
TON 383.000 $440.000 $425.000 $384.000 $378.500 $470.350 $740.850
SALV, HAUL & STKPL RCL APH PV (3 1/2")
SY 249,379.000 $4.500 $2.600 $2.700 $1.970 $0.700 $30.000
PRIME COAT (MC-30)
GAL 4,597.000 $8.000 $5.000 $9.200 $10.000 $7.670 $11.130
FOG SEAL (CSS-1H)
GAL 3,546.000 $6.000 $5.000 $7.300 $5.000 $8.580 $8.150
D-GR HMA TY-C SAC-B PG70-28
TON 93,077.000 $150.000 $144.000 $150.000 $164.250 $200.100 $201.770
D-GR HMA TY-D SAC-A PG70-28
TON 1,457.000 $145.000 $151.000 $165.000 $186.000 $226.760 $282.430
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 4,258.000 $210.000 $197.000 $186.000 $179.000 $218.180 $347.610
TACK COAT
GAL 2,779.000 $3.000 $5.000 $5.950 $3.000 $3.680 $8.150
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 5,000.000 $50.000 $51.000 $53.250 $75.000 $50.640 $101.610
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 14,340.000 $70.000 $100.000 $81.000 $90.000 $77.480 $233.750
PLANE ASPH CONC PAV(2")
SY 8,168.000 $2.000 $4.000 $1.650 $0.800 $1.890 $4.450
CONC PVMT (CRCP) (8")
SY 55,505.000 $120.000 $70.000 $75.750 $74.970 $85.000 $105.000
CONC PVMT (CRCP) (9")
SY 78,688.000 $125.000 $85.000 $86.000 $85.900 $90.000 $105.000
CONC PVMT (CRCP) (10")
SY 105,211.000 $175.000 $80.000 $89.250 $87.420 $95.000 $105.000
CONC PVMT (CRCP) (12")
SY 124,236.000 $150.000 $95.000 $103.000 $103.030 $105.000 $125.000
CONC PVMT(TRANSITION SLAB) (8")
SY 707.000 $175.000 $255.000 $350.000 $189.830 $201.570 $125.000
CONC PVMT(TRANSITION SLAB) (9")
SY 144.000 $215.000 $275.000 $375.000 $223.590 $207.670 $155.000
CONC PVMT(TRANSITION SLAB) (12")
SY 171.000 $300.000 $315.000 $425.000 $213.230 $220.110 $175.000
STRUCT EXCAV
CY 6,052.000 $100.000 $20.000 $16.400 $34.130 $37.120 $50.000
STRUCT EXCAV (BOX)
CY 10,358.000 $20.000 $5.000 $6.450 $29.710 $10.000 $20.000
STRUCT EXCAV (PIPE)
CY 153,669.000 $20.000 $5.000 $7.050 $31.530 $15.000 $10.000
STRUCT EXCAV (SPECIAL)
CY 161,670.000 $80.000 $39.000 $8.950 $24.340 $13.000 $60.000
FLOWABLE BACKFILL
CY 1,190.000 $300.000 $140.000 $96.750 $178.910 $292.240 $329.930
FLOWABLE FILL (EMBANKMENT)
CY 47,743.000 $300.000 $140.000 $78.750 $140.000 $175.000 $302.550
TRENCH EXCAVATION PROTECTION
LF 55,045.000 $11.000 $3.000 $4.650 $3.000 $3.710 $2.840
TEMPORARY SPL SHORING
SF 108,167.000 $40.000 $30.000 $21.700 $65.160 $32.380 $27.680
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 8.000 $26,000.000 $55,000.000 $27,100.000 $27,067.500 $48,110.000 $27,876.050
DRILL SHAFT (18 IN)
LF 120.000 $180.000 $200.000 $100.000 $222.860 $180.090 $174.110
DRILL SHAFT (36 IN)
LF 4,254.000 $330.000 $500.000 $225.000 $251.980 $307.140 $274.940
DRILL SHAFT (42 IN)
LF 125.000 $330.000 $450.000 $350.000 $603.500 $612.880 $633.330
DRILL SHAFT (48 IN)
LF 3,304.000 $400.000 $650.000 $375.000 $376.730 $313.400 $405.470
DRILL SHAFT (54 IN)
LF 4,852.000 $750.000 $750.000 $435.000 $472.800 $404.750 $514.800
DRILL SHAFT (SIGN MTS) (24 IN)
LF 186.000 $370.000 $165.000 $175.000 $230.000 $287.570 $176.750
DRILL SHAFT (SIGN MTS) (36 IN)
LF 290.000 $500.000 $375.000 $375.000 $380.000 $475.110 $478.570
DRILL SHAFT (SIGN MTS) (48 IN)
LF 44.000 $700.000 $475.000 $475.000 $530.000 $662.650 $889.810
DRILL SHAFT (SIGN MTS) (54 IN)
LF 144.000 $770.000 $550.000 $550.000 $680.000 $850.200 $1,076.320
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 79.000 $750.000 $600.000 $600.000 $880.000 $1,100.250 $907.340
DRILL SHAFT (HIGH MAST POLE) (66 IN)
LF 326.000 $1,300.000 $650.000 $650.000 $980.000 $1,225.290 $1,010.270
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 350.000 $330.000 $195.000 $195.000 $270.000 $337.580 $262.030
DRILL SHAFT (TRF SIG POLE) (42 IN)
LF 72.000 $500.000 $450.000 $450.000 $480.000 $600.140 $713.340
CL C CONC (ABUT)
CY 223.700 $400.000 $1,800.000 $1,590.000 $2,081.650 $1,440.790 $1,600.000
CL C CONC (CAP)
CY 239.200 $1,650.000 $1,500.000 $1,870.000 $2,495.680 $1,383.220 $2,000.000
CL C CONC (CAP)(MASS)
CY 485.500 $1,500.000 $1,000.000 $906.000 $1,745.390 $1,287.880 $1,400.000
CL C CONC (COLUMN)
CY 1,342.400 $1,450.000 $1,600.000 $1,830.000 $2,150.050 $2,376.380 $2,300.000
CL C CONC (COLUMN)(MASS)
CY 9,178.600 $1,250.000 $800.000 $1,040.000 $1,502.890 $1,492.230 $1,350.000
CL C CONC (FOOTING)
CY 627.000 $1,200.000 $900.000 $1,320.000 $1,849.200 $1,582.890 $1,800.000
CL C CONC (FOOTING)(MASS)
CY 2,812.800 $1,150.000 $200.000 $1,120.000 $1,537.410 $1,096.140 $1,250.000
CL F CONC (CAP)(INVT)
CY 3,115.300 $1,050.000 $1,300.000 $1,440.000 $2,124.550 $1,934.660 $1,900.000
CL F CONC (CAP)(STRDL)
CY 661.800 $1,150.000 $1,700.000 $1,760.000 $2,626.320 $4,674.440 $1,500.000
CL A CONC (CHANNEL LINING)
CY 561.000 $660.000 $650.000 $615.000 $563.540 $837.620 $839.930
REINF CONC SLAB
SF 393,045.000 $31.000 $30.000 $27.200 $31.410 $35.660 $30.000
APPROACH SLAB
CY 420.000 $770.000 $250.000 $635.000 $678.980 $759.270 $750.000
RETAINING WALL (MSE)
SF 121,125.000 $83.000 $100.000 $112.000 $155.510 $80.430 $125.000
PRESTR CONC GIRDER (TX54)
LF 43,356.480 $290.000 $140.000 $260.000 $260.010 $272.850 $240.000
EPOXY WATERPROOF FINISH (TY X)
SF 28,634.000 $11.000 $3.570 $3.550 $3.570 $6.790 $3.570
RIPRAP (CONC)(5 IN)
CY 1,826.400 $750.000 $650.000 $637.000 $603.200 $519.750 $654.220
RIPRAP (CONC)(6 IN)
CY 24.000 $660.000 $650.000 $659.000 $552.960 $695.710 $484.910
RIPRAP (CONC)(FLUME)
CY 20.000 $600.000 $650.000 $684.000 $713.550 $926.140 $714.620
RIPRAP (MOW STRIP)(5 IN)
CY 1,271.000 $690.000 $650.000 $665.000 $713.540 $600.780 $559.470
RIPRAP (STONE TY R)(DRY)(6 IN)
CY 2,392.000 $220.000 $250.000 $209.000 $320.870 $251.380 $349.560
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 24.000 $360.000 $600.000 $362.000 $605.920 $732.810 $2,200.810
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,047.000 $160.000 $200.000 $211.000 $293.030 $258.110 $341.980
RIPRAP (STONE PROTECTION)(18 IN)
CY 47.000 $200.000 $600.000 $226.000 $640.640 $341.460 $1,249.480
SLIDING ELASTOMERIC BEARING (ES 8)
EA 8.000 $4,000.000 $6,000.000 $5,320.000 $5,288.450 $9,448.220 $4,113.100
SLIDING ELASTOMERIC BEARING (ES9) (MOD)
EA 8.000 $3,900.000 $6,000.000 $6,440.000 $6,791.470 $11,179.040 $4,113.100
ELASTOMERIC BEARING (F9) (MOD)
EA 8.000 $4,000.000 $6,000.000 $7,120.000 $7,516.840 $12,051.700 $4,113.100
CLEANING AND SEALING EXISTING JOINTS
LF 13,879.000 $40.000 $6.000 $6.000 $8.000 $9.810 $6.120
STR STEEL (PLATE GIRDER)
LB 4,062,000.000 $3.400 $2.600 $3.700 $2.840 $3.280 $3.500
RAIL (TY SSTR)
LF 18,042.000 $80.000 $55.000 $81.500 $98.520 $73.050 $45.160
RAIL (TY T80SS)
LF 23,025.000 $170.000 $115.000 $127.000 $155.550 $122.220 $91.240
RAIL (HANDRAIL)(TY E)
LF 167.000 $175.000 $450.000 $221.000 $350.000 $204.170 $231.050
RAIL (TY SSTR)(MOD)
LF 1,323.000 $170.000 $70.000 $334.000 $312.910 $221.920 $44.260
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,346.000 $250.000 $160.000 $210.000 $217.530 $272.270 $289.680
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 112.000 $200.000 $160.000 $207.000 $218.850 $272.280 $351.840
CONC BOX CULV (3 FT X 3 FT)
LF 2,666.000 $500.000 $250.000 $240.000 $250.000 $309.510 $750.000
CONC BOX CULV (4 FT X 4 FT)
LF 159.000 $710.000 $310.000 $334.000 $310.000 $383.790 $750.000
CONC BOX CULV (5 FT X 3 FT)
LF 251.000 $670.000 $360.000 $338.000 $360.000 $445.690 $750.000
CONC BOX CULV (5 FT X 5 FT)
LF 515.000 $660.000 $430.000 $411.000 $430.000 $532.350 $900.000
CONC BOX CULV (6 FT X 3 FT)
LF 179.000 $750.000 $460.000 $442.000 $460.000 $569.490 $1,100.000
RC PIPE (CL III)(54 IN)
LF 489.000 $385.000 $285.000 $263.000 $285.000 $352.840 $547.100
RC PIPE (CL III)(60 IN)
LF 1,806.000 $500.000 $330.000 $307.000 $330.000 $408.550 $542.910
RC PIPE (CL IV)(24 IN)
LF 2,886.000 $160.000 $108.000 $132.000 $108.000 $133.700 $247.120
RC PIPE (CL IV)(30 IN)
LF 1,544.000 $275.000 $135.000 $142.000 $135.000 $167.130 $257.760
RC PIPE (CL IV)(36 IN)
LF 890.000 $280.000 $195.000 $192.000 $195.000 $241.410 $382.630
RC PIPE (CL IV)(42 IN)
LF 4,178.000 $340.000 $250.000 $243.000 $250.000 $309.500 $460.400
RC PIPE (CL IV)(48 IN)
LF 4,982.000 $380.000 $310.000 $301.000 $310.000 $383.790 $461.550
RC PIPE (CL IV)(54 IN)
LF 1,021.000 $550.000 $425.000 $389.000 $425.000 $526.160 $538.440
RC PIPE (CL V)(24 IN)
LF 977.000 $185.000 $115.000 $152.000 $115.000 $142.370 $257.820
RC PIPE (CL V)(30 IN)
LF 132.000 $240.000 $165.000 $192.000 $165.000 $204.270 $296.120
RC PIPE (CL V)(48 IN)
LF 764.000 $260.000 $400.000 $378.000 $400.000 $495.210 $678.300
MANH (COMPL)(PRM)(48IN)
EA 1.000 $7,000.000 $12,115.000 $12,072.450 $12,115.000 $14,998.770 $14,708.750
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $8,000.000 $9,185.000 $6,040.000 $9,185.000 $11,371.340 $8,550.060
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 3.000 $14,000.000 $9,070.000 $5,650.000 $9,070.000 $11,228.970 $8,519.840
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 2.000 $17,000.000 $11,310.000 $7,470.000 $11,310.000 $14,002.160 $13,804.310
INLET (COMPL)(PCO)(3FT)(NONE)
EA 13.000 $5,000.000 $24,690.000 $20,150.000 $24,690.000 $30,567.060 $28,475.260
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 38.000 $6,000.000 $14,580.000 $12,250.000 $14,580.000 $18,050.520 $15,474.390
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 24.000 $6,400.000 $13,985.000 $11,780.000 $13,985.000 $17,313.890 $14,706.020
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 54.000 $6,500.000 $14,890.000 $12,500.000 $14,890.000 $18,434.310 $15,877.130
INLET (COMPL)(PCO)(4FT)(NONE)
EA 1.000 $6,200.000 $11,355.000 $9,230.000 $11,355.000 $14,057.870 $11,327.080
INLET (COMPL)(PCO)(5FT)(NONE)
EA 2.000 $6,400.000 $11,520.000 $9,130.000 $11,520.000 $14,262.150 $11,533.570
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $6,500.000 $13,862.000 $11,180.000 $13,862.000 $17,161.620 $14,552.040
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 1.000 $9,700.000 $12,405.000 $10,050.000 $12,405.000 $15,357.810 $12,676.510
INLET (COMPL)(PMBD)(4FT)
EA 11.000 $7,500.000 $12,740.000 $10,820.000 $12,740.000 $15,772.550 $13,105.560
INLET (COMPL)(PMBD)(5FT)
EA 2.000 $8,500.000 $17,535.000 $17,190.000 $17,535.000 $21,708.930 $19,277.910
INLET (COMPL)(PMBD)(6FT)
EA 3.000 $8,000.000 $24,235.000 $22,330.000 $24,235.000 $30,003.760 $30,419.480
INLET (COMPL)(PSL)(SL)(3FTX3FT)
EA 1.000 $6,000.000 $8,620.000 $6,440.000 $8,620.000 $10,671.850 $13,484.070
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 63.000 $9,000.000 $15,035.000 $11,680.000 $15,035.000 $18,613.820 $21,725.210
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 2.000 $12,000.000 $12,645.000 $9,350.000 $12,645.000 $15,654.940 $16,538.740
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 5.000 $16,000.000 $18,070.000 $17,560.000 $18,070.000 $22,371.270 $28,305.640
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 51.000 $7,000.000 $10,690.000 $6,880.000 $10,690.000 $13,234.570 $16,129.070
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 3.000 $7,000.000 $11,485.000 $9,030.000 $11,485.000 $14,218.820 $17,220.220
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 24.000 $9,200.000 $12,210.000 $8,900.000 $12,210.000 $15,116.380 $18,151.220
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 1.000 $8,000.000 $11,285.000 $9,180.000 $11,285.000 $13,971.210 $16,907.840
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 4.000 $6,000.000 $28,125.000 $22,800.000 $28,125.000 $34,819.700 $38,556.780
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 4.000 $9,000.000 $20,255.000 $16,670.000 $20,255.000 $25,076.370 $28,507.130
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 1.000 $8,000.000 $33,510.000 $27,330.000 $33,510.000 $41,486.480 $45,493.960
INLET (COMPL)(PAZD)(SL)(5FTX5FT)
EA 1.000 $6,000.000 $12,600.000 $11,040.000 $12,600.000 $15,599.230 $18,679.740
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $7,700.000 $11,410.000 $8,320.000 $11,410.000 $14,125.960 $17,142.370
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 5.000 $10,000.000 $34,375.000 $26,230.000 $34,375.000 $42,557.420 $46,680.960
INLET (COMPL) (RWI) (TY II)
EA 29.000 $13,000.000 $10,190.000 $11,370.000 $10,190.000 $12,615.550 $7,842.680
INLET (STAGE II) (PCO) (3FT) (BOTH)
EA 15.000 $13,000.000 $8,580.000 $10,650.000 $8,580.000 $10,622.330 $7,034.390
INLET (SPCL) (TY MSE2) (TOP ONLY)
EA 13.000 $2,600.000 $10,125.000 $11,870.000 $10,125.000 $12,535.090 $7,758.010
INLET (STAGEII) (PCU) (3 FT) (BOTH)
EA 2.000 $13,000.000 $9,120.000 $11,180.000 $9,120.000 $11,290.870 $7,727.320
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $27,000.000 $27,745.000 $22,720.000 $48,880.360 $30,524.950 $22,603.510
WINGWALL (PW-MSE)(DAL)
EA 1.000 $25,000.000 $29,140.000 $12,230.000 $16,940.220 $3,639.050 $20,482.550
SET (TY I) (48 IN) (6: 1) (C)
EA 2.000 $22,000.000 $19,400.000 $22,220.000 $12,246.360 $52,787.190 $28,298.210
SET (TY I)(S= 3 FT)(HW= 4 FT)(6:1)(C)
EA 2.000 $13,000.000 $12,945.000 $20,440.000 $14,246.360 $29,005.810 $24,639.920
SET (TY I)(S= 3 FT)(HW= 5 FT)(6:1)(C)
EA 2.000 $36,000.000 $18,726.000 $18,990.000 $16,246.360 $40,081.040 $29,664.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1)(C)
EA 1.000 $18,000.000 $12,344.000 $18,270.000 $19,246.330 $23,151.620 $20,819.870
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1)(C)
EA 1.000 $26,000.000 $19,150.000 $30,420.000 $19,246.330 $44,780.320 $35,442.550
SET (TY I)(S= 5 FT)(HW= 6 FT)(6:1)(C)
EA 2.000 $29,000.000 $21,385.000 $43,440.000 $20,246.360 $62,233.840 $51,513.960
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1)(C)
EA 2.000 $2,500.000 $16,185.000 $26,260.000 $20,246.360 $38,162.710 $34,285.920
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 11.000 $2,500.000 $7,775.000 $3,860.000 $7,775.000 $9,625.720 $4,733.700
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $2,700.000 $7,775.000 $3,860.000 $7,775.000 $9,625.720 $4,733.620
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $3,000.000 $10,540.000 $6,010.000 $10,540.000 $13,048.870 $8,293.880
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $6,000.000 $12,630.000 $10,330.000 $12,630.000 $15,636.370 $10,979.920
SET (TY II) (48 IN) (RCP) (6: 1) (C)
EA 1.000 $10,000.000 $15,040.000 $12,020.000 $15,040.000 $18,620.030 $14,919.300
SET (TY II) (54 IN) (RCP) (6: 1) (C)
EA 1.000 $17,000.000 $17,665.000 $16,690.000 $17,665.000 $21,869.850 $19,980.290
SET (TY II) (60 IN) (RCP) (6: 1) (C)
EA 1.000 $25,000.000 $19,810.000 $18,460.000 $19,810.000 $24,525.430 $22,738.580
GRATE AND FRAME (BRIDGE DRAIN)
EA 58.000 $6,800.000 $5,000.000 $3,700.000 $3,071.710 $3,719.740 $9,516.210
JACK BOR OR TUN PIPE(48 IN)(RC)(CL V)
LF 85.000 $3,000.000 $2,420.000 $433.000 $2,471.880 $3,042.210 $2,455.700
JACK BOR TUN BOX CULV (5 FT X 3 FT)
LF 120.000 $8,500.000 $2,880.000 $606.000 $2,554.480 $3,151.440 $2,508.720
JACK BOR TUN BOX CULV (6 FT X 3 FT)
LF 116.000 $8,600.000 $3,325.000 $725.000 $3,134.050 $3,921.610 $3,220.390
CLEAN EXIST CULVERTS
EA 7.000 $3,200.000 $5,965.000 $7,430.000 $5,000.000 $1,750.040 $21,764.760
CLEAN EXIST CULVERTS
CY 4,871.000 $100.000 $65.000 $142.000 $25.000 $26.870 $54.850
PIPE (PVC) (SCH 40) (6 IN)
LF 1,895.000 $95.000 $80.000 $159.000 $88.690 $164.390 $100.280
PIPE (PVC) (SCH 40) (8 IN)
LF 943.000 $125.000 $85.000 $174.000 $137.670 $132.590 $96.900
REMOV STR (BOX CULVERT)
EA 3.000 $26,000.000 $13,400.000 $9,250.000 $17,699.680 $21,099.640 $19,153.640
REMOV STR (INLET)
EA 5.000 $1,700.000 $700.000 $1,250.000 $1,660.160 $2,034.400 $5,266.440
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $200,000.000 $25,000.000 $370,206.000 $465,879.000 $71,316.020 $75,325.530
REMOVE STR (RAIL)
LF 236.000 $28.000 $20.000 $30.500 $34.520 $52.040 $58.420
REMOV STR (PIPE)
EA 60.000 $700.000 $550.000 $2,680.000 $2,741.200 $2,398.020 $1,961.980
MOBILIZATION
LS 1.000 $27,000,000.000 $24,108,873.000 $24,000,000.000 $29,669,733.980 $27,000,000.000 $31,236,805.200
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 55.000 $28,000.000 $15,000.000 $375,270.000 $178,362.720 $250,000.000 $34,867.730
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 730.000 $88.000 $10.000 $185.000 $98.210 $57.120 $364.600
TMA (STATIONARY)
DAY 815.000 $300.000 $50.000 $426.000 $204.610 $214.140 $353.630
TMA (MOBILE OPERATION)
DAY 24.000 $200.000 $50.000 $894.000 $2,828.880 $884.310 $837.670
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 4,210.000 $55.000 $95.000 $87.500 $54.320 $108.860 $89.290
ROCK FILTER DAMS (REMOVE)
LF 2,105.000 $15.000 $18.000 $10.000 $9.120 $12.440 $10.200
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,800.000 $35.000 $25.000 $48.000 $25.000 $59.720 $48.980
CONSTRUCTION EXITS (REMOVE)
SY 900.000 $12.000 $13.000 $10.000 $13.000 $12.440 $10.200
SANDBAGS FOR EROSION CONTROL
EA 1,887.000 $14.000 $18.500 $12.000 $18.500 $14.930 $12.240
TEMP SEDMT CONT FENCE (INSTALL)
LF 169,436.000 $7.000 $4.850 $4.000 $2.110 $4.980 $4.080
TEMP SEDMT CONT FENCE (REMOVE)
LF 84,720.000 $1.000 $1.150 $0.750 $0.540 $0.930 $0.770
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 13,432.000 $10.000 $8.500 $8.650 $8.500 $10.760 $8.830
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,720.000 $1.250 $1.250 $0.500 $1.250 $0.620 $0.510
CONSTRUCTING DETOURS
SY 16,498.000 $130.000 $103.000 $128.000 $107.550 $135.120 $82.460
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 14,890.000 $80.000 $50.000 $74.000 $85.230 $92.880 $111.890
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,400.000 $55.000 $50.000 $86.750 $99.280 $128.920 $112.230
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 480.000 $80.000 $50.000 $87.750 $103.850 $146.660 $134.340
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 760.000 $40.000 $9.000 $16.700 $11.950 $19.420 $11.090
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 80.000 $45.000 $9.000 $34.750 $24.970 $29.390 $8.850
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 13,540.000 $12.000 $6.000 $11.800 $6.590 $4.000 $13.010
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 13,813.000 $13.000 $6.000 $18.100 $11.730 $4.120 $10.410
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,160.000 $22.000 $6.000 $22.200 $16.540 $7.830 $11.530
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 12,220.000 $23.000 $6.000 $15.200 $7.250 $7.940 $8.210
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 4,400.000 $27.000 $6.000 $26.100 $13.160 $8.130 $9.910
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 480.000 $44.000 $6.000 $27.600 $26.650 $11.590 $9.860
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 4,015.000 $130.000 $60.000 $114.000 $112.770 $145.460 $62.800
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 110.000 $155.000 $200.000 $721.000 $455.920 $340.550 $260.000
CONC CURB & GUTTER (TY I)
LF 1,826.000 $50.000 $33.290 $41.250 $50.660 $19.820 $13.260
CONC CURB & GUTTER (TY II)
LF 50,357.000 $55.000 $28.200 $21.100 $29.680 $19.950 $13.290
CONC CURB & GUTTER (SLOTTED)
LF 4,948.000 $55.000 $37.700 $39.250 $49.810 $44.270 $44.990
DRIVEWAYS (CONC)
SY 8,079.000 $135.000 $100.000 $106.000 $128.360 $119.080 $75.490
DRIVEWAYS (CONC) (HES)
SY 1,956.000 $175.000 $100.000 $183.000 $150.470 $125.340 $108.400
DRIVEWAYS (ACP)
SY 2,745.000 $88.000 $82.000 $54.250 $67.850 $129.430 $91.840
CONC SIDEWALKS (5")
SY 23,548.000 $77.000 $100.000 $83.750 $65.570 $94.130 $90.030
CURB RAMPS (TY 1)
SY 183.000 $275.000 $225.000 $242.000 $332.850 $155.810 $190.230
CURB RAMPS (TY 7)
SY 284.000 $230.000 $190.000 $269.000 $332.850 $180.560 $190.230
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 3,847.000 $0.200 $0.450 $1.100 $0.930 $0.780 $1.560
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 46,842.000 $1.000 $1.350 $0.550 $0.250 $0.210 $0.410
CONC MEDIAN
SY 239.000 $110.000 $120.000 $167.000 $107.850 $218.680 $533.540
MTL W-BEAM GD FEN (TIM POST)
LF 260.000 $40.000 $29.600 $30.500 $29.600 $42.150 $31.710
MTL W-BEAM GD FEN (STEEL POST)
LF 4,125.000 $45.000 $35.500 $32.500 $35.500 $36.770 $38.030
MTL W-BEAM GD FEN ADJUSTMENT
LF 350.000 $40.000 $20.000 $11.700 $20.000 $23.290 $21.430
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $2,200.000 $1,190.000 $1,580.000 $1,190.000 $1,961.240 $1,274.970
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $1,100.000 $1,260.000 $1,010.000 $1,260.000 $1,470.930 $1,349.970
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 8.000 $3,100.000 $2,625.000 $3,160.000 $2,625.000 $2,819.280 $2,812.440
REMOVE METAL BEAM GUARD FENCE
LF 5,580.000 $20.000 $3.000 $6.500 $3.000 $3.680 $3.210
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $700.000 $220.000 $700.000 $220.000 $367.730 $235.710
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $700.000 $230.000 $700.000 $230.000 $367.730 $246.420
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $700.000 $260.000 $1,010.000 $260.000 $367.730 $278.570
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 9,740.000 $18.000 $17.250 $27.000 $17.250 $21.140 $18.480
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 12.000 $4,500.000 $3,045.000 $4,100.000 $3,045.000 $3,799.900 $3,262.430
GUARDRAIL END TREATMENT (INSTALL)
EA 19.000 $5,500.000 $3,465.000 $3,880.000 $3,465.000 $4,045.060 $3,712.410
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,400.000 $3,000.000 $1,250.000 $2,025.760 $15,322.200 $3,214.210
CRASH CUSH ATTEN (STKPL)
EA 4.000 $1,300.000 $890.000 $1,310.000 $1,960.760 $3,677.330 $953.550
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 32.000 $39,000.000 $26,650.000 $25,980.000 $26,517.680 $29,725.070 $27,213.660
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 7.000 $50,000.000 $43,000.000 $33,130.000 $39,925.340 $47,805.270 $42,856.160
CHAIN LINK FENCE (REMOVE)
LF 196.000 $6.000 $11.000 $11.000 $20.560 $5.050 $11.790
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 51.000 $440.000 $325.000 $350.000 $381.000 $398.380 $348.210
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 8.000 $1,200.000 $895.000 $750.000 $823.000 $1,103.190 $958.910
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $860.000 $2,000.000 $500.000 $500.000 $625.140 $1,000.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 18.000 $2,800.000 $1,600.000 $1,600.000 $1,800.000 $2,250.520 $1,737.930
IN RD IL (TY SP) 48S-12-12(400W EQ)LED
EA 10.000 $8,000.000 $6,500.000 $6,500.000 $8,500.000 $10,627.480 $9,055.860
IN RD IL (TY SA) 50S-12 (400W EQ) LED
EA 3.000 $8,800.000 $4,500.000 $4,500.000 $5,900.000 $7,376.730 $6,106.210
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 35.000 $7,700.000 $4,750.000 $4,750.000 $4,690.000 $5,863.870 $6,019.290
HI MST IL POLE (150 FT)(100 MPH)
EA 3.000 $60,000.000 $58,000.000 $58,000.000 $56,950.000 $71,204.100 $69,782.150
HI MST IL POLE (175 FT)(100 MPH)
EA 11.000 $88,000.000 $70,000.000 $70,000.000 $71,450.000 $89,333.330 $79,403.570
LED HI MST IL ASM (6 FIXT) (TY S)
EA 6.000 $39,500.000 $40,000.000 $40,000.000 $43,500.000 $54,387.690 $51,743.290
LED HI MST IL ASM (6 FIXT) (TY A)
EA 8.000 $34,000.000 $40,000.000 $40,000.000 $43,500.000 $54,387.690 $50,660.420
CONDT (HDPE) (2")
LF 24,213.000 $22.000 $7.500 $7.500 $10.000 $12.500 $15.870
CONDT (HDPE) (2") BORE
LF 3,180.000 $55.000 $17.500 $17.500 $25.000 $31.260 $27.770
CONDT (HDPE) (3")
LF 1,825.000 $50.000 $10.000 $10.000 $14.000 $17.500 $19.960
CONDT (HDPE) (3") BORE
LF 1,290.000 $55.000 $23.000 $23.000 $25.000 $31.260 $29.920
CONDT (HDPE) (4")
LF 75,844.000 $50.000 $20.000 $20.000 $19.000 $23.760 $33.640
CONDT (HDPE) (4") BORE
LF 15,836.000 $70.000 $25.000 $25.000 $22.000 $27.510 $35.530
CONDT (RM) (2")
LF 750.000 $77.000 $21.000 $21.000 $40.000 $50.010 $78.880
FIBER OPTIC CABLE ROAD MARKER
EA 193.000 $5.000 $175.000 $175.000 $180.000 $225.050 $378.390
ELEC CONDR (NO.14) INSULATED
LF 50,781.000 $2.000 $1.000 $1.000 $1.000 $1.250 $2.300
ELEC CONDR (NO.6) BARE
LF 3,715.000 $3.000 $1.750 $1.750 $1.750 $2.190 $2.530
ELEC CONDR (NO.6) INSULATED
LF 6,415.000 $3.000 $2.200 $2.200 $1.950 $2.440 $4.690
ELEC CONDR (NO.4) BARE
LF 33,889.000 $4.500 $2.500 $2.500 $2.900 $3.630 $4.050
ELEC CONDR (NO.4) INSULATED
LF 66,544.000 $5.000 $2.750 $2.750 $3.200 $4.000 $4.500
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
EA 75.000 $6,000.000 $5,500.000 $5,500.000 $5,500.000 $6,876.600 $7,392.780
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 10.000 $10,000.000 $7,500.000 $7,500.000 $7,200.000 $9,002.100 $11,592.630
GROUND BOX TY A (122311)
EA 20.000 $2,200.000 $650.000 $650.000 $785.000 $981.480 $1,423.290
GROUND BOX TY A (122311)W/APRON
EA 71.000 $2,200.000 $900.000 $900.000 $900.000 $1,125.260 $1,677.520
GROUND BOX TY D (162922)
EA 9.000 $1,500.000 $750.000 $750.000 $865.000 $1,081.500 $1,782.670
GROUND BOX TY D (162922)W/APRON
EA 4.000 $2,000.000 $1,100.000 $1,100.000 $1,200.000 $1,500.350 $1,873.790
REMOVE GROUND BOX
EA 2.000 $575.000 $150.000 $150.000 $245.000 $306.320 $649.500
ELC SRV TY A 240/480 100(NS)SS(E)SP(U)
EA 5.000 $6,000.000 $6,500.000 $6,500.000 $6,900.000 $8,627.020 $11,412.140
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $9,800.000 $6,500.000 $6,500.000 $5,700.000 $7,126.660 $11,342.040
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 6.000 $8,000.000 $6,500.000 $6,500.000 $5,700.000 $7,126.660 $11,342.040
ALUMINUM SIGNS (TY A)
SF 415.250 $44.000 $28.600 $50.000 $35.650 $32.760 $30.640
ALUMINUM SIGNS (TY G)
SF 904.000 $38.000 $32.700 $39.000 $30.000 $36.260 $35.030
ALUMINUM SIGNS (TY O)
SF 3,143.000 $35.000 $31.500 $31.500 $27.000 $33.760 $44.910
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 42.000 $790.000 $690.000 $380.000 $685.000 $1,109.030 $739.150
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 18.000 $880.000 $900.000 $870.000 $943.000 $1,361.970 $964.110
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 149.000 $900.000 $770.000 $350.000 $733.000 $1,195.130 $824.850
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 4.000 $770.000 $775.000 $350.000 $764.000 $1,164.490 $830.210
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 21.000 $900.000 $900.000 $380.000 $853.000 $1,225.780 $964.110
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 15.000 $1,150.000 $1,040.000 $420.000 $975.000 $1,532.220 $1,114.090
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $1,400.000 $1,460.000 $890.000 $1,368.000 $2,083.810 $1,564.010
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 3.000 $1,200.000 $1,080.000 $570.000 $1,038.000 $1,716.090 $1,156.940
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 3.000 $1,500.000 $1,235.000 $570.000 $1,038.000 $1,961.240 $1,322.980
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
EA 1.000 $1,200.000 $1,335.000 $560.000 $1,038.000 $2,145.110 $1,430.100
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 7.000 $1,900.000 $2,290.000 $1,670.000 $1,716.000 $2,696.710 $2,453.130
IN SM RD SN SUP&AM TYS80(2)SB(P)
EA 4.000 $1,650.000 $2,450.000 $1,900.000 $1,876.000 $2,819.280 $2,624.530
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 7.000 $2,900.000 $2,175.000 $570.000 $2,281.000 $4,290.210 $2,329.940
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 3.000 $3,300.000 $2,225.000 $570.000 $2,342.000 $3,799.900 $2,383.500
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 8.000 $5,500.000 $4,090.000 $410.000 $5,533.000 $6,374.030 $4,381.360
REMOVE SM RD SN SUP&AM
EA 154.000 $105.000 $150.000 $170.000 $205.250 $257.420 $107.120
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $110.000 $75.000 $90.000 $50.000 $183.860 $80.340
INSTALL LRSS (STRUCT STEEL)
LB 6,588.000 $10.000 $6.100 $7.250 $6.900 $8.630 $6.530
REMOVE LRSA
EA 11.000 $900.000 $1,485.000 $800.000 $500.000 $625.140 $787.360
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $55,000.000 $42,000.000 $42,000.000 $46,300.000 $57,888.500 $59,725.010
INS OH SN SUP(30 FT CANT)
EA 2.000 $55,000.000 $52,000.000 $52,000.000 $55,600.000 $69,516.220 $69,729.150
INS OH SN SUP(35 FT CANT)
EA 2.000 $60,000.000 $37,000.000 $37,000.000 $40,100.000 $50,136.690 $51,420.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 3.000 $33,000.000 $25,500.000 $25,500.000 $26,300.000 $32,882.670 $36,101.150
INS OH SN SUP(40 FT CANT)
EA 3.000 $66,000.000 $48,000.000 $48,000.000 $50,500.000 $63,139.720 $63,392.440
INS OH SN SUP(70 FT BRDG)
EA 1.000 $82,000.000 $68,000.000 $68,000.000 $70,000.000 $87,520.350 $96,356.080
INS OH SN SUP(85 FT BRDG)
EA 1.000 $100,000.000 $80,000.000 $80,000.000 $83,600.000 $104,524.300 $120,010.140
INS OH SN SUP(90 FT BRDG)
EA 1.000 $110,000.000 $85,000.000 $85,000.000 $89,600.000 $112,026.050 $125,218.290
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 3.000 $2,300.000 $650.000 $650.000 $600.000 $750.180 $7,293.650
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 256.000 $10.000 $45.000 $80.000 $38.000 $44.130 $48.210
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 53.000 $25.000 $45.000 $80.000 $45.000 $53.930 $48.210
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 256.000 $25.000 $45.000 $80.000 $38.000 $44.130 $48.210
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 47.000 $20.000 $45.000 $80.000 $38.000 $47.800 $48.210
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 36.000 $10.000 $45.000 $80.000 $45.000 $57.610 $48.210
INSTL OM ASSM (OM-2Y)(WC)GND
EA 13.000 $60.000 $65.000 $80.000 $52.000 $92.620 $69.630
INSTL OM SM RD SIGN (2-OM-TY1)Y
EA 11.000 $550.000 $110.000 $80.000 $94.000 $147.090 $117.840
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GNDLL
EA 38.000 $5.000 $94.000 $80.000 $76.000 $122.570 $100.700
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 197.000 $5.000 $35.000 $80.000 $13.000 $61.290 $37.490
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 690.000 $0.500 $0.500 $0.300 $0.500 $0.610 $0.510
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 38,270.000 $0.600 $0.500 $0.250 $0.500 $0.610 $0.510
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 40,685.000 $0.500 $0.500 $0.250 $0.500 $0.610 $0.510
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 1,530.000 $5.000 $5.000 $3.800 $5.000 $6.130 $5.050
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,317.000 $5.500 $5.000 $3.800 $5.000 $6.130 $5.050
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 30,526.000 $2.000 $0.900 $0.800 $0.900 $1.100 $0.910
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 46,250.000 $2.000 $0.900 $0.800 $0.900 $1.100 $0.910
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,942.000 $1.500 $1.000 $0.700 $1.000 $1.230 $1.010
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 41.000 $22.000 $1.250 $1.000 $1.250 $1.530 $1.260
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 24,809.000 $1.000 $1.250 $0.850 $1.250 $1.530 $1.260
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 40.000 $60.000 $60.000 $35.000 $60.000 $73.540 $60.610
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 1.000 $400.000 $500.000 $250.000 $500.000 $612.880 $505.050
RE PM TY II (W) 6" (DOT)
LF 1,942.000 $0.650 $0.500 $0.400 $0.500 $0.610 $0.510
RE PM TY II (W) 8" (DOT)
LF 67.000 $0.550 $0.500 $0.400 $0.500 $0.610 $0.510
RE PM TY II (W) 8" (SLD)
LF 24,809.000 $0.500 $0.500 $0.400 $0.500 $0.610 $0.510
RE PM TY II (W) 36" (YLD TRI)
EA 40.000 $25.000 $25.000 $15.000 $25.000 $30.640 $25.250
RE PM TY II (Y) (MED NOSE)
EA 1.000 $200.000 $200.000 $50.000 $200.000 $245.160 $202.020
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 17,974.000 $12.000 $15.000 $14.000 $15.000 $18.390 $15.150
PREFAB PM TY B (W)(12")(SLD)
LF 5,298.000 $18.000 $15.000 $12.500 $15.000 $18.390 $15.150
PREFAB PM TY B (W)(12")(LNDP)
LF 1,529.000 $16.000 $16.000 $12.500 $16.000 $19.610 $16.160
PREFAB PM TY B (W)(24")(SLD)
LF 1,279.000 $45.000 $32.000 $24.000 $32.000 $39.220 $32.320
PREFAB PM TY B (W)(WORD)CONTRAST
EA 31.000 $1,300.000 $7,800.000 $1,300.000 $7,800.000 $9,561.050 $7,878.790
PREFAB PM TY B (W)(ARROW)CONTRAST
EA 47.000 $1,000.000 $6,250.000 $1,100.000 $6,250.000 $7,661.090 $6,313.130
PREFAB PM TY C (W)(6")(BRK)
LF 2,320.000 $13.000 $5.000 $4.000 $5.000 $6.130 $5.050
PREFAB PM TY C (W)(12")(LNDP)
LF 102.000 $8.500 $10.000 $8.000 $10.000 $12.260 $10.100
PREFAB PM TY C (W)(12")(SLD)
LF 300.000 $9.000 $10.000 $8.000 $10.000 $12.260 $10.100
PREFAB PM TY C (W)(24")(SLD)
LF 94.000 $15.000 $20.000 $13.000 $20.000 $24.510 $20.200
PREFAB PM TY C (W)(ARROW)
EA 4.000 $245.000 $300.000 $220.000 $300.000 $367.730 $303.030
PREFAB PM TY C (W)(WORD)
EA 4.000 $290.000 $400.000 $289.000 $400.000 $490.310 $404.040
REFL PAV MRKR TY I-A
EA 789.000 $6.500 $5.250 $4.000 $5.250 $6.440 $5.300
REFL PAV MRKR TY I-C
EA 1,121.000 $5.500 $5.250 $4.000 $5.250 $6.440 $5.300
REFL PAV MRKR TY II-A-A
EA 115.000 $5.500 $6.000 $4.000 $6.000 $7.350 $6.060
REFL PAV MRKR TY II-C-R
EA 3,025.000 $5.000 $5.000 $4.000 $5.000 $6.130 $5.050
ELIM EXT PM & MRKS (4")
LF 46,646.000 $1.000 $0.750 $0.550 $0.750 $0.920 $0.760
PAV SURF PREP FOR MRK (6")
LF 185,324.000 $0.200 $0.250 $0.250 $0.250 $0.310 $0.250
PAV SURF PREP FOR MRK (8")
LF 39,685.000 $0.500 $0.300 $0.250 $0.300 $0.370 $0.300
PAV SURF PREP FOR MRK (10")
LF 18,144.000 $1.000 $0.400 $0.250 $0.400 $0.490 $0.400
PAV SURF PREP FOR MRK (12")
LF 7,229.000 $1.500 $1.000 $0.400 $1.000 $1.230 $1.010
PAV SURF PREP FOR MRK (24")
LF 1,373.000 $1.000 $3.000 $0.600 $3.000 $3.680 $3.030
PAV SURF PREP FOR MRK (ARROW)
EA 51.000 $25.000 $110.000 $10.000 $110.000 $134.830 $111.110
PAV SURF PREP FOR MRK (WORD)
EA 35.000 $100.000 $135.000 $10.000 $135.000 $165.480 $136.360
PAV SURF PREP FOR MRK (MED NOSE)
EA 1.000 $100.000 $500.000 $40.000 $500.000 $612.880 $505.050
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $57,000.000 $16,000.000 $16,000.000 $42,500.000 $53,137.390 $39,061.790
VEH SIG SEC (12")LED(GRN)
EA 24.000 $400.000 $300.000 $300.000 $305.000 $381.340 $413.830
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $400.000 $300.000 $300.000 $305.000 $381.340 $413.830
VEH SIG SEC (12")LED(YEL)
EA 24.000 $400.000 $300.000 $300.000 $305.000 $381.340 $413.830
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $400.000 $300.000 $300.000 $305.000 $381.340 $413.830
VEH SIG SEC (12")LED(RED)
EA 24.000 $400.000 $300.000 $300.000 $305.000 $381.340 $413.830
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $400.000 $300.000 $300.000 $305.000 $381.340 $413.830
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $750.000 $800.000 $800.000 $660.000 $825.190 $1,529.840
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 28.000 $230.000 $250.000 $250.000 $170.000 $212.540 $308.680
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 3,039.000 $4.000 $5.000 $5.000 $2.900 $3.630 $6.650
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,695.000 $8.000 $9.500 $9.500 $6.800 $8.500 $11.530
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $700.000 $1,800.000 $1,500.000 $365.000 $456.360 $1,287.700
INS TRF SIG PL AM(S)2 ARM(40-32')
EA 2.000 $34,000.000 $23,000.000 $23,000.000 $19,300.000 $24,130.630 $27,748.420
INS TRF SIG PL AM(S)2 ARM(44-32')
EA 2.000 $34,500.000 $24,000.000 $24,000.000 $20,300.000 $25,380.920 $28,324.610
PED POLE ASSEMBLY
EA 16.000 $3,000.000 $2,100.000 $2,100.000 $2,500.000 $3,125.730 $6,671.540
REMOVE UNDERGROUND CONDUIT
LF 330.000 $2.000 $15.000 $15.000 $5.000 $6.250 $21.900
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 6,235.000 $8.000 $8.000 $4.500 $5.000 $2.450 $4.700
FULL - WIDTH MOWING
CYC 8.000 $9,000.000 $5,000.000 $8,500.000 $6,500.000 $18,386.650 $7,668.750
LITTER REMOVAL
CYC 8.000 $5,600.000 $4,000.000 $3,500.000 $2,085.330 $9,806.210 $3,000.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 55.000 $2,200.000 $5,000.000 $2,500.000 $2,500.000 $3,727.040 $5,953.800
TREE TRIMMING / BRUSH REMOVAL
MI 4.000 $4,500.000 $6,500.000 $10,450.000 $8,638.070 $1,943.370 $2,750.000
TIP TESTING(DRILL SHAFT)
EA 16.000 $6,000.000 $9,000.000 $4,880.000 $4,872.150 $6,795.910 $5,017.690
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 80,400.000 $6.000 $5.500 $5.500 $1.970 $4.900 $5.720
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 80,400.000 $1.500 $1.150 $1.500 $0.470 $1.290 $2.770
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $22,000.000 $9,000.000 $9,000.000 $17,000.000 $21,254.960 $18,470.630
VIVDS CAM ASSY (INSTALL ONLY)
EA 1.000 $1,100.000 $500.000 $500.000 $485.000 $606.390 $927.530
RVDS (ADVANCE DET)(INSTALL ONLY)
EA 4.000 $4,000.000 $600.000 $600.000 $485.000 $606.390 $927.530
ITS RVSD(DATA COLL ONLY)(INSTL ONLY)
EA 3.000 $13,000.000 $700.000 $700.000 $365.000 $456.360 $4,503.820
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 7.000 $9,000.000 $3,000.000 $3,000.000 $7,500.000 $9,377.190 $13,276.010
ITS POLE (40 FT) (130 MPH) (W/STIFF)
EA 5.000 $21,000.000 $16,000.000 $16,000.000 $13,900.000 $17,379.040 $19,840.830
TEMP SPEED MONITOR SYS
EA 2.000 $22,000.000 $29,798.000 $25,000.000 $20,000.000 $24,515.520 $25,252.530
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 5.000 $24,000.000 $1,500.000 $1,500.000 $500.000 $625.140 $11,641.650
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 2,322.000 $4.000 $6.000 $6.000 $5.400 $6.750 $2.470
FIBER OPTIC FUSION SPLICE
EA 15.000 $85.000 $50.000 $50.000 $165.000 $206.290 $83.380
FO SPLICE ENCLOSURE (TYPE 3)
EA 6.000 $1,600.000 $2,500.000 $2,500.000 $3,300.000 $4,125.960 $3,029.660
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 8.000 $2,300.000 $2,500.000 $2,500.000 $2,500.000 $3,125.730 $2,071.150
FO CBL (96 SMF)
LF 40,763.000 $6.000 $4.500 $4.500 $5.600 $7.000 $4.440
ETHERNET SWITCH (INSTALL ONLY)
EA 7.000 $750.000 $1,500.000 $1,500.000 $300.000 $375.090 $1,723.020
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 3,315.000 $100.000 $87.600 $97.500 $52.000 $110.320 $93.840
MLTPLY PV MK W/WTY (W) (6") (SLD)
LF 90,105.000 $1.000 $1.000 $1.000 $1.000 $1.230 $1.010
MLTPLY PV MK W/WTY (Y) (6") (SLD)
LF 93,460.000 $1.000 $1.000 $1.000 $1.000 $1.230 $1.010
CURB INLET SEDIMENT PROTECTION
LF 2,154.000 $10.000 $15.000 $12.000 $15.000 $24.510 $12.240
1
RC PIPE (CL III)(18 IN)
LF 580.000 $105.000 $0.000 $135.000 $0.000 $0.000 $0.000
1
RC PIPE (CL III)(24 IN)
LF 11,336.000 $130.000 $0.000 $107.000 $0.000 $0.000 $0.000
1
RC PIPE (CL III)(30 IN)
LF 7,152.000 $160.000 $0.000 $115.000 $0.000 $0.000 $0.000
1
RC PIPE (CL III)(36 IN)
LF 7,054.000 $180.000 $0.000 $147.000 $0.000 $0.000 $0.000
1
RC PIPE (CL III)(42 IN)
LF 4,363.000 $270.000 $0.000 $197.000 $0.000 $0.000 $0.000
1
RC PIPE (CL III)(48 IN)
LF 2,322.000 $300.000 $0.000 $243.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 580.000 $105.000 $52.000 $0.000 $52.000 $52.520 $70.000
1A
THERMOPLASTIC PIPE (PP) (24")
LF 11,336.000 $130.000 $64.000 $0.000 $64.000 $64.640 $80.000
1A
THERMOPLASTIC PIPE (PP) (30")
LF 7,152.000 $160.000 $85.000 $0.000 $85.000 $85.850 $103.000
1A
THERMOPLASTIC PIPE (PP) (36")
LF 7,054.000 $180.000 $100.000 $0.000 $100.000 $101.000 $126.000
1A
THERMOPLASTIC PIPE (PP) (42")
LF 4,363.000 $270.000 $116.000 $0.000 $116.000 $117.160 $155.000
1A
THERMOPLASTIC PIPE (PP) (48")
LF 2,322.000 $300.000 $158.000 $0.000 $158.000 $159.580 $184.000
Totals: $302,545,426.950 $221,640,502.220 $242,252,262.000 $269,724,854.386 $276,846,374.807 $307,007,227.068
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
MATERIAL FURNISHED BY THE STATE (NON-PART) $100,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $5,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $200,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $500,000.00
Total: $1,005,000.00