Show Job Controls
Bid Cobra

LUBBOCK VA (0905-06-111)

Items: 40

County: LUBBOCK
Length: N/A
Highway: VA
District: LUBBOCK
Control Number: 0905-06-111
DBE Goal: N/A
Project: STP 2019(104)
Guaranty: N/A
Time: 173 WORKING DAYS
Engineer's Estimate: $2,808,636.70
Date: 10/03/2018 (7 years ago)
Contract Number: N/A
Type: MEDIANS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,808,636.70
$2,576,443.65
Over/Under Est: -8.27% -$232,193.05
Over/Under Est: 6.61% $185,537.45
Amt Left: 16.21% $417,730.50
$3,530,747.20
Over/Under Est: 25.71% $722,110.50
Amt Left: 37.04% $954,303.55
Delta: -17.92% -$536,573.05

Bid Items & Bid Tabulations

40 Total 0 of 40
LUBBOCK  |  VA  |  LUBBOCK  |  0905-06-111  |  10/03/2018  |  $2,808,636.70  |  STP 2019(104)  |  MEDIANS  |  173 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN BUTLER CONSTRUCTION, INC.
O. TREVINO CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOVING CONC (SIDEWALKS)
SY 22.000 $20.000 $35.030 $75.000 $530.000
REMOVING CONC (CURB)
LF 455.000 $10.000 $9.490 $10.000 $15.000
REMOVING STAB BASE AND ASPH PAV (5")
SY 19,979.000 $1.500 $6.630 $12.000 $11.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 580.000 $200.000 $159.660 $170.000 $180.000
MOBILIZATION
LS 1.000 $250,331.000 $254,864.850 $270,000.000 $325,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $5,266.330 $9,500.000 $13,500.000
SANDBAGS FOR EROSION CONTROL
EA 300.000 $4.000 $5.850 $5.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,770.000 $2.500 $2.840 $2.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,770.000 $0.750 $1.180 $1.100 $1.000
COLORED TEXTURED CONC (5")
SY 19,979.000 $80.000 $65.270 $77.500 $95.000
CONC CURB (TY II)
LF 455.000 $25.000 $76.080 $40.000 $45.000
REMOVE RD IL ASM (SHOE-BASE)
EA 24.000 $400.000 $591.330 $700.000 $500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 7.000 $600.000 $591.330 $700.000 $500.000
REPLACE LUMINAIRE W/LED (400W EQ)
EA 40.000 $1,000.000 $413.930 $450.000 $350.000
IN RD IL (TY ST) 50T-10 (400W EQ) LED
EA 58.000 $3,500.000 $3,547.970 $3,700.000 $3,000.000
CONDT (PVC) (SCH 80) (2")
LF 10,671.000 $8.000 $5.030 $5.250 $5.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,875.000 $20.000 $15.370 $16.000 $13.000
ELEC CONDR (NO.4) BARE
LF 12,546.000 $1.250 $1.360 $1.400 $2.000
ELEC CONDR (NO.4) INSULATED
LF 25,092.000 $1.350 $1.420 $1.500 $2.000
GROUND BOX TY A (122311)W/APRON
EA 60.000 $950.000 $591.330 $620.000 $500.000
REMOVE GROUND BOX
EA 31.000 $250.000 $325.230 $340.000 $275.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $500.000 $354.800 $370.000 $300.000
ELC SRV TY A 240/480 100(SS)SS(E)SP(O)
EA 2.000 $7,000.000 $6,504.610 $6,800.000 $5,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $780.560 $750.000 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 6.000 $700.000 $804.210 $780.000 $518.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $700.000 $1,159.000 $1,125.000 $876.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $300.000 $650.460 $630.000 $496.000
REMOVE SM RD SN SUP&AM
EA 14.000 $100.000 $147.830 $140.000 $66.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 2.000 $60.000 $118.270 $115.000 $86.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)SRF
EA 2.000 $80.000 $130.090 $125.000 $165.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 5.000 $70.000 $118.270 $115.000 $77.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 3.000 $90.000 $130.090 $125.000 $118.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 4.000 $300.000 $413.930 $400.000 $159.000
PREFAB PAV MRK TY C (Y) (MED NOSE)
EA 42.000 $200.000 $739.160 $700.000 $625.000
REFL PAV MRKR TY II-A-A
EA 510.000 $4.000 $4.730 $4.500 $4.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 42.000 $4.000 $118.270 $115.000 $100.000
REMOVAL OF TRAFFIC SIGNAL POLE FND
LF 4.000 $250.000 $118.270 $120.000 $100.000
REPLACE CONDUCTOR
LF 17,378.000 $1.500 $2.840 $3.000 $2.400
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $7,687.270 $20,000.000 $15,000.000
TMA (STATIONARY)
DAY 692.000 $200.000 $172.190 $125.000 $360.000
Totals: $2,808,636.700 $2,576,443.650 $2,994,174.150 $3,530,747.200