Show Job Controls
Bid Cobra

LUBBOCK SL 289 (0783-02-096)

Items: 30

County: LUBBOCK
Length: N/A
Highway: SL 289
District: LUBBOCK
Control Number: 0783-02-096
DBE Goal: N/A
Project: C 783-2-96
Guaranty: N/A
Time: 47 WORKING DAYS
Engineer's Estimate: $439,840.00
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: BRIDGE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$439,840.00
$491,471.20
Over/Under Est: 11.74% $51,631.20
Over/Under Est: 30.63% $134,710.00
Amt Left: 16.9% $83,078.80

Bid Items & Bid Tabulations

30 Total 0 of 30
LUBBOCK  |  SL 289  |  LUBBOCK  |  0783-02-096  |  07/12/2017  |  $439,840.00  |  C 783-2-96  |  BRIDGE REPAIR  |  47 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCR CIVIL CONSTRUCTION, LLC
FNF CONSTRUCTION, INC.
REINF CONC SLAB (HPC)
SF 1,030.000 $50.000 $80.000 $81.000
BRIDGE SIDEWALK (HPC)
SF 410.000 $60.000 $80.000 $40.000
PRESTR CONC BEAM (TY C)
LF 78.000 $500.000 $370.000 $720.000
RAIL (TY C221)(HPC)
LF 84.000 $100.000 $400.000 $500.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $10,000.000 $24,000.000 $35,000.000
REMOVE STR (DAMAGED BEAM)
EA 1.000 $10,000.000 $15,000.000 $30,000.000
REMOVE STR (RAIL)
LF 84.000 $50.000 $120.000 $100.000
MOBILIZATION
LS 1.000 $39,000.000 $49,100.000 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $15,000.000 $11,500.000 $10,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 26.000 $800.000 $1,200.000 $1,200.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $3,000.000 $3,000.000 $3,200.000
REMOVE SM RD SN SUP&AM
EA 15.000 $200.000 $200.000 $500.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 180.000 $5.000 $5.600 $4.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,000.000 $2.000 $0.950 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 660.000 $2.000 $1.000 $1.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,000.000 $2.000 $1.950 $1.600
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 520.000 $10.000 $27.000 $22.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $300.000 $450.000 $650.000
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 660.000 $3.000 $4.500 $5.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 70.000 $10.000 $12.300 $21.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 14.000 $100.000 $28.000 $35.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,200.000 $1.000 $0.700 $2.000
ELIM EXT PAV MRK & MRKS (6")
LF 2,000.000 $2.000 $1.350 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 700.000 $3.000 $4.050 $6.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $50.000 $16.800 $300.000
PAV SURF PREP FOR MRK (4")
LF 2,640.000 $1.000 $0.450 $2.000
PAV SURF PREP FOR MRK (24")
LF 700.000 $3.000 $2.700 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $50.000 $16.800 $450.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $5,000.000 $4,000.000
SOLAR POWERED LED WARNING SIGN
EA 22.000 $2,000.000 $3,140.000 $4,500.000
Totals: $439,840.000 $491,471.200 $574,550.000