LOVING SH 302 (0479-03-016)

Items: 108

County: LOVING
Length: N/A
Highway: SH 302
District: ODESSA
Control Number: 0479-03-016
DBE Goal: N/A
Project: F 2022(496)
Guaranty: N/A
Time: 510 WORKING DAYS
Engineer's Estimate: $34,992,157.76
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: ROADWAY WIDENING TO A SUPER 2
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$34,992,157.76
$36,670,137.75
Over/Under Est: 4.8% $1,677,979.99
Over/Under Est: 12.55% $4,391,226.07
Amt Left: 7.4% $2,713,246.08
$43,557,285.01
Over/Under Est: 24.48% $8,565,127.25
Amt Left: 18.78% $6,887,147.26
Delta: -10.60% -$4,173,901.18
Over/Under Est: 53.21% $18,617,962.97
Amt Left: 46.2% $16,939,982.98
Delta: -23.08% -$10,052,835.72
Subcontractor Percentage Amount
REECE CONSTRUCTION CO., INC. 6.35% $2,328,553.75
WILLIS ELECTRIC CO., LP 1.39% $509,714.91
DUSTROL, INC. 0.74% $271,359.02
DOUBLE A CONTRACTING, L.P. 0.74% $271,359.02
4-WAY HAULERS, LLC 0.26% $95,342.36
DK CONTRACTING, LLC 0.20% $73,340.28
MAKIN' IT MOVE TRANSPORT,LLC 0.18% $66,006.25
AGAVE TRANSPORTATION SERVICES, INC. 0.12% $44,004.17
FUSION COMMUNICATIONS, LLC 0.11% $40,337.15
JVH4 SERVICES, LLC 0.09% $33,003.12
HARD AS A ROCK CONCRETE CONSTRUCTION LLC 0.07% $25,669.10
PINNACLE GRINDING AND GROOVING LLC 0.04% $14,668.06
WEST TEXAS ROCK RESOURCES, LLC 0.04% $14,668.06
JOAT ONE ENTERPRISES LLC 0.02% $7,334.03
Total: 10.35% $3,795,359.28

Bid Items & Bid Tabulations

108 Total 0 of 108
LOVING  |  SH 302  |  ODESSA  |  0479-03-016  |  05/05/2022  |  $34,992,157.76  |  F 2022(496)  |  ROADWAY WIDENING TO A SUPER 2  |  510 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
REMOVING STAB BASE & ASPH PAV (12")
SY 61,378.000 $7.500 $5.250 $3.170 $4.790 $6.390
REMOVING STAB BASE AND ASPH PAV (5")
SY 143,222.000 $5.000 $2.350 $1.620 $2.870 $2.680
EXCAVATION (ROADWAY)
CY 72,907.000 $9.000 $3.900 $9.500 $9.790 $11.280
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 37,394.000 $10.000 $8.550 $13.000 $9.560 $12.120
PROOF ROLLING
HR 19.000 $135.000 $110.000 $155.000 $138.970 $221.890
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 267,719.000 $7.780 $7.950 $8.880 $10.340 $10.220
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 105,247.000 $1.160 $1.500 $0.500 $1.190 $0.740
PRIME COAT (MC-30)
GAL 70,887.000 $4.500 $7.000 $5.650 $5.420 $6.310
FOG SEAL (CSS-1H)
GAL 74,105.000 $3.500 $2.900 $4.570 $4.780 $5.020
ASPH (AC-20-5TR)
GAL 134,680.000 $3.250 $4.250 $4.960 $5.130 $5.750
AGGR(TY-PB GR-4 SAC-A)
CY 3,081.000 $100.000 $100.000 $102.000 $144.600 $162.890
STRUCT EXCAV
CY 1,245.000 $10.000 $65.000 $40.270 $41.420 $12.480
CEM STABIL BKFL
CY 633.000 $185.000 $400.000 $360.300 $370.590 $187.150
CUT & RESTORING PAV
SY 277.000 $120.000 $340.000 $65.000 $136.490 $99.820
TRENCH EXCAVATION PROTECTION
LF 788.000 $16.000 $75.000 $69.080 $71.050 $14.970
TEMPORARY SPL SHORING
SF 8,372.000 $20.000 $8.000 $10.000 $23.330 $19.610
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 188.000 $250.000 $350.000 $341.250 $351.000 $373.440
RIPRAP (CONC)(5 IN)
CY 22.000 $550.000 $1,110.000 $861.110 $885.710 $842.190
RIPRAP (CONC)(FLUME)
CY 2.000 $500.000 $1,415.000 $1,120.380 $1,152.390 $873.380
RIPRAP (CONC) (CHANNEL) (4IN)
CY 98.000 $575.000 $1,185.000 $753.360 $774.890 $842.190
CONC BOX CULV (3 FT X 2 FT)
LF 74.000 $350.000 $435.000 $386.900 $397.960 $449.170
CONC BOX CULV (5 FT X 2 FT)
LF 1,334.000 $400.000 $585.000 $521.090 $535.980 $673.750
RC PIPE (ARCH)(CL IV)(DES 3)
LF 1,400.000 $200.000 $286.000 $297.330 $305.820 $430.450
INLET (COMPL)(ARMOR CURB SLOT)
EA 6.000 $6,000.000 $9,500.000 $7,915.780 $8,640.000 $9,981.500
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $11,500.000 $28,000.000 $24,753.040 $25,460.270 $25,577.600
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $7,900.000 $7,515.000 $7,040.520 $6,930.850 $7,486.130
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $7,500.000 $7,545.000 $6,767.670 $6,961.030 $7,985.200
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (P)
EA 2.000 $8,500.000 $11,085.000 $9,944.490 $10,228.620 $17,467.630
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 24.000 $6,000.000 $6,790.000 $6,090.050 $6,264.050 $8,109.970
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $8,700.000 $8,570.000 $7,686.190 $7,905.800 $9,357.660
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $9,000.000 $7,555.000 $6,774.380 $6,967.930 $11,229.190
SET (TY II) (12 IN) (RCP) (4: 1) (P)
EA 20.000 $1,200.000 $860.000 $769.100 $791.080 $1,247.690
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 62.000 $1,250.000 $1,410.000 $1,266.540 $1,302.730 $1,372.460
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 42.000 $2,000.000 $1,660.000 $1,486.650 $1,529.130 $1,746.760
SET (TY II) (DES 3) (RCP) (3: 1) (C)
EA 5.000 $2,000.000 $2,005.000 $1,799.670 $1,851.090 $2,495.380
SET (TY II) (DES 3) (RCP) (4: 1) (C)
EA 31.000 $1,750.000 $1,980.000 $1,774.700 $1,825.410 $2,620.140
REMOV STR (HEADWALL)
EA 18.000 $1,500.000 $250.000 $72.830 $74.910 $935.770
REMOV STR (PIPE)
EA 23.000 $700.000 $520.000 $413.550 $3,160.270 $623.840
REMOV STR (DRIVEWAY CULVERT)
EA 9.000 $250.000 $500.000 $372.260 $9,715.110 $623.840
MOBILIZATION
LS 1.000 $3,291,067.440 $3,676,000.000 $2,500,000.000 $1,162,621.470 $6,012,964.730
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $20,000.000 $30,000.000 $9,700.000 $15,190.800 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 389.000 $30.000 $48.000 $28.000 $59.400 $65.490
ROCK FILTER DAMS (REMOVE)
LF 389.000 $15.000 $15.000 $13.000 $28.640 $25.190
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $25.000 $37.000 $15.000 $19.660 $45.960
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $12.000 $7.000 $12.000 $25.310 $8.840
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 813.000 $7.500 $11.000 $12.000 $7.750 $9.190
BIODEG EROSN CONT LOGS (REMOVE)
LF 813.000 $2.000 $2.650 $4.000 $4.650 $2.300
CONSTRUCTING DETOURS
SY 18,435.000 $45.000 $70.000 $50.000 $64.510 $74.470
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 16,110.000 $50.000 $42.500 $26.250 $40.870 $85.490
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 58,770.000 $9.000 $5.000 $15.750 $2.320 $5.550
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 16,110.000 $8.000 $4.000 $26.250 $8.960 $8.700
CONC CURB & GUTTER (TY II)
LF 1,733.000 $22.000 $34.000 $36.750 $70.200 $45.960
DRIVEWAYS (CONC)
SY 3,362.000 $100.000 $130.000 $126.000 $166.950 $165.510
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 4,902.000 $50.000 $92.000 $67.000 $93.510 $110.660
CONC SIDEWALKS (4")
SY 329.000 $70.000 $96.500 $81.900 $162.000 $80.430
CURB RAMPS (TY 2)
EA 4.000 $2,000.000 $3,500.000 $1,890.000 $2,700.000 $2,872.590
CURB RAMPS (TY 10)
EA 10.000 $1,800.000 $2,725.000 $2,310.000 $2,430.000 $4,423.780
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 28.000 $150.000 $1,785.000 $1,312.500 $135.000 $402.160
RUMBLE STRIPS (SHOULDER)
LF 99,134.000 $0.200 $0.100 $0.140 $0.100 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 31,977.000 $0.200 $0.150 $0.210 $0.100 $0.100
CRASH CUSH ATTEN (MOVE & RESET)
EA 56.000 $1,200.000 $400.000 $2,625.000 $809.510 $1,723.550
CRASH CUSH ATTEN (REMOVE)
EA 16.000 $850.000 $350.000 $1,575.000 $739.910 $1,378.840
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 16.000 $8,500.000 $7,000.000 $8,137.500 $11,124.520 $12,064.860
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 6.000 $4,000.000 $5,800.000 $5,880.000 $6,048.000 $6,434.590
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 14.000 $4,000.000 $6,750.000 $6,825.000 $7,020.000 $7,468.720
CONDT (PVC) (SCH 40) (2")
LF 9,758.000 $10.000 $8.250 $8.400 $8.640 $9.190
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,958.000 $25.000 $22.750 $23.100 $23.760 $25.280
ELEC CONDR (NO.8) INSULATED
LF 12,870.000 $1.650 $2.150 $2.100 $2.160 $2.300
ELEC CONDR (NO.6) BARE
LF 6,435.000 $1.500 $2.150 $2.100 $2.160 $2.300
GROUND BOX TY A (122311)W/APRON
EA 26.000 $1,100.000 $1,700.000 $1,680.000 $1,728.000 $1,838.460
ELC SRV TY A 240/480 060(NS)AL(E)SP(O)
EA 1.000 $6,600.000 $10,000.000 $9,660.000 $9,936.000 $10,571.120
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 17.000 $30.000 $38.000 $35.700 $36.720 $39.070
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 54.000 $600.000 $950.000 $931.350 $957.960 $1,019.190
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $800.000 $1,200.000 $1,185.450 $1,219.320 $1,297.260
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $1,200.000 $1,300.000 $1,286.250 $1,323.000 $1,407.570
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 11.000 $450.000 $825.000 $802.200 $825.120 $877.860
REMOVE SM RD SN SUP&AM
EA 35.000 $100.000 $255.000 $125.000 $116.610 $109.640
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 302,950.000 $0.150 $0.150 $0.130 $0.130 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 108,016.000 $0.200 $0.150 $0.150 $0.150 $0.160
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,111.000 $2.000 $0.800 $1.500 $3.190 $2.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,256.000 $0.950 $0.850 $1.500 $4.160 $2.300
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,097.000 $1.000 $1.050 $1.050 $1.080 $1.150
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,014.000 $1.000 $1.250 $1.260 $1.300 $1.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,733.000 $1.000 $1.000 $1.000 $1.030 $1.090
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 9,475.000 $0.420 $0.500 $0.480 $0.500 $0.530
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 101,969.000 $0.420 $0.450 $0.440 $0.450 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 327.000 $0.420 $2.050 $2.100 $2.160 $2.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 130,363.000 $0.420 $0.450 $0.440 $0.450 $0.480
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 530.000 $14.000 $13.200 $13.650 $14.040 $14.940
PREFAB PAV MRK TY C (W) (ARROW)
EA 26.000 $230.000 $225.000 $231.000 $237.600 $252.790
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $500.000 $410.000 $420.000 $432.000 $459.610
PREFAB PAV MRK TY C (W) (WORD)
EA 22.000 $300.000 $310.000 $315.000 $324.000 $344.710
REFL PAV MRKR TY I-C
EA 713.000 $3.250 $4.100 $4.200 $4.320 $4.600
REFL PAV MRKR TY II-A-A
EA 3,835.000 $3.000 $3.300 $3.410 $3.510 $3.730
ELIM EXT PAV MRK & MRKS (4")
LF 105,541.000 $0.350 $0.750 $0.680 $0.700 $0.750
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $3,500.000 $10,500.000 $9,450.000 $9,720.000 $10,341.310
SP MIXES SP-B SAC-B PG70-22
TON 190,951.000 $80.000 $83.000 $99.500 $120.000 $130.850
TACK COAT
GAL 70,887.000 $3.500 $6.200 $4.150 $6.530 $3.460
STONE-MTRX-ASPH SMAR-F SAC-A
TON 29,344.000 $125.000 $122.000 $146.000 $156.000 $193.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $18,900.000 $28,362.830 $24,953.760
TMA (STATIONARY)
DAY 308.000 $150.000 $170.000 $75.000 $395.560 $623.870
TMA (MOBILE OPERATION)
HR 80.000 $80.000 $465.000 $89.250 $507.900 $109.550
1
RC PIPE (CL III)(12 IN)
LF 883.000 $80.000 $0.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE(12 IN)(PP)(TYPE III)
LF 883.000 $80.000 $30.000 $30.560 $31.430 $56.150
2
RC PIPE (CL III)(18 IN)
LF 2,796.000 $90.000 $0.000 $0.000 $0.000 $0.000
2A
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 2,796.000 $90.000 $58.000 $47.700 $48.850 $68.620
3
RC PIPE (CL III)(24 IN)
LF 2,107.000 $100.000 $0.000 $0.000 $0.000 $0.000
3A
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 2,107.000 $100.000 $60.000 $62.190 $63.970 $87.340
Totals: $35,525,137.760 $36,670,137.750 $39,383,383.830 $43,557,285.010 $53,610,120.730