PREPARING ROW
|
STA
|
219.000
|
$850.000
|
$794.910
|
$600.000
|
$1,671.000
|
$1,000.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
32.000
|
$20.000
|
$16.650
|
$93.500
|
$20.000
|
$92.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
36,938.400
|
$11.000
|
$8.940
|
$12.000
|
$25.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
22,570.050
|
$11.000
|
$8.940
|
$4.600
|
$23.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
80,087.000
|
$1.250
|
$1.210
|
$1.000
|
$1.700
|
$1.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
80,087.000
|
$0.150
|
$0.140
|
$0.190
|
$0.190
|
$0.300
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
40,043.500
|
$0.150
|
$0.100
|
$0.250
|
$0.130
|
$0.300
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
40,043.500
|
$0.150
|
$0.110
|
$0.250
|
$0.130
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,347.960
|
$22.000
|
$23.310
|
$10.000
|
$15.000
|
$36.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
80,087.000
|
$1.350
|
$0.970
|
$0.670
|
$0.810
|
$1.300
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
16,818.000
|
$52.000
|
$62.610
|
$51.500
|
$53.000
|
$91.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
11,740.000
|
$4.750
|
$4.060
|
$3.850
|
$4.000
|
$5.000
|
|
|
ASPH (TIER I)
|
GAL
|
50,899.000
|
$3.250
|
$3.950
|
$3.300
|
$3.350
|
$4.450
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
1,109.000
|
$95.000
|
$99.580
|
$113.000
|
$120.000
|
$158.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
9,250.000
|
$32.000
|
$37.260
|
$34.600
|
$37.300
|
$50.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 1")
|
SY
|
1,423.000
|
$1.850
|
$3.610
|
$5.400
|
$2.750
|
$8.200
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
5,187.000
|
$2.750
|
$2.560
|
$5.350
|
$2.750
|
$4.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
|
SY
|
1,213.000
|
$2.500
|
$3.610
|
$6.100
|
$3.750
|
$12.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$250.000
|
$262.510
|
$368.450
|
$268.000
|
$308.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
155.000
|
$12.000
|
$21.000
|
$15.790
|
$21.500
|
$25.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,547.000
|
$25.000
|
$25.000
|
$78.950
|
$85.000
|
$116.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
45.000
|
$285.000
|
$210.010
|
$405.290
|
$215.000
|
$246.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,244.000
|
$450.000
|
$435.770
|
$526.350
|
$446.000
|
$510.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
164.400
|
$450.000
|
$451.520
|
$578.980
|
$460.000
|
$530.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
359.000
|
$150.000
|
$125.000
|
$263.180
|
$173.000
|
$420.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
258.860
|
$490.000
|
$593.280
|
$631.620
|
$607.000
|
$627.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(VAR. DEPTH)
|
CY
|
40.000
|
$250.000
|
$150.000
|
$210.540
|
$173.000
|
$300.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
300.000
|
$30.000
|
$28.000
|
$42.110
|
$30.000
|
$35.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
677.000
|
$75.000
|
$76.610
|
$77.380
|
$79.000
|
$690.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
32.000
|
$450.000
|
$493.530
|
$789.530
|
$505.000
|
$570.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
64.000
|
$450.000
|
$488.280
|
$526.350
|
$500.000
|
$572.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
114.000
|
$475.000
|
$451.520
|
$578.990
|
$460.000
|
$530.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$500.000
|
$803.290
|
$615.830
|
$820.000
|
$940.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
33.000
|
$650.000
|
$577.530
|
$657.940
|
$590.000
|
$680.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
60.000
|
$675.000
|
$505.080
|
$736.890
|
$517.000
|
$590.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
22.000
|
$800.000
|
$933.500
|
$842.160
|
$955.000
|
$1,100.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
36.000
|
$1,200.000
|
$761.290
|
$894.800
|
$799.000
|
$590.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
80.000
|
$75.000
|
$70.350
|
$152.640
|
$72.000
|
$83.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
87.000
|
$100.000
|
$93.450
|
$231.590
|
$95.000
|
$110.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
14.000
|
$140.000
|
$149.110
|
$300.020
|
$152.000
|
$175.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,500.000
|
$6,037.820
|
$5,263.500
|
$6,180.000
|
$7,100.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,250.000
|
$9,713.020
|
$7,368.900
|
$9,950.000
|
$1,140.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$5,650.000
|
$6,405.340
|
$6,316.200
|
$6,560.000
|
$7,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,000.000
|
$8,610.460
|
$7,895.250
|
$8,115.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,000.000
|
$11,445.610
|
$8,947.950
|
$11,720.000
|
$13,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$7,000.000
|
$9,187.990
|
$7,895.250
|
$9,400.000
|
$11,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$6,650.000
|
$9,135.490
|
$6,842.550
|
$9,350.000
|
$10,700.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$8,500.000
|
$12,075.640
|
$10,000.650
|
$12,365.000
|
$14,200.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$12,000.000
|
$17,535.930
|
$11,053.350
|
$17,950.000
|
$20,600.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
1.000
|
$15,000.000
|
$14,490.770
|
$13,158.750
|
$14,840.000
|
$17,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$38,000.000
|
$47,357.520
|
$36,844.500
|
$48,500.000
|
$56,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$12,000.000
|
$12,180.650
|
$13,158.750
|
$12,470.000
|
$14,500.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$18,000.000
|
$19,426.030
|
$21,054.000
|
$19,890.000
|
$22,800.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
5.000
|
$20,000.000
|
$19,636.050
|
$26,317.500
|
$20,100.000
|
$23,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
6.000
|
$22,500.000
|
$24,676.310
|
$29,475.600
|
$25,270.000
|
$29,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$875.000
|
$1,837.600
|
$1,052.700
|
$1,880.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$2,205.120
|
$1,263.240
|
$2,550.000
|
$2,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$2,362.630
|
$1,579.050
|
$2,420.000
|
$2,800.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$1,000.000
|
$3,675.200
|
$2,105.400
|
$3,760.000
|
$4,300.000
|
|
|
REMOV STR (SET)
|
EA
|
14.000
|
$450.000
|
$157.510
|
$789.530
|
$160.000
|
$185.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
22.000
|
$1,500.000
|
$315.020
|
$1,579.050
|
$320.000
|
$370.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
24.000
|
$1,500.000
|
$787.540
|
$1,579.050
|
$810.000
|
$920.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
72.000
|
$5.000
|
$10.000
|
$10.740
|
$11.000
|
$18.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$560,000.000
|
$675,573.060
|
$1,038,970.000
|
$874,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$10,000.000
|
$3,221.160
|
$4,070.000
|
$5,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
740.000
|
$30.000
|
$30.930
|
$31.800
|
$30.110
|
$48.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
740.000
|
$10.000
|
$13.370
|
$13.750
|
$8.600
|
$43.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$30.000
|
$22.430
|
$23.060
|
$15.050
|
$36.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$12.000
|
$7.720
|
$7.940
|
$2.000
|
$31.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
41,042.000
|
$2.500
|
$2.250
|
$2.320
|
$2.420
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
41,042.000
|
$0.750
|
$0.500
|
$0.520
|
$0.700
|
$1.500
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
160.000
|
$24.000
|
$100.000
|
$106.320
|
$38.000
|
$62.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$5.000
|
$20.000
|
$33.600
|
$28.000
|
$62.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
160.000
|
$3.000
|
$80.000
|
$54.380
|
$25.000
|
$62.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,494.000
|
$45.000
|
$35.040
|
$27.650
|
$24.000
|
$72.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
659.000
|
$22.000
|
$26.280
|
$32.800
|
$23.250
|
$41.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,125.000
|
$22.000
|
$22.000
|
$25.130
|
$25.700
|
$42.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,700.000
|
$2,200.000
|
$3,123.360
|
$2,410.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,100.000
|
$1,150.000
|
$1,347.460
|
$1,375.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,494.000
|
$1.500
|
$2.000
|
$3.210
|
$3.280
|
$3.600
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
30.000
|
$250.000
|
$200.000
|
$236.860
|
$240.000
|
$300.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
24.000
|
$2,500.000
|
$2,650.000
|
$2,999.140
|
$3,060.000
|
$4,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
140.000
|
$15.000
|
$15.000
|
$24.320
|
$29.000
|
$18.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,200.000
|
$500.000
|
$1,921.180
|
$1,990.000
|
$600.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
9.000
|
$200.000
|
$200.000
|
$308.440
|
$195.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$475.000
|
$490.000
|
$605.300
|
$604.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$575.000
|
$630.000
|
$696.890
|
$783.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$800.000
|
$930.000
|
$1,023.220
|
$1,268.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$150.000
|
$20.000
|
$97.900
|
$90.000
|
$180.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
20.000
|
$45.000
|
$85.000
|
$82.110
|
$72.800
|
$63.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
80.000
|
$15.000
|
$23.000
|
$31.580
|
$24.200
|
$34.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
43,543.000
|
$0.250
|
$0.290
|
$0.310
|
$0.310
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
87,086.000
|
$0.600
|
$0.440
|
$0.460
|
$0.470
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,589.000
|
$1.000
|
$1.580
|
$0.890
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,856.000
|
$1.000
|
$1.580
|
$0.890
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
574.000
|
$0.850
|
$0.750
|
$0.790
|
$0.810
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,100.000
|
$0.850
|
$0.740
|
$0.780
|
$0.800
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
13.000
|
$6.000
|
$10.450
|
$11.000
|
$11.240
|
$24.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
25.000
|
$115.000
|
$195.000
|
$205.280
|
$210.000
|
$155.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$135.000
|
$135.000
|
$142.110
|
$145.000
|
$180.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,386.000
|
$5.000
|
$6.000
|
$6.320
|
$6.450
|
$6.800
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
2,610.000
|
$0.150
|
$0.200
|
$0.210
|
$0.220
|
$0.300
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
43,962.000
|
$0.150
|
$0.100
|
$0.110
|
$0.110
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
49,094.000
|
$0.150
|
$0.100
|
$0.110
|
$0.110
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,610.000
|
$0.350
|
$0.340
|
$0.360
|
$0.370
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,640.000
|
$0.350
|
$0.340
|
$0.360
|
$0.370
|
$0.600
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
43,962.000
|
$0.600
|
$0.600
|
$0.630
|
$0.650
|
$0.720
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
49,094.000
|
$0.600
|
$0.600
|
$0.630
|
$0.650
|
$0.720
|
|
REFL PAV MRKR TY I-C
|
EA
|
206.000
|
$4.150
|
$3.500
|
$3.680
|
$3.750
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,480.000
|
$4.150
|
$2.500
|
$2.630
|
$2.700
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
25.000
|
$14.000
|
$1.000
|
$1.050
|
$1.050
|
$24.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$20.000
|
$1.000
|
$1.050
|
$1.050
|
$24.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
16.000
|
$125.000
|
$105.010
|
$194.750
|
$108.000
|
$123.000
|
|
|
TREE PROTECTION
|
EA
|
10.000
|
$275.000
|
$421.660
|
$414.700
|
$375.000
|
$415.000
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
14,005.050
|
$80.000
|
$94.890
|
$85.550
|
$88.000
|
$109.000
|
|
|
D-GR HMA TY-C PG76-22 (LEVEL-UP)
|
TON
|
553.310
|
$105.000
|
$102.780
|
$136.000
|
$122.000
|
$152.000
|
|
|
TACK COAT
|
GAL
|
5,889.210
|
$3.000
|
$3.380
|
$5.450
|
$2.700
|
$4.750
|
|
|
MOVE CATTLE GUARD
|
EA
|
1.000
|
$2,500.000
|
$2,500.000
|
$8,509.680
|
$4,300.000
|
$6,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,500.000
|
$7,500.000
|
$2,700.000
|
$13,550.000
|
$13,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2.000
|
$10,000.000
|
$300.000
|
$250.000
|
$350.000
|
$600.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$50.000
|
$100.000
|
$185.000
|
$110.000
|
$100.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
LS
|
1.000
|
$70,000.000
|
$5,000.000
|
$1,000.000
|
$3,300.000
|
$18,000.000
|
|
Totals: |
$7,172,732.650
|
$7,398,988.980
|
$7,834,774.657
|
$8,709,311.247
|
$11,507,585.668
|