Show Job Controls
Bid Cobra

LLANO SH 29 (0150-04-046)

Items: 122

County: LLANO
Length: N/A
Highway: SH 29
District: AUSTIN
Control Number: 0150-04-046
DBE Goal: N/A
Project: C 150-4-46
Guaranty: N/A
Time: 369 WORKING DAYS
Engineer's Estimate: $7,172,732.65
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$7,172,732.65
$7,398,988.93
Over/Under Est: 3.15% $226,256.28
Over/Under Est: 9.23% $662,041.98
Amt Left: 5.89% $435,785.70
Over/Under Est: 21.42% $1,536,578.58
Amt Left: 17.71% $1,310,322.30
Delta: -11.16% -$874,536.60
Over/Under Est: 60.44% $4,334,853.01
Amt Left: 55.53% $4,108,596.73
Delta: -32.13% -$2,798,274.43
Subcontractor Percentage Amount
MPB, INC. 21.64% $1,759,115.06
DIIBS SPECIALISTS, LLC 3.24% $263,379.52
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 3.01% $244,682.83
D. I. J. CONSTRUCTION, INC. 1.80% $146,321.96
EGGEMEYER LAND CLEARING, LLC 0.71% $57,715.88
LONE STAR EROSION CONTROL 0.51% $41,457.89
INTERSTATE BARRICADES & MARKINGS, INC. 0.32% $26,012.79
STATEWIDE SAFETY SYSTEMS 0.28% $22,761.19
Total: 31.51% $2,561,447.12

Bid Items & Bid Tabulations

122 Total 0 of 122
LLANO  |  SH 29  |  AUSTIN  |  0150-04-046  |  08/04/2021  |  $7,172,732.65  |  C 150-4-46  |  HWY IMPRV  |  369 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
AARON CONCRETE CONTRACTORS, L.P.
PREPARING ROW
STA 219.000 $850.000 $794.910 $600.000 $1,671.000 $1,000.000
REMOVING CONC (MEDIANS)
SY 32.000 $20.000 $16.650 $93.500 $20.000 $92.000
EXCAVATION (ROADWAY)
CY 36,938.400 $11.000 $8.940 $12.000 $25.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 22,570.050 $11.000 $8.940 $4.600 $23.000 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 80,087.000 $1.250 $1.210 $1.000 $1.700 $1.500
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 80,087.000 $0.150 $0.140 $0.190 $0.190 $0.300
DRILL SEEDING (TEMP) (WARM)
SY 40,043.500 $0.150 $0.100 $0.250 $0.130 $0.300
DRILL SEEDING (TEMP) (COOL)
SY 40,043.500 $0.150 $0.110 $0.250 $0.130 $0.300
VEGETATIVE WATERING
MG 1,347.960 $22.000 $23.310 $10.000 $15.000 $36.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 80,087.000 $1.350 $0.970 $0.670 $0.810 $1.300
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 16,818.000 $52.000 $62.610 $51.500 $53.000 $91.000
PRIME COAT (MULTI OPTION)
GAL 11,740.000 $4.750 $4.060 $3.850 $4.000 $5.000
ASPH (TIER I)
GAL 50,899.000 $3.250 $3.950 $3.300 $3.350 $4.450
AGGR(TY-PD GR-4 SAC-B)
CY 1,109.000 $95.000 $99.580 $113.000 $120.000 $158.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 9,250.000 $32.000 $37.260 $34.600 $37.300 $50.000
PLAN & TEXT ASPH CONC PAV(0" TO 1")
SY 1,423.000 $1.850 $3.610 $5.400 $2.750 $8.200
PLANE ASPH CONC PAV (2")
SY 5,187.000 $2.750 $2.560 $5.350 $2.750 $4.000
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
SY 1,213.000 $2.500 $3.610 $6.100 $3.750 $12.000
FLOWABLE BACKFILL
CY 6.000 $250.000 $262.510 $368.450 $268.000 $308.000
TRENCH EXCAVATION PROTECTION
LF 155.000 $12.000 $21.000 $15.790 $21.500 $25.000
TEMPORARY SPL SHORING
SF 1,547.000 $25.000 $25.000 $78.950 $85.000 $116.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 45.000 $285.000 $210.010 $405.290 $215.000 $246.000
RIPRAP (CONC)(4 IN)
CY 1,244.000 $450.000 $435.770 $526.350 $446.000 $510.000
RIPRAP (CONC)(CL B)(5 IN)
CY 164.400 $450.000 $451.520 $578.980 $460.000 $530.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 359.000 $150.000 $125.000 $263.180 $173.000 $420.000
RIPRAP (MOW STRIP)(4 IN)
CY 258.860 $490.000 $593.280 $631.620 $607.000 $627.000
RIPRAP (STONE COMMON)(DRY)(VAR. DEPTH)
CY 40.000 $250.000 $150.000 $210.540 $173.000 $300.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 300.000 $30.000 $28.000 $42.110 $30.000 $35.000
RETROFIT RAIL (TY T631)
LF 677.000 $75.000 $76.610 $77.380 $79.000 $690.000
CONC BOX CULV (5 FT X 3 FT)
LF 32.000 $450.000 $493.530 $789.530 $505.000 $570.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 64.000 $450.000 $488.280 $526.350 $500.000 $572.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 114.000 $475.000 $451.520 $578.990 $460.000 $530.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 18.000 $500.000 $803.290 $615.830 $820.000 $940.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 33.000 $650.000 $577.530 $657.940 $590.000 $680.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 60.000 $675.000 $505.080 $736.890 $517.000 $590.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 22.000 $800.000 $933.500 $842.160 $955.000 $1,100.000
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 36.000 $1,200.000 $761.290 $894.800 $799.000 $590.000
RC PIPE (CL III)(24 IN)
LF 80.000 $75.000 $70.350 $152.640 $72.000 $83.000
RC PIPE (CL III)(30 IN)
LF 87.000 $100.000 $93.450 $231.590 $95.000 $110.000
RC PIPE (CL III)(36 IN)
LF 14.000 $140.000 $149.110 $300.020 $152.000 $175.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $4,500.000 $6,037.820 $5,263.500 $6,180.000 $7,100.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $5,250.000 $9,713.020 $7,368.900 $9,950.000 $1,140.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $5,650.000 $6,405.340 $6,316.200 $6,560.000 $7,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $7,000.000 $8,610.460 $7,895.250 $8,115.000 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $8,000.000 $11,445.610 $8,947.950 $11,720.000 $13,000.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $7,000.000 $9,187.990 $7,895.250 $9,400.000 $11,000.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $6,650.000 $9,135.490 $6,842.550 $9,350.000 $10,700.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $8,500.000 $12,075.640 $10,000.650 $12,365.000 $14,200.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $12,000.000 $17,535.930 $11,053.350 $17,950.000 $20,600.000
WINGWALL (FW - S) (HW=7 FT)
EA 1.000 $15,000.000 $14,490.770 $13,158.750 $14,840.000 $17,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $38,000.000 $47,357.520 $36,844.500 $48,500.000 $56,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $12,000.000 $12,180.650 $13,158.750 $12,470.000 $14,500.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $18,000.000 $19,426.030 $21,054.000 $19,890.000 $22,800.000
WINGWALL (PW - 1) (HW=7 FT)
EA 5.000 $20,000.000 $19,636.050 $26,317.500 $20,100.000 $23,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 6.000 $22,500.000 $24,676.310 $29,475.600 $25,270.000 $29,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $875.000 $1,837.600 $1,052.700 $1,880.000 $2,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,100.000 $2,205.120 $1,263.240 $2,550.000 $2,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $2,362.630 $1,579.050 $2,420.000 $2,800.000
CLEAN EXIST CULVERTS
EA 20.000 $1,000.000 $3,675.200 $2,105.400 $3,760.000 $4,300.000
REMOV STR (SET)
EA 14.000 $450.000 $157.510 $789.530 $160.000 $185.000
REMOV STR (WINGWALL)
EA 22.000 $1,500.000 $315.020 $1,579.050 $320.000 $370.000
REMOV STR (HEADWALL)
EA 24.000 $1,500.000 $787.540 $1,579.050 $810.000 $920.000
REMOV STR (SMALL FENCE)
LF 72.000 $5.000 $10.000 $10.740 $11.000 $18.000
MOBILIZATION
LS 1.000 $560,000.000 $675,573.060 $1,038,970.000 $874,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $10,000.000 $3,221.160 $4,070.000 $5,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 740.000 $30.000 $30.930 $31.800 $30.110 $48.000
ROCK FILTER DAMS (REMOVE)
LF 740.000 $10.000 $13.370 $13.750 $8.600 $43.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $30.000 $22.430 $23.060 $15.050 $36.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $12.000 $7.720 $7.940 $2.000 $31.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 41,042.000 $2.500 $2.250 $2.320 $2.420 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 41,042.000 $0.750 $0.500 $0.520 $0.700 $1.500
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 160.000 $24.000 $100.000 $106.320 $38.000 $62.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 480.000 $5.000 $20.000 $33.600 $28.000 $62.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 160.000 $3.000 $80.000 $54.380 $25.000 $62.000
DRIVEWAYS (ACP)
SY 1,494.000 $45.000 $35.040 $27.650 $24.000 $72.000
DRIVEWAYS (SURF TREAT)
SY 659.000 $22.000 $26.280 $32.800 $23.250 $41.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,125.000 $22.000 $22.000 $25.130 $25.700 $42.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,700.000 $2,200.000 $3,123.360 $2,410.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,100.000 $1,150.000 $1,347.460 $1,375.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 6,494.000 $1.500 $2.000 $3.210 $3.280 $3.600
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $250.000 $200.000 $236.860 $240.000 $300.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 24.000 $2,500.000 $2,650.000 $2,999.140 $3,060.000 $4,000.000
WIRE FENCE (TY C)
LF 140.000 $15.000 $15.000 $24.320 $29.000 $18.000
GATE (TY 1)
EA 1.000 $1,200.000 $500.000 $1,921.180 $1,990.000 $600.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 9.000 $200.000 $200.000 $308.440 $195.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $475.000 $490.000 $605.300 $604.000 $810.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $575.000 $630.000 $696.890 $783.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $800.000 $930.000 $1,023.220 $1,268.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 26.000 $150.000 $20.000 $97.900 $90.000 $180.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $45.000 $85.000 $82.110 $72.800 $63.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 80.000 $15.000 $23.000 $31.580 $24.200 $34.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 43,543.000 $0.250 $0.290 $0.310 $0.310 $0.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 87,086.000 $0.600 $0.440 $0.460 $0.470 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,589.000 $1.000 $1.580 $0.890 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,856.000 $1.000 $1.580 $0.890 $1.000 $1.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 574.000 $0.850 $0.750 $0.790 $0.810 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,100.000 $0.850 $0.740 $0.780 $0.800 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 13.000 $6.000 $10.450 $11.000 $11.240 $24.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 25.000 $115.000 $195.000 $205.280 $210.000 $155.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $135.000 $135.000 $142.110 $145.000 $180.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 1,386.000 $5.000 $6.000 $6.320 $6.450 $6.800
REFL PAV MRK TY II (W) 4" (BRK)
LF 2,610.000 $0.150 $0.200 $0.210 $0.220 $0.300
REFL PAV MRK TY II (W) 4" (SLD)
LF 43,962.000 $0.150 $0.100 $0.110 $0.110 $0.200
REFL PAV MRK TY II (Y) 4" (SLD)
LF 49,094.000 $0.150 $0.100 $0.110 $0.110 $0.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,610.000 $0.350 $0.340 $0.360 $0.370 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,640.000 $0.350 $0.340 $0.360 $0.370 $0.600
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 43,962.000 $0.600 $0.600 $0.630 $0.650 $0.720
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 49,094.000 $0.600 $0.600 $0.630 $0.650 $0.720
REFL PAV MRKR TY I-C
EA 206.000 $4.150 $3.500 $3.680 $3.750 $5.000
REFL PAV MRKR TY II-A-A
EA 1,480.000 $4.150 $2.500 $2.630 $2.700 $4.500
PAV SURF PREP FOR MRK (ARROW)
EA 25.000 $14.000 $1.000 $1.050 $1.050 $24.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $20.000 $1.000 $1.050 $1.050 $24.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 16.000 $125.000 $105.010 $194.750 $108.000 $123.000
TREE PROTECTION
EA 10.000 $275.000 $421.660 $414.700 $375.000 $415.000
D-GR HMA TY-C PG76-22
TON 14,005.050 $80.000 $94.890 $85.550 $88.000 $109.000
D-GR HMA TY-C PG76-22 (LEVEL-UP)
TON 553.310 $105.000 $102.780 $136.000 $122.000 $152.000
TACK COAT
GAL 5,889.210 $3.000 $3.380 $5.450 $2.700 $4.750
MOVE CATTLE GUARD
EA 1.000 $2,500.000 $2,500.000 $8,509.680 $4,300.000 $6,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,500.000 $7,500.000 $2,700.000 $13,550.000 $13,000.000
TMA (STATIONARY)
DAY 2.000 $10,000.000 $300.000 $250.000 $350.000 $600.000
TMA (MOBILE OPERATION)
HR 80.000 $50.000 $100.000 $185.000 $110.000 $100.000
REML & DISPL DRIFTWOOD & DEBRIS
LS 1.000 $70,000.000 $5,000.000 $1,000.000 $3,300.000 $18,000.000
Totals: $7,172,732.650 $7,398,988.980 $7,834,774.657 $8,709,311.247 $11,507,585.668