LIPSCOMB FM 1454 (1339-02-028)

Items: 84

County: LIPSCOMB
Length: N/A
Highway: FM 1454
District: AMARILLO
Control Number: 1339-02-028
DBE Goal: N/A
Project: BR 2023(457)
Guaranty: N/A
Time: 315 WORKING DAYS
Engineer's Estimate: $10,968,220.80
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ZACHARY MAYER
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$10,968,220.80
$10,425,012.35
Over/Under Est: -4.95% -$543,208.45
$10,842,795.75
Over/Under Est: -1.14% -$125,425.05
Amt Left: 4.01% $417,783.40
$12,203,646.70
Over/Under Est: 11.26% $1,235,425.90
Amt Left: 17.06% $1,778,634.35
Delta: -12.55% -$1,360,850.95
$12,276,727.80
Over/Under Est: 11.93% $1,308,507.00
Amt Left: 17.76% $1,851,715.45
Delta: -0.60% -$73,081.10
Over/Under Est: 22.14% $2,428,305.51
Amt Left: 28.5% $2,971,513.96
Delta: -9.12% -$1,119,798.51
Subcontractor Percentage Amount
L A FULLER & SONS CONSTRUCTION, LTD. 12.33% $1,294,281.62
M & D FOUNDATION DRILLING INDUSTRIES, INC. 7.03% $737,939.97
MORRIS COUNTY CONTRACTORS, L.L.C. 0.94% $98,671.92
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.40% $41,988.05
LINEAR TRAFFIC MARKINGS LLC 0.39% $40,938.35
TORO BRAVO CONSTRUCTION, LLC 0.32% $33,590.44
S&S BRIDGE PAINTING 0.31% $32,540.74
FC TRAFFIC CONTROL, INC. 0.27% $28,341.93
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.18% $18,894.62
Total: 22.17% $2,327,187.64

Bid Items & Bid Tabulations

84 Total 0 of 84
LIPSCOMB  |  FM 1454  |  AMARILLO  |  1339-02-028  |  02/01/2023  |  $10,968,220.80  |  BR 2023(457)  |  BRIDGE REPL  |  315 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COPPELL CONSTRUCTION CO., INC.
EARTH BUILDERS, L.P.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
FLATIRON CONSTRUCTORS, INC.
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 12.000 $1,000.000 $1,120.000 $1,000.000 $1,100.000 $1,000.000 $1,000.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 2.000 $1,500.000 $1,880.000 $2,000.000 $1,500.000 $1,250.000 $2,700.000
PREP ROW (TREE) (2" TO 12" DIA)
EA 56.000 $500.000 $790.000 $500.000 $300.000 $1,000.000 $700.000
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 2.000 $3,000.000 $3,600.000 $3,500.000 $4,350.000 $1,500.000 $3,000.000
REMOVING CONC (RIPRAP)
SY 148.000 $40.000 $150.000 $20.000 $45.000 $50.000 $21.540
REMOVING STAB BASE AND ASPH PAV(15")
SY 977.000 $15.000 $22.600 $25.000 $25.000 $25.000 $42.660
EXCAVATION (ROADWAY)
CY 2,117.000 $35.000 $18.750 $25.000 $44.000 $50.000 $21.410
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 6,144.000 $38.000 $34.600 $38.000 $44.000 $50.000 $37.380
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 9.150 $1,000.000 $925.000 $900.000 $845.000 $900.000 $1,418.840
DRILL SEEDING (TEMP) (COOL)
AC 9.150 $800.000 $810.000 $900.000 $740.000 $800.000 $1,221.540
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 7,359.000 $3.000 $2.000 $2.750 $2.150 $2.500 $2.330
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 1,597.000 $60.000 $47.500 $55.000 $41.150 $50.000 $69.140
CEMENT
TON 18.000 $280.000 $300.000 $350.000 $370.000 $300.000 $281.100
CEMENT TREAT (SUBGRADE) (8")
SY 1,597.000 $14.000 $7.500 $20.000 $11.250 $20.000 $34.080
PRIME COAT(MC-30 OR AE-P)
GAL 399.000 $9.000 $9.000 $20.000 $10.400 $8.000 $8.780
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 1,480.000 $6.000 $14.000 $14.000 $16.650 $20.000 $17.960
CEM STABIL BKFL
CY 484.000 $290.000 $255.000 $250.000 $230.000 $500.000 $322.760
TEMPORARY SPL SHORING
SF 1,237.000 $75.000 $107.000 $20.000 $145.000 $65.000 $68.770
TEMPORARY SPL SHORING (COFFERDAM)
SF 3,640.000 $5.000 $122.000 $20.000 $50.000 $45.000 $93.780
DRILL SHAFT (18 IN)
LF 236.000 $200.000 $140.000 $140.000 $120.000 $100.000 $118.680
DRILL SHAFT (36 IN)
LF 3,364.000 $490.000 $355.000 $350.000 $325.000 $300.000 $310.440
CL B CONC (FLUME)
CY 12.700 $850.000 $780.000 $2,000.000 $1,010.000 $2,000.000 $4,180.100
CL C CONC (ABUT)(HPC)
CY 135.700 $1,650.000 $1,490.000 $2,000.000 $1,550.000 $2,000.000 $3,463.180
CL C CONC (CAP)(HPC)
CY 185.400 $2,000.000 $1,485.000 $2,000.000 $1,975.000 $2,000.000 $3,093.020
CL C CONC (COLUMN)(HPC)
CY 61.800 $2,000.000 $2,145.000 $2,000.000 $1,975.000 $2,000.000 $3,361.850
REINF CONC SLAB (HPC)
SF 46,200.000 $42.000 $38.500 $40.000 $43.600 $37.000 $59.800
APPROACH SLAB (HPC)
CY 131.700 $1,000.000 $1,100.000 $1,500.000 $975.000 $2,000.000 $2,030.900
PRESTR CONC GIRDER (TX40)
LF 5,370.000 $275.000 $290.000 $350.000 $255.000 $250.000 $376.730
PRESTR CONC GIRDER (TX54)
LF 597.500 $300.000 $390.000 $350.000 $335.000 $360.000 $462.660
EPOXY WATERPROOF FINISH (TY X)
SF 2,863.000 $45.000 $13.500 $15.000 $10.500 $15.000 $14.760
RIPRAP (CONC)(5 IN)
CY 70.000 $850.000 $895.000 $850.000 $650.000 $1,000.000 $650.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 510.000 $250.000 $220.000 $210.000 $140.000 $250.000 $93.100
RIPRAP (MOW STRIP)(4 IN)
CY 3.000 $1,000.000 $850.000 $850.000 $740.000 $700.000 $4,731.760
RAIL (TY T223)(HPC)
LF 2,182.000 $175.000 $180.000 $160.000 $215.000 $125.000 $294.530
HEADER TYPE EXPANSION JOINT
LF 317.000 $230.000 $135.000 $280.000 $185.000 $150.000 $251.610
GABIONS (3' X 3')(GALV)
CY 142.000 $270.000 $450.000 $380.000 $280.000 $500.000 $334.750
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $200,000.000 $100,000.000 $75,000.000 $396,000.000 $450,000.000 $50,053.370
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $350,000.000 $265,000.000 $400,000.000 $950,000.000 $1,300,000.000 $219,678.300
REMOV STR (SMALL)
EA 8.000 $1,000.000 $2,500.000 $2,000.000 $820.000 $1,000.000 $665.080
REMOV STR (SMALL FENCE)
LF 3,490.000 $5.000 $3.300 $5.000 $3.700 $2.000 $3.000
REMOV STR (TIMBER PILING)
EA 9.000 $500.000 $2,500.000 $1,000.000 $825.000 $900.000 $787.610
REMOV STR (TOP OF WALL)
LF 90.000 $55.000 $200.000 $100.000 $85.000 $50.000 $172.400
REMOVING ROCK RIPRAP
LF 165.000 $110.000 $75.000 $100.000 $45.000 $50.000 $28.430
MOBILIZATION
LS 1.000 $875,000.000 $1,130,000.000 $1,200,000.000 $1,200,000.000 $1,200,000.000 $1,312,859.580
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $35,000.000 $4,000.000 $3,500.000 $57,000.000 $40,000.000 $35,250.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $65.000 $75.000 $80.000 $85.000 $70.000 $65.620
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $13.000 $30.000 $10.000 $15.000 $30.000 $26.620
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 3,800.000 $6.000 $3.000 $5.000 $7.000 $3.000 $5.570
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,800.000 $2.500 $1.000 $1.300 $3.350 $1.000 $1.220
CONSTRUCTING DETOURS
SY 4,047.000 $110.000 $145.000 $145.000 $150.000 $200.000 $85.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $8,000.000 $5,000.000 $5,000.000 $10,000.000 $3,100.000 $8,000.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,200.000 $28.000 $25.000 $55.000 $27.000 $20.000 $41.870
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,200.000 $25.000 $23.000 $35.000 $27.000 $20.000 $41.130
DRIVEWAYS (ACP)
SY 49.000 $50.000 $160.000 $75.000 $150.000 $150.000 $96.940
MTL W-BEAM GD FEN (STEEL POST)
LF 900.000 $40.000 $34.000 $45.000 $34.850 $33.000 $37.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $3,000.000 $2,480.000 $2,000.000 $2,955.000 $2,800.000 $2,745.000
REMOVE METAL BEAM GUARD FENCE
LF 1,030.000 $4.000 $2.250 $8.000 $3.200 $3.000 $3.100
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $350.000 $236.000 $350.000 $320.000 $300.000 $355.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $3,570.000 $3,200.000 $3,460.000 $3,275.000 $3,380.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $310.000 $235.000 $500.000 $320.000 $300.000 $320.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,600.000 $1,150.000 $2,000.000 $2,100.000 $2,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $12,400.000 $12,000.000 $8,000.000 $7,500.000 $10,000.000
GATE (REMOVE)
EA 1.000 $550.000 $1,000.000 $300.000 $1,055.000 $1,000.000 $750.000
WIRE FENCE (TY C)
LF 4,515.000 $20.000 $20.000 $18.000 $21.100 $20.000 $33.700
GATE (TY 1)
EA 6.000 $2,500.000 $2,600.000 $2,000.000 $2,640.000 $2,500.000 $5,330.800
CORNER OR PULL POST AM(REM/REP)(METAL)
EA 19.000 $760.000 $1,500.000 $750.000 $1,320.000 $1,250.000 $8,908.380
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $1,150.000 $1,092.000 $1,000.000 $975.000 $925.000 $900.000
REMOVE SM RD SN SUP&AM
EA 6.000 $150.000 $100.000 $150.000 $105.000 $100.000 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 26.000 $20.000 $47.000 $35.000 $37.000 $35.000 $30.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 14.000 $40.000 $23.000 $5.000 $16.000 $15.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 27.000 $50.000 $47.000 $35.000 $48.000 $45.000 $40.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,465.000 $1.600 $1.250 $1.500 $2.100 $1.220 $2.040
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,000.000 $0.200 $0.300 $0.500 $0.550 $0.290 $0.510
REFL PAV MRK TY II (Y) 4" (SLD)
LF 2,000.000 $0.200 $0.300 $0.500 $0.550 $0.290 $0.510
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 5,316.000 $1.400 $2.000 $2.000 $2.100 $1.750 $2.040
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 5,316.000 $1.400 $2.000 $2.000 $2.100 $1.750 $2.040
ELIM EXT PAV MRK & MRKS (4")
LF 650.000 $1.500 $1.100 $1.300 $12.700 $1.000 $12.240
PAV SURF PREP FOR MRK (4")
LF 4,000.000 $0.200 $0.250 $0.400 $2.100 $0.220 $2.040
SP MIXES SP-D SAC-A PG70-28
TON 939.000 $215.000 $239.000 $290.000 $250.000 $225.000 $243.880
TACK COAT
GAL 901.000 $6.000 $9.500 $20.000 $9.000 $15.000 $9.690
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $1,000.000 $700.000 $500.000 $450.000 $2,000.000 $247.970
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $9,500.000 $20,000.000 $15,000.000 $20,000.000 $14,000.000
TMA (STATIONARY)
DAY 2.000 $500.000 $590.000 $500.000 $350.000 $1,500.000 $7,000.000
TMA (MOBILE OPERATION)
HR 8.000 $100.000 $235.000 $150.000 $95.000 $95.000 $1,500.000
Totals: $10,968,220.800 $10,425,012.350 $10,842,795.750 $12,203,646.700 $12,276,727.800 $13,396,526.331