Bid Cobra

LIMESTONE SH0007 (6399-58-001)

Items: 16

County: LIMESTONE
Length: N/A
Highway: SH0007
District: WACO
Control Number: 6399-58-001
DBE Goal: N/A
Project: RMC - 639958001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,003,893.19
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: BASE FAILURE PAVEMENT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,003,893.19
$896,110.25
Over/Under Est: -10.74% -$107,782.94
Over/Under Est: 7.02% $70,454.15
Amt Left: 19.89% $178,237.09
Over/Under Est: 7.37% $73,969.76
Amt Left: 20.28% $181,752.70
Delta: -0.33% -$3,515.61

Bid Items & Bid Tabulations

16 Total 0 of 16
LIMESTONE  |  SH0007  |  WACO  |  6399-58-001  |  05/05/2022  |  $1,003,893.19  |  RMC - 639958001  |  BASE FAILURE PAVMT REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
BACKFILL (TY A OR B)
CY 100.000 $25.000 $50.000 $19.100 $81.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 6,667.000 $50.000 $57.000 $60.900 $69.200
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 16,668.000 $30.000 $27.500 $37.570 $33.150
MOBILIZATION (CALLOUT)
EA 3.000 $24,725.730 $250.000 $0.010 $485.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,750.000 $1.000 $1.500 $0.960 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,750.000 $1.000 $1.500 $0.960 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 100.000 $7.000 $10.000 $10.000 $12.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,375.000 $1.000 $0.800 $0.710 $0.840
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 17,500.000 $1.000 $0.750 $0.690 $0.820
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,375.000 $1.000 $0.750 $0.680 $0.800
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 17,500.000 $1.000 $0.750 $0.680 $0.800
REFL PAV MRKR TY I-C
EA 200.000 $5.000 $10.000 $6.550 $7.750
REFL PAV MRKR TY II-A-A
EA 219.000 $4.000 $10.000 $9.000 $10.650
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 150.000 $80.000 $25.000 $0.010 $1.000
TMA (STATIONARY)
DAY 150.000 $160.000 $25.000 $0.010 $1.000
TMA (MOBILE OPERATION)
HR 100.000 $80.000 $10.000 $25.000 $100.000
Totals: $1,003,893.190 $896,110.250 $1,074,347.340 $1,077,862.950