LIMESTONE FM 1633 (1664-01-019)

Items: 119

County: LIMESTONE
Length: N/A
Highway: FM 1633
District: WACO
Control Number: 1664-01-019
DBE Goal: N/A
Project: STP 2020(398)
Guaranty: N/A
Time: 195 WORKING DAYS
Engineer's Estimate: $7,658,636.10
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATE PAVEMENT STRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,658,636.10
$7,107,478.07
Over/Under Est: -7.2% -$551,158.03
Over/Under Est: -4.85% -$371,159.43
Amt Left: 2.53% $179,998.60
Over/Under Est: -3.01% -$230,679.03
Amt Left: 4.51% $320,479.00
Delta: -1.93% -$140,480.40
$9,067,067.69
Over/Under Est: 18.39% $1,408,431.59
Amt Left: 27.57% $1,959,589.62
Delta: -22.07% -$1,639,110.62

Bid Items & Bid Tabulations

119 Total 0 of 119
LIMESTONE  |  FM 1633  |  WACO  |  1664-01-019  |  12/04/2019  |  $7,658,636.10  |  STP 2020(398)  |  REHAB PAVMT STRUCT  |  195 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
PREPARING ROW
STA 490.900 $1,900.000 $400.000 $500.000 $191.000 $570.000
EXCAVATION (ROADWAY)
CY 55.000 $7.000 $22.000 $25.000 $9.650 $80.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,939.000 $12.000 $39.000 $25.000 $13.850 $11.000
BACKFILL (TY A OR B)
STA 431.000 $143.100 $90.000 $150.000 $99.150 $120.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 284,824.000 $0.120 $0.010 $0.110 $0.150 $0.150
DRILL SEEDING (TEMP) (WARM)
SY 142,412.000 $0.070 $0.010 $0.060 $0.130 $0.150
DRILL SEEDING (TEMP) (COOL)
SY 142,412.000 $0.070 $0.010 $0.060 $0.130 $0.150
VEGETATIVE WATERING
MG 4,625.500 $9.030 $1.000 $1.000 $1.000 $8.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 27,756.000 $1.200 $0.800 $1.000 $1.210 $1.300
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 1,370.000 $34.920 $35.000 $45.000 $33.650 $60.000
FOG SEAL (SS-1)
GAL 17,803.000 $3.000 $3.350 $3.000 $3.400 $3.800
ASPH (CRS-2)
GAL 43,313.000 $2.660 $3.000 $2.250 $2.750 $3.400
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 1,237.000 $70.000 $178.000 $95.000 $113.400 $100.000
D-GR HMA(SQ) TY-B PG64-22
TON 438.000 $110.000 $82.000 $75.000 $86.150 $88.000
D-GR HMA TY-C SAC-B PG64-22
TON 19,936.000 $65.000 $78.500 $72.000 $69.700 $78.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 9,932.000 $1.340 $1.200 $2.000 $1.100 $2.200
CEM STABIL BKFL
CY 319.000 $63.540 $136.000 $125.000 $144.000 $140.000
CUT & RESTORE ASPH PAVING
SY 493.000 $75.000 $10.000 $100.000 $10.500 $165.000
TRENCH EXCAVATION PROTECTION
LF 195.000 $1.920 $6.000 $10.000 $6.350 $22.000
TEMPORARY SPL SHORING
SF 2,468.000 $9.000 $16.000 $25.000 $16.850 $50.000
CONC STR REPAIR (STANDARD)
SF 52.500 $350.000 $168.000 $250.000 $177.000 $83.000
RIPRAP (CONC)(4 IN)
CY 21.000 $367.920 $395.000 $400.000 $415.000 $500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 298.000 $101.420 $130.000 $100.000 $137.000 $110.000
RIPRAP (MOW STRIP)(4 IN)
CY 191.000 $440.180 $395.000 $450.000 $415.000 $720.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 168.000 $75.580 $46.000 $75.000 $46.500 $55.000
RETROFIT RAIL (TY T131RC)
LF 120.000 $167.410 $308.960 $200.000 $395.000 $166.000
CONC BOX CULV (4 FT X 3 FT)
LF 220.000 $171.370 $280.000 $375.000 $295.000 $440.000
CONC BOX CULV (8 FT X 6 FT)
LF 100.000 $443.000 $657.000 $675.000 $690.000 $990.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 32.000 $582.050 $562.000 $750.000 $590.000 $825.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 32.000 $650.000 $602.000 $850.000 $635.000 $935.000
RC PIPE (CL III)(18 IN)
LF 1,644.000 $50.650 $48.000 $55.000 $50.500 $55.000
RC PIPE (CL III)(24 IN)
LF 192.000 $52.820 $63.000 $75.000 $66.300 $121.000
RC PIPE (CL III)(30 IN)
LF 24.000 $71.020 $85.000 $115.000 $90.000 $160.000
RC PIPE (CL III)(36 IN)
LF 58.000 $92.830 $119.000 $135.000 $165.000 $195.800
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $5,500.000 $8,019.000 $5,000.000 $8,440.000 $9,350.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $33,000.000 $31,000.000 $40,000.000 $32,630.000 $31,900.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $11,500.000 $9,423.000 $8,000.000 $9,920.000 $8,800.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $14,500.000 $10,342.000 $14,000.000 $10,855.000 $12,100.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $19,000.000 $11,481.000 $20,000.000 $12,085.000 $18,700.000
WINGWALL (PW - 1) (HW=8 FT)
EA 5.000 $23,500.000 $15,000.000 $27,500.000 $15,790.000 $22,000.000
SET (TY I) (36 IN) (3: 1) (C)
EA 3.000 $7,350.000 $8,015.000 $5,250.000 $8,440.000 $7,150.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $6,605.260 $8,741.000 $4,000.000 $9,200.000 $8,250.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $8,000.000 $9,063.000 $5,500.000 $9,540.000 $8,800.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 2.000 $8,274.850 $11,062.000 $9,500.000 $11,645.000 $12,650.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $462.400 $900.000 $800.000 $950.000 $935.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 124.000 $710.000 $975.000 $900.000 $1,025.000 $1,045.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $794.380 $980.000 $1,000.000 $1,030.000 $990.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,040.000 $1,113.000 $1,050.000 $1,170.000 $1,100.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 3.000 $2,302.000 $1,425.000 $1,600.000 $1,500.000 $3,850.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $2,430.000 $3,012.000 $2,000.000 $3,170.000 $4,400.000
CLEAN EXIST CULVERTS
EA 17.000 $2,572.830 $1,440.000 $1,750.000 $1,515.000 $1,650.000
REMOV STR (WINGWALL)
EA 9.000 $1,500.000 $1,110.000 $1,500.000 $1,170.000 $1,650.000
REMOV STR (HEADWALL)
EA 8.000 $2,500.000 $1,110.000 $1,500.000 $1,170.000 $1,650.000
REMOV STR (PIPE)
LF 1,189.000 $10.760 $9.000 $15.000 $9.500 $33.000
REMOV STR (BOX CULVERT)
LF 46.000 $32.320 $217.000 $100.000 $230.000 $220.000
SALV MATRL (CREDIT ITEM)
LS 1.000 $1.000 $1.000 $0.010 $1.000
MOBILIZATION
LS 1.000 $603,000.000 $646,010.000 $700,000.000 $444,805.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $800.000 $8,500.000 $4,271.000 $6,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 5,200.000 $25.000 $30.000 $26.000 $28.420 $30.000
ROCK FILTER DAMS (REMOVE)
LF 5,200.000 $4.710 $10.000 $5.000 $9.470 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 852.000 $21.770 $31.250 $10.000 $17.890 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 852.000 $6.640 $9.220 $3.000 $8.420 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 22,882.000 $2.730 $1.900 $3.000 $2.890 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 22,882.000 $0.460 $0.500 $0.500 $0.790 $0.700
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $4,036.090 $5,500.000 $7,500.000 $2,600.000 $9,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 360.000 $10.000 $16.400 $25.000 $20.950 $35.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,070.000 $10.000 $14.000 $15.000 $16.900 $35.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 360.000 $8.000 $15.200 $25.000 $19.750 $35.000
INTERSECTIONS (ACP)
SY 3,021.000 $35.000 $15.600 $25.000 $27.000 $20.000
DRIVEWAYS (CONC)
SY 156.000 $70.060 $90.000 $90.000 $94.750 $140.000
DRIVEWAYS (ACP)
SY 10,106.000 $28.570 $26.000 $17.000 $25.800 $18.000
TURNOUTS (ACP)
SY 1,077.000 $32.710 $37.150 $25.000 $27.100 $18.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,450.000 $23.000 $22.820 $25.000 $26.320 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,946.540 $1,975.560 $1,750.000 $2,642.030 $1,700.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,500.000 $1,265.600 $1,000.000 $1,263.120 $1,100.000
TRANSITION ADJUSTMENT
EA 1.000 $225.000 $399.250 $550.000 $894.710 $600.000
SHORT RADIUS
LF 22.000 $40.000 $25.190 $25.000 $73.680 $25.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $870.000 $992.050 $525.000 $1,105.230 $578.000
REMOVE METAL BEAM GUARD FENCE
LF 2,512.000 $2.730 $2.000 $3.000 $3.950 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 21.000 $2,537.000 $2,830.000 $2,750.000 $2,605.190 $2,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 40.000 $1,500.000 $1,750.000 $1,500.000 $1,735.000 $2,200.000
CRASH CUSH ATTEN (STKPL)
EA 12.000 $1,000.000 $1,250.000 $1,000.000 $1,365.000 $2,200.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 12.000 $14,000.000 $13,425.000 $14,000.000 $12,710.000 $18,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 60.000 $200.000 $200.000 $200.000 $205.260 $220.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 5.000 $261.110 $225.000 $250.000 $226.310 $240.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 2.000 $500.000 $450.000 $350.000 $368.410 $390.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 82.000 $463.780 $400.000 $400.000 $399.990 $420.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 12.000 $500.000 $450.000 $450.000 $473.670 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $515.810 $450.000 $500.000 $499.990 $520.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $552.830 $550.000 $550.000 $552.620 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 2.000 $700.770 $700.000 $600.000 $621.040 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $759.110 $600.000 $650.000 $652.610 $680.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $799.800 $700.000 $700.000 $736.820 $780.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 11.000 $700.000 $800.000 $800.000 $842.080 $900.000
REMOVE SM RD SN SUP&AM
EA 106.000 $72.210 $100.000 $50.000 $47.370 $50.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 38.000 $70.670 $71.500 $60.000 $61.050 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $36.680 $25.950 $30.000 $30.530 $40.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 132.000 $0.200 $5.000 $2.000 $5.250 $2.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 132.000 $0.210 $5.000 $2.000 $5.250 $2.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 184.000 $10.000 $45.000 $15.000 $47.400 $13.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,800.000 $0.900 $0.900 $1.000 $1.000 $0.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,335.000 $0.770 $0.650 $2.000 $0.680 $1.820
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 230.000 $4.960 $11.850 $7.000 $12.500 $7.700
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 320.000 $0.550 $0.900 $3.000 $0.950 $3.300
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 99,837.000 $0.600 $0.690 $0.700 $0.730 $0.720
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 6,330.000 $0.710 $0.740 $0.750 $0.780 $0.830
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 69,640.000 $0.600 $0.700 $0.700 $0.740 $0.720
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $475.000 $600.000 $575.000 $632.000 $610.500
REFL PAV MRKR TY I-C
EA 64.000 $4.000 $8.000 $4.500 $8.450 $4.950
REFL PAV MRKR TY II-A-A
EA 1,153.000 $4.000 $4.250 $4.500 $4.500 $4.950
EMULSION
GAL 784,143.000 $1.210 $0.000 $0.000 $2.260 $2.200
CEMENT
TON 886.000 $149.460 $0.000 $0.000 $255.000 $158.000
EMUL TRTMNT (MX EXST MTRL)10"
SY 187,594.000 $4.000 $0.000 $0.000 $1.720 $4.200
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,125.000 $6,500.000 $10,000.000 $2,500.000 $14,000.000
TMA (STATIONARY)
DAY 170.000 $190.000 $250.000 $150.000 $425.000 $500.000
TMA (MOBILE OPERATION)
HR 144.000 $40.000 $45.000 $50.000 $65.700 $90.000
1
CEMENT
TON 886.000 $149.460 $150.000 $190.000 $0.000 $0.000
1
FOAMED ASPHALT TREAT (10")(DC)
SY 187,594.000 $4.000 $3.150 $3.510 $0.000 $0.000
1
ASPHALT BINDER (PG64-22)
TON 2,110.000 $450.240 $435.000 $450.000 $0.000 $0.000
Totals: $9,490,246.695 $7,107,480.070 $7,287,478.670 $7,427,957.090 $9,067,069.690