LIMESTONE COUNTY ROAD 443 (0909-40-079)

Items: 48

County: LIMESTONE
Length: 0.0000 MILES (7.5153 MILES)
Highway: COUNTY ROAD 443
District: WACO
Control Number: 0909-40-079
DBE Goal: 0.0%
Project: BR 2024(442)
Guaranty: $46,000.00
Time: 181 WORKING DAYS
Engineer's Estimate: $2,284,078.21
Date: 07/01/2026 1:00 PM CDT (17 days ago) Changed
Contract Number: 7263237
Type: BRIDGE REPLACEMENT
Project ID: A00131299
Contract Type: FEDERAL
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOSH VOILES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$2,284,078.21
$2,080,557.94
Over/Under Est: -8.91% -$203,520.27
Over/Under Est: -5.11% -$116,729.88
Amt Left: 4.17% $86,790.39
Over/Under Est: 4.08% $93,207.79
Amt Left: 14.26% $296,728.06
Delta: -9.69% -$209,937.67
Over/Under Est: 7.67% $175,213.49
Amt Left: 18.2% $378,733.76
Delta: -3.45% -$82,005.70
$2,534,874.00
Over/Under Est: 10.98% $250,795.79
Amt Left: 21.84% $454,316.06
Delta: -3.07% -$75,582.30
$2,819,410.09
Over/Under Est: 23.44% $535,331.88
Amt Left: 35.51% $738,852.15
Delta: -11.22% -$284,536.09
Over/Under Est: 26.16% $597,443.61
Amt Left: 38.5% $800,963.88
Delta: -2.20% -$62,111.73
Over/Under Est: 33.05% $754,858.79
Amt Left: 46.06% $958,379.06
Delta: -5.46% -$157,415.18

Bid Items & Bid Tabulations

48 Total 0 of 48
LIMESTONE  |  COUNTY ROAD 443  |  WACO  |  0909-40-079  |  07/01/2026 1:00 PM CDT  |  $2,284,078.21  |  BR 2024(442)  |  BRIDGE REPL  |  181 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TUCAN CONTRACTING, LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
KNIFE RIVER CORPORATION - SOUTH
PMCO CONSTRUCTION LLC
YOKO EXCAVATING, LLC
PRESIDIO CONTRACTING, LLC
JOE BLAND CONSTRUCTION LLC
PREPARING ROW
STA 17.750 $2,900.000 $2,725.000 $1,000.000 $2,300.000 $3,900.000 $4,000.000 $5,945.300 $5,365.000 $2,500.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 2,663.000 $6.000 $10.900 $5.000 $4.000 $6.500 $10.000 $14.180 $12.000 $10.000
EXCAV (ROADWAY)
CY 1,692.000 $30.000 $10.900 $10.000 $20.000 $22.000 $20.000 $23.150 $40.000 $34.000
EXCAV (CHANNEL)
CY 945.000 $25.000 $10.900 $10.000 $20.000 $29.000 $24.000 $44.400 $40.000 $44.000
EMBANK (FNL)(DC)(TY B)
CY 861.000 $40.000 $27.250 $20.000 $30.000 $15.000 $24.000 $92.810 $31.000 $36.000
FURN & PLACE TOPSOIL (4")
SY 5,141.000 $3.000 $4.360 $4.000 $1.000 $1.450 $4.000 $10.170 $5.500 $4.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 5,141.000 $3.000 $0.450 $0.750 $2.000 $1.100 $2.150 $2.020 $0.500 $0.250
BROADCAST SEED (TEMP_WARM_COOL)
SY 5,141.000 $0.430 $0.400 $0.750 $1.500 $0.750 $2.150 $1.290 $0.370 $0.250
VEGETATIVE WATERING
TGL 84.000 $37.000 $43.600 $1.000 $1.000 $25.000 $25.000 $137.370 $155.000 $60.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 5,141.000 $0.850 $0.800 $1.500 $2.000 $1.400 $2.200 $2.010 $0.800 $6.000
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 794.000 $75.000 $38.150 $90.000 $90.000 $100.000 $125.000 $109.400 $165.600 $120.000
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 5,718.000 $4.000 $10.900 $6.000 $6.000 $1.000 $9.000 $8.630 $5.250 $7.000
CEM STABIL BKFL
CY 350.000 $210.000 $196.200 $160.000 $285.000 $282.000 $300.000 $280.250 $251.000 $235.000
DRILL SHAFT (24 IN)
LF 1,185.000 $200.000 $206.460 $275.000 $170.000 $235.000 $205.000 $297.650 $207.700 $290.000
DRILL SHAFT (30 IN)
LF 102.000 $300.000 $256.150 $400.000 $275.000 $335.000 $320.000 $681.420 $367.650 $250.000
CL C CONC (ABUT)
CY 106.800 $1,400.000 $1,090.000 $1,030.000 $1,600.000 $1,650.000 $1,500.000 $1,777.970 $1,465.000 $2,050.000
CL C CONC (CAP)
CY 6.700 $1,600.000 $1,635.000 $1,600.000 $2,000.000 $2,050.000 $3,000.000 $1,867.360 $2,030.000 $5,875.000
CL C CONC (COLUMN)
CY 3.100 $1,600.000 $1,962.000 $2,000.000 $2,800.000 $2,950.000 $3,500.000 $3,900.230 $2,840.000 $2,075.000
REINF CONC SLAB (BOX BEAM)
SF 1,962.000 $40.000 $22.890 $20.000 $28.000 $29.000 $30.000 $21.020 $33.400 $44.000
REINF CONC SLAB (SLAB BEAM)
SF 5,200.000 $27.000 $21.800 $20.000 $26.000 $29.000 $30.000 $28.140 $31.700 $48.000
PRESTR CONC SLAB BEAM (5SB12)
LF 370.000 $245.000 $273.090 $220.000 $305.000 $305.000 $305.000 $300.700 $336.700 $500.000
PRESTR CONC SLAB BEAM (5SB15)
LF 617.500 $290.000 $281.850 $210.000 $305.000 $305.000 $295.000 $294.170 $316.100 $395.000
PRESTR CONC BOX BEAM (4B28)
LF 298.000 $340.000 $283.760 $300.000 $375.000 $375.000 $272.000 $357.550 $297.050 $485.000
PRESTR CONC BOX BEAM (5B28)
LF 149.000 $340.000 $338.630 $300.000 $375.000 $375.000 $322.000 $399.830 $297.050 $525.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,694.000 $200.000 $147.150 $150.000 $170.000 $135.000 $160.000 $166.980 $190.000 $165.000
RAIL (TY T223)
LF 690.000 $170.000 $196.200 $150.000 $220.000 $165.000 $150.000 $165.620 $159.000 $140.000
TYPE A JOINT
LF 266.000 $65.000 $76.000 $60.000 $75.000 $40.000 $40.000 $41.030 $32.000 $125.000
RC PIPE (CL IV)(18 IN)
LF 25.000 $100.000 $119.900 $100.000 $60.000 $120.000 $160.000 $306.530 $148.500 $395.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,350.000 $1,199.000 $1,300.000 $1,200.000 $1,500.000 $1,550.000 $1,865.010 $2,865.000 $3,350.000
REMOV STR (PIPE)
LF 21.000 $20.000 $16.350 $20.000 $20.000 $20.000 $40.000 $49.310 $45.000 $195.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 5.000 $11,250.000 $10,900.000 $22,000.000 $12,000.000 $16,500.000 $12,750.000 $24,980.000 $35,000.000 $20,000.000
MOBILIZATION
LS 1.000 $54,730.030 $100,000.000 $216,715.330 $200,000.000 $220,000.000 $250,000.000 $112,850.000 $288,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $1,090.000 $1,000.000 $4,500.000 $1,500.000 $3,000.000 $2,494.900 $4,300.000 $1,750.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 664.000 $40.000 $43.850 $30.000 $1.000 $45.000 $30.000 $44.980 $36.400 $60.000
ROCK FILTER DAMS (REMOVE)
LF 664.000 $10.000 $13.700 $10.000 $1.000 $10.000 $10.000 $14.030 $12.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,737.000 $5.140 $3.270 $4.000 $1.000 $6.000 $4.000 $5.300 $4.500 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,737.000 $1.500 $1.090 $1.000 $1.000 $1.000 $1.000 $1.000 $0.700 $1.000
DRIVEWAYS (SURF TREAT)
SY 56.000 $35.000 $49.050 $65.000 $95.000 $50.000 $125.000 $82.600 $50.000 $75.000
MTL W-BEAM GD FEN (STEEL POST)
LF 375.000 $34.000 $32.700 $26.000 $30.000 $33.000 $32.000 $31.590 $31.600 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,500.000 $2,398.000 $2,250.000 $2,200.000 $3,100.000 $2,300.000 $2,799.280 $3,274.000 $2,950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,400.000 $1,308.000 $1,300.000 $1,500.000 $1,300.000 $1,375.000 $1,593.750 $1,265.000 $1,925.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,350.000 $3,270.000 $2,800.000 $3,000.000 $3,100.000 $3,165.000 $3,000.000 $3,160.000 $3,850.000
REMOVE AND INSTALL EXISTING GATE
EA 1.000 $2,000.000 $2,725.000 $900.000 $500.000 $2,000.000 $2,250.000 $1,500.000 $2,500.000 $4,538.000
WIRE FENCE (TY C)
LF 1,543.000 $20.000 $16.350 $25.000 $20.000 $15.000 $20.000 $16.260 $15.000 $8.000
REMOVE SM RD SN SUP&AM
EA 5.000 $65.000 $163.500 $100.000 $50.000 $50.000 $176.000 $173.840 $150.000 $145.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 24.000 $40.000 $21.800 $40.000 $20.000 $22.000 $35.000 $31.400 $25.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000 $40.000 $49.050 $40.000 $45.000 $50.000 $45.000 $44.840 $50.000 $30.000
REM LEAD-CONTAINING COATING(LOCATION)
EA 1.000 $2,000.000 $9,810.000 $7,875.000 $500.000 $5,000.000 $7,501.000 $7,000.000 $7,500.000 $12,500.000
Totals: $2,284,078.190 $2,080,557.935 $2,167,348.330 $2,377,286.000 $2,459,291.700 $2,534,874.000 $2,819,410.081 $2,881,521.820 $3,038,937.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $2,500.00
Total: $3,500.00