Job Info for 0909-40-076

County: LIMESTONE Highway: CR Date: 10/02/2020 (4 years ago) Engineer's Estimate: $655,173 Control Number: 0909-40-076
Project: BR 2018(477) District: WACO Time: 105 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $655,173.40
FUQUA CONSTRUCTION CO., INC.   $733,162.17 1
11.9% | $77,988.77
SB CONTRACTORS LLC   $746,770.20 2
13.98% | $91,596.80
1.86% | $13,608.03
HODGES AND SON CONSTRUCTION COMPANY, INC.   $789,453.70 3
20.5% | $134,280.30
7.68% | $56,291.53
5.72% | $42,683.50
KNIFE RIVER CORPORATION - SOUTH   $876,419.80 4
33.77% | $221,246.40
19.54% | $143,257.63
11.02% | $86,966.10
FLUOR HEAVY CIVIL, LLC   $945,677.99 5
44.34% | $290,504.59
28.99% | $212,515.82
7.90% | $69,258.19
B & MS CONSTRUCTION, INC.   $951,052.34 6
45.16% | $295,878.94
29.72% | $217,890.17
0.57% | $5,374.35
JAMES CONSTRUCTION GROUP, L.L.C.   $1,037,036.99 7
58.28% | $381,863.59
41.45% | $303,874.82
9.04% | $85,984.65
A. L. HELMCAMP, INC.   $1,143,015.67 8
74.46% | $487,842.27
55.9% | $409,853.50
10.22% | $105,978.68
HARPER BROTHERS CONSTRUCTION LLC   $1,218,207.10 9
85.94% | $563,033.70
66.16% | $485,044.93
6.58% | $75,191.43

Bid Items

Items: 47, 0 filtered
LIMESTONE CR  |  WACO  |  0909-40-076  |  10/02/2020  |  $655,173  |  BR 2018(477)  |  REPLACE BRIDGE AND APPROACHES  |  105 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FUQUA CONSTRUCTION CO., INC. SB CONTRACTORS LLC HODGES AND SON CONSTRUCTION COMPANY, INC. KNIFE RIVER CORPORATION - SOUTH FLUOR HEAVY CIVIL, LLC B & MS CONSTRUCTION, INC. JAMES CONSTRUCTION GROUP, L.L.C. A. L. HELMCAMP, INC. HARPER BROTHERS CONSTRUCTION LLC
100 6002 PREPARING ROW STA 7.100 $1,000.000 $1,200.000 $2,500.000 $3,000.000 $5,000.000 $13,237.530 $2,369.000 $13,500.000 $10,000.000 $3,575.000
110 6001 EXCAVATION (ROADWAY) CY 254.000 $25.000 $10.000 $10.930 $20.000 $35.000 $4.610 $13.800 $18.040 $65.000 $25.000
110 6002 EXCAVATION (CHANNEL) CY 446.000 $15.000 $15.000 $7.070 $15.000 $20.000 $3.760 $48.000 $16.040 $40.000 $30.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 642.000 $20.000 $12.000 $16.830 $20.000 $15.000 $12.880 $16.000 $35.020 $40.000 $35.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 2,444.000 $2.000 $2.000 $3.060 $2.000 $1.750 $0.440 $1.040 $1.780 $5.000 $2.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 2,444.000 $1.000 $1.000 $0.830 $1.500 $1.100 $0.550 $0.480 $1.000 $1.100 $0.500
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 2,444.000 $1.000 $0.750 $0.830 $1.500 $0.750 $0.480 $0.100 $0.750 $0.830 $0.500
168 6001 VEGETATIVE WATERING MG 39.700 $20.000 $25.000 $61.340 $1.000 $50.000 $29.350 $157.550 $18.000 $20.000 $30.000
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 1,715.000 $2.000 $1.850 $1.680 $1.000 $2.000 $1.290 $2.200 $1.850 $2.000 $3.000
247 6053 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY 328.000 $60.000 $75.000 $69.190 $70.000 $75.000 $125.220 $41.860 $80.010 $65.000 $154.520
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 393.000 $6.500 $6.000 $7.370 $8.000 $10.000 $7.770 $4.080 $6.600 $15.000 $6.600
316 6022 ASPH (CRS-2) GAL 1,220.000 $8.000 $6.000 $3.900 $4.000 $5.000 $4.120 $3.160 $3.500 $5.000 $3.500
316 6453 AGGR(TY D GR 3 OR TY L GR 3) CY 22.000 $200.000 $200.000 $780.660 $750.000 $400.000 $823.790 $138.000 $700.000 $1,200.000 $700.000
340 6032 D-GR HMA(SQ) TY-C SAC-B PG64-22 TON 225.000 $150.000 $150.000 $184.010 $220.000 $125.000 $205.950 $201.250 $165.000 $200.000 $175.000
400 6005 CEM STABIL BKFL CY 77.000 $180.000 $150.000 $143.260 $250.000 $135.000 $212.210 $296.130 $154.950 $185.000 $200.000
402 6001 TRENCH EXCAVATION PROTECTION LF 26.000 $10.000 $14.000 $24.150 $100.000 $16.000 $1.260 $17.770 $165.920 $28.000 $5.000
403 6001 TEMPORARY SPL SHORING SF 1,440.000 $25.000 $36.000 $5.890 $7.000 $41.000 $3.580 $23.690 $5.990 $45.000 $5.000
416 6002 DRILL SHAFT (24 IN) LF 180.000 $200.000 $155.000 $172.800 $155.000 $200.000 $178.820 $283.710 $187.510 $210.000 $350.000
420 6013 CL C CONC (ABUT) CY 21.000 $1,000.000 $1,000.000 $1,041.750 $1,200.000 $1,500.000 $992.070 $1,118.950 $1,045.850 $1,800.000 $1,650.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 1,300.000 $18.000 $24.000 $30.760 $24.000 $28.000 $26.740 $25.300 $28.100 $50.000 $55.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 247.410 $190.000 $234.500 $238.510 $200.000 $240.000 $257.610 $224.600 $174.140 $275.000 $300.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 414.000 $100.000 $180.000 $172.860 $115.000 $97.000 $131.200 $290.000 $162.800 $80.000 $150.000
450 6006 RAIL (TY T223) LF 275.000 $120.000 $96.000 $96.850 $140.000 $170.000 $89.960 $156.750 $95.680 $225.000 $235.000
462 6028 CONC BOX CULV (9 FT X 9 FT) LF 78.000 $900.000 $936.800 $1,004.740 $1,000.000 $1,000.000 $1,067.490 $829.150 $726.760 $1,500.000 $2,400.000
464 6005 RC PIPE (CL III)(24 IN) LF 25.000 $80.000 $113.600 $78.280 $85.000 $80.000 $119.510 $110.000 $104.940 $140.000 $175.000
466 6172 WINGWALL (PW - 1) (HW=11 FT) EA 2.000 $30,000.000 $36,000.000 $26,261.370 $45,000.000 $37,500.000 $78,423.770 $56,000.000 $24,323.950 $45,000.000 $72,500.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $1,500.000 $774.400 $1,233.070 $2,000.000 $1,450.000 $2,755.080 $2,724.350 $1,472.860 $1,175.000 $1,750.000
496 6007 REMOV STR (PIPE) LF 28.000 $15.000 $10.000 $28.470 $20.000 $15.000 $14.860 $23.690 $32.780 $100.000 $15.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 2.000 $12,000.000 $20,000.000 $15,000.000 $20,000.000 $15,000.000 $8,647.370 $29,000.000 $115,295.000 $6,000.000 $20,000.000
500 6001 MOBILIZATION LS 1.000 $60,000.000 $63,527.890 $74,000.000 $70,000.000 $86,000.000 $94,500.000 $50,000.000 $103,795.920 $100,000.000 $90,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $1,000.000 $411.590 $2,500.000 $2,000.000 $1,000.000 $830.590 $6,500.000 $1,409.150 $11,000.000 $4,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 60.000 $30.000 $40.000 $46.840 $20.000 $43.000 $24.220 $41.400 $40.000 $45.000 $75.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 60.000 $10.000 $15.000 $11.150 $10.000 $15.000 $11.870 $17.770 $15.000 $16.000 $30.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,509.000 $3.000 $3.500 $5.570 $1.000 $5.000 $7.060 $7.250 $3.500 $4.000 $2.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,509.000 $1.000 $1.500 $1.680 $1.000 $1.500 $1.080 $4.540 $1.500 $2.000 $1.000
508 6001 CONSTRUCTING DETOURS SY 304.000 $50.000 $46.890 $66.530 $120.000 $250.000 $151.040 $69.460 $168.650 $130.000 $275.560
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 175.000 $25.000 $25.500 $38.810 $25.000 $22.000 $25.500 $34.500 $28.300 $22.000 $25.500
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,000.000 $1,125.000 $1,232.310 $1,200.000 $875.000 $1,125.000 $296.130 $979.580 $880.000 $1,125.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,000.000 $1,375.000 $1,109.650 $1,200.000 $1,000.000 $1,375.000 $2,121.750 $1,190.000 $990.000 $1,375.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 4.000 $700.000 $832.000 $1,031.570 $1,000.000 $700.000 $832.000 $3,500.000 $823.000 $700.000 $832.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,500.000 $2,450.000 $3,206.240 $2,500.000 $2,600.000 $2,450.000 $3,152.150 $2,875.000 $2,600.000 $2,450.000
552 6003 WIRE FENCE (TY C) LF 449.000 $10.000 $8.000 $13.390 $15.000 $12.500 $12.640 $7.020 $10.000 $10.000 $5.000
644 6075 RELOCATE SM RD SN SUP&AM(SIGN ONLY) EA 1.000 $220.000 $230.000 $278.810 $100.000 $800.000 $349.510 $293.830 $250.000 $1,000.000 $550.000
644 6076 REMOVE SM RD SN SUP&AM EA 5.000 $120.000 $130.000 $111.520 $50.000 $27.000 $78.450 $111.090 $150.000 $400.000 $75.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 8.000 $20.000 $15.000 $22.310 $30.000 $26.000 $35.000 $34.040 $18.160 $25.000 $35.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 4.000 $45.000 $32.000 $39.040 $40.000 $40.000 $50.000 $49.110 $36.500 $40.000 $50.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 56.000 $90.000 $100.000 $65.000 $95.000 $100.000 $114.300 $101.890 $45.000 $240.000 $120.000
Totals: $655,173.40 $733,162.18 $746,770.22 $789,453.70 $876,419.80 $945,678.00 $951,052.35 $1,037,037.00 $1,143,015.67 $1,218,207.10