LIMESTONE CR (0909-40-074)

Items: 53

County: LIMESTONE
Length: N/A
Highway: CR
District: WACO
Control Number: 0909-40-074
DBE Goal: N/A
Project: BR 2016(445)
Guaranty: N/A
Time: 192 WORKING DAYS
Engineer's Estimate: $1,125,232.50
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: REHAB BR & APPRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,125,232.50
$1,515,689.40
Over/Under Est: 34.7% $390,456.90
Over/Under Est: 34.94% $393,138.73
Amt Left: 0.18% $2,681.83
Over/Under Est: 43.43% $488,634.60
Amt Left: 6.48% $98,177.70
Delta: -6.29% -$95,495.87
Over/Under Est: 46.27% $520,696.00
Amt Left: 8.59% $130,239.10
Delta: -1.99% -$32,061.40
Over/Under Est: 124.31% $1,398,767.50
Amt Left: 66.52% $1,008,310.60
Delta: -53.35% -$878,071.50

Bid Items & Bid Tabulations

53 Total 0 of 53
LIMESTONE  |  CR  |  WACO  |  0909-40-074  |  06/06/2018  |  $1,125,232.50  |  BR 2016(445)  |  REHAB BR & APPRS  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELLIS-MCGINNIS CONSTRUCTION CO.
JAMES CONSTRUCTION GROUP, L.L.C.
KNIFE RIVER CORPORATION - SOUTH
HODGES AND SON CONSTRUCTION COMPANY, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 5.900 $1,500.000 $14,000.000 $16,300.000 $4,000.000 $12,000.000 $45,000.000
REMOVING CONC (PAV)
SY 286.000 $10.000 $10.000 $9.990 $12.000 $15.000 $9.570
REMOVING STAB BASE & ASPH PAV (0-6")
SY 300.000 $3.500 $4.000 $6.050 $4.000 $15.000 $9.500
EXCAVATION (ROADWAY)
CY 21.000 $25.000 $12.000 $20.000 $150.000 $40.000 $57.020
EXCAVATION (CHANNEL)
CY 240.000 $10.000 $12.000 $20.000 $25.000 $30.000 $57.020
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 152.000 $20.000 $18.000 $65.000 $27.000 $30.000 $57.020
FURNISHING AND PLACING TOPSOIL (4")
SY 2,964.000 $1.500 $2.100 $1.300 $0.750 $3.000 $6.350
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,964.000 $0.400 $0.400 $0.340 $0.500 $0.500 $7.410
BROADCAST SEED (TEMP) (WARM)
SY 1,482.000 $0.350 $0.500 $0.500 $0.650 $0.500 $0.010
BROADCAST SEED (TEMP) (COOL)
SY 1,482.000 $0.350 $0.500 $0.500 $0.650 $0.500 $0.010
VEGETATIVE WATERING
MG 48.000 $50.000 $1.000 $28.750 $40.000 $1.000 $321.420
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 1,018.000 $1.500 $1.000 $1.000 $1.500 $5.000 $2.500
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 128.000 $60.000 $75.000 $102.590 $80.000 $80.000 $129.440
PRIME COAT(MC-30 OR AE-P)
GAL 153.000 $10.000 $17.000 $11.640 $15.000 $10.000 $15.000
ASPH (CRS-2)
GAL 727.000 $6.000 $17.000 $11.640 $6.000 $10.000 $13.500
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 16.000 $400.000 $260.000 $323.410 $485.000 $600.000 $495.000
CEM STABIL BKFL
CY 17.000 $150.000 $240.000 $286.930 $220.000 $300.000 $403.240
DRILL SHAFT (24 IN)
LF 612.000 $100.000 $190.000 $97.110 $150.000 $110.000 $137.780
CL C CONC (ABUT)
CY 15.000 $1,000.000 $1,640.000 $1,035.280 $1,500.000 $1,200.000 $2,250.000
CL C CONC (CAP)
CY 24.000 $1,200.000 $1,490.000 $1,635.050 $1,900.000 $1,400.000 $2,000.000
CL C CONC (CAP)(EXTEND)
CY 4.100 $900.000 $7,000.000 $7,342.970 $3,300.000 $4,000.000 $5,000.000
CL C CONC (COLUMN)
CY 25.900 $1,000.000 $1,500.000 $1,610.340 $1,500.000 $1,100.000 $2,500.000
REINF CONC SLAB
SF 1,148.000 $18.000 $40.000 $45.620 $75.000 $28.000 $100.000
REINF CONC SLAB (SLAB BEAM)
SF 3,906.000 $15.000 $15.100 $17.560 $22.000 $22.000 $50.000
PRESTR CONC SLAB BEAM (4SB12)
LF 423.000 $180.000 $150.000 $179.400 $190.000 $180.000 $350.000
PRESTR CONC SLAB BEAM (5SB12)
LF 423.000 $180.000 $150.000 $179.400 $190.000 $180.000 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,086.000 $80.000 $85.000 $95.170 $82.000 $95.000 $150.000
STR STEEL (SHEAR CONNECTOR)
LB 85.000 $10.000 $1.000 $8.550 $28.000 $60.000 $10.400
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $150,000.000 $305,000.000 $284,000.000 $365,000.000 $360,000.000 $325,744.020
RAIL (TY T66)
LF 454.000 $110.000 $140.000 $142.470 $177.000 $120.000 $180.000
(TRUSS)(STEEL)
LF 143.500 $145.000 $280.000 $219.200 $225.000 $275.000 $150.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $24,000.000 $50,000.000 $57,000.000 $22,000.000 $25,000.000 $65,000.000
REMOV STR (ABUTMENT)
EA 2.000 $4,000.000 $8,000.000 $6,000.000 $5,500.000 $8,000.000 $25,000.000
REMOV STR (BENT)
EA 7.000 $4,000.000 $3,200.000 $4,550.000 $3,300.000 $6,000.000 $7,000.000
MOBILIZATION
LS 1.000 $100,000.000 $143,500.000 $150,000.000 $160,000.000 $145,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $1,000.000 $340.000 $4,900.000 $950.000 $2,000.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 85.000 $30.000 $30.000 $37.560 $33.000 $10.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 85.000 $8.000 $10.000 $18.180 $11.000 $10.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 862.000 $3.000 $3.500 $4.110 $5.000 $2.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 862.000 $1.000 $1.400 $1.680 $1.000 $1.000 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $21.000 $22.000 $23.000 $24.000 $25.000 $24.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $750.000 $975.000 $1,175.000 $1,000.000 $800.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $2,375.000 $2,500.000 $2,500.000 $2,600.000 $2,500.000
WIRE FENCE (TY C)
LF 218.000 $15.000 $10.000 $15.000 $16.000 $20.000 $15.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $400.000 $375.000 $450.000 $550.000 $600.000 $550.000
REMOVE SM RD SN SUP&AM
EA 5.000 $100.000 $30.000 $65.000 $50.000 $100.000 $135.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $20.000 $22.000 $25.000 $24.000 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $30.000 $42.000 $50.000 $46.000 $50.000 $45.000
REP STL BRIDGE MEMBER (TRUSS VERTICAL)
EA 14.000 $4,200.000 $4,000.000 $1,400.000 $2,000.000 $6,000.000 $4,900.000
REP STL BRIDGE MEMBER (FLOORBEAM)
EA 2.000 $5,500.000 $9,300.000 $6,500.000 $4,450.000 $8,000.000 $7,600.000
REP STL BRIDGE MEMBER (GUSSET PLATES)
EA 20.000 $1,500.000 $1,900.000 $1,200.000 $275.000 $4,000.000 $2,700.000
RELOCATE EXIST TRUSS BRIDGE
LS 1.000 $100,000.000 $23,000.000 $30,000.000 $120,000.000 $50,000.000 $100,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $120.000 $190.000 $115.000 $75.000 $85.000 $140.000
Totals: $1,125,232.500 $1,515,689.400 $1,518,371.243 $1,613,867.100 $1,645,928.500 $2,524,000.000