Show Job Controls
Bid Cobra

LIBERTY SH0321 (6384-22-001)

Items: 36

County: LIBERTY
Length: N/A
Highway: SH0321
District: BEAUMONT
Control Number: 6384-22-001
DBE Goal: N/A
Project: RMC - 638422001
Guaranty: N/A
Time: 30 W
Engineer's Estimate: $489,661.14
Date: 12/02/2021 (4 years ago)
Contract Number: N/A
Type: ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$489,661.14
$579,599.80
Over/Under Est: 18.37% $89,938.66

Bid Items & Bid Tabulations

36 Total 0 of 36
LIBERTY  |  SH0321  |  BEAUMONT  |  6384-22-001  |  12/02/2021  |  $489,661.14  |  RMC - 638422001  |  ACP OVERLAY  |  30 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY A)
STA 44.000 $200.000 $750.000
D-GR HMA(SQ) TY-D SAC-A PG76-22
TON 37.000 $100.000 $135.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $57.910 $73.000
PLANE CONC PAV(0" TO 1")
SY 444.000 $20.000 $19.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,956.000 $3.530 $7.000
MOBILIZATION
LS 1.000 $96,000.000 $35,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $6,500.000 $5,300.000
DRIVEWAYS (CONC)
SY 152.000 $88.800 $190.000
DRIVEWAYS (ACP)
SY 658.000 $32.390 $32.000
RUMBLE STRIPS (SHOULDER)
LF 6,156.000 $0.140 $0.750
RUMBLE STRIPS (CENTERLINE)
LF 1,837.000 $0.180 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $20.840 $26.500
MTL THRIE-BEAM GD FEN (TIM POST)
LF 2.000 $64.650 $850.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,584.240 $2,150.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $6.500 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,600.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $150.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 4.000 $10.000 $32.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 4.000 $10.000 $32.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 24.000 $0.350 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,413.000 $0.500 $1.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 132.000 $1.960 $3.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 400.000 $0.390 $2.000
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 320.000 $0.390 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 10,080.000 $0.380 $0.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 24.000 $10.580 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $162.560 $255.000
REFL PAV MRKR TY I-C
EA 10.000 $5.000 $5.000
REFL PAV MRKR TY II-A-A
EA 83.000 $3.240 $5.000
CRACK CLEANING AND SEALING (JCP)
LF 180.000 $10.000 $7.000
SP MIXES SP-D SAC-A PG76-22
TON 2,181.000 $99.000 $135.000
TACK COAT
GAL 1,851.000 $3.200 $3.300
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $96.750 $85.000
TMA (STATIONARY)
DAY 30.000 $175.060 $200.000
TMA (MOBILE OPERATION)
DAY 2.000 $500.000 $500.000
Totals: $489,661.140 $579,599.800