LIBERTY FM 1413 (1421-01-027)

Items: 67

County: LIBERTY
Length: 7.7890 MILES (6.5428 MILES)
Highway: FM 1413
District: BEAUMONT
Control Number: 1421-01-027
DBE Goal: 0.0%
Project: STP 2026(498)MM
Guaranty: $100,000.00
Time: 169 WORKING DAYS
Engineer's Estimate: $6,892,326.85
Date: 07/02/2026 1:00 PM CDT (16 days ago)
Contract Number: 7263240
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00180186
Contract Type: FEDERAL
Project Description: FM 1413-2020 HSIP (SAFETY TREAT FIXED OBJECTS, MILLED EDGELINE RUMBLE STRIPS)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERTO RODRIGUEZ
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,892,326.85
Over/Under Est: -17.91% -$1,234,555.57
Over/Under Est: -17.83% -$1,228,880.02
Amt Left: 0.1% $5,675.55
$6,800,527.54
Over/Under Est: -1.33% -$91,799.31
Amt Left: 20.2% $1,142,756.26
Delta: -20.08% -$1,137,080.71

Bid Items & Bid Tabulations

67 Total 0 of 67
LIBERTY  |  FM 1413  |  BEAUMONT  |  1421-01-027  |  07/02/2026 1:00 PM CDT  |  $6,892,326.85  |  STP 2026(498)MM  |  HAZARD ELIM & SAFETY  |  169 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
HAYDEN PAVING, INC.
PREPARING ROW
STA 120.000 $4,800.000 $600.000 $435.000 $1,050.000
REMOV CONC (MOWSTRIP)
SY 256.000 $25.000 $27.000 $20.500 $54.000
SUBGR WIDEN (OC)
SY 140.000 $15.000 $65.000 $44.000 $66.000
BACKFILL (TY A OR B)
STA 289.000 $300.000 $250.000 $528.000 $405.000
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 25,605.000 $1.000 $0.400 $0.400 $0.500
VEGETATIVE WATERING
TGL 215.000 $20.000 $35.000 $65.000 $60.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 34,518.000 $5.600 $3.300 $4.500 $5.000
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 738.000 $225.000 $220.000 $234.000 $344.000
D-GR HMA TY-B PG64-22
TON 62.000 $195.000 $130.000 $376.000 $355.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 6,718.000 $133.000 $124.000 $131.000 $139.000
TACK COAT
GAL 4,885.000 $5.000 $3.750 $4.000 $4.000
SP MIXES SP-C SAC-A PG76-22
TON 10,548.000 $160.000 $144.000 $145.000 $203.000
TACK COAT
GAL 5,753.000 $5.100 $3.750 $4.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 7,380.000 $75.000 $80.000 $77.500 $108.000
PLANE ASPH CONC PAV(0" TO 2")
SY 6,094.000 $8.000 $10.000 $6.850 $2.300
RIPRAP (MOW STRIP)(4 IN)
CY 973.000 $530.000 $700.000 $479.000 $530.000
RC PIPE (CL III)(18 IN)
LF 100.000 $200.000 $167.000 $120.000 $195.000
RC PIPE (CL III)(24 IN)
LF 64.000 $200.000 $170.000 $174.000 $300.000
RC PIPE (CL III)(30 IN)
LF 102.000 $350.000 $180.000 $174.000 $311.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,400.000 $1,450.000 $1,360.000 $1,450.000
SET (TY II) (21 IN) (RCP) (6: 1) (P)
EA 2.000 $7,000.000 $2,500.000 $2,610.000 $2,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $2,100.000 $2,700.000 $1,950.000 $1,800.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,600.000 $3,500.000 $3,100.000 $2,500.000
REMOV STR (PIPE)
EA 8.000 $20.000 $2,200.000 $1,195.000 $1,000.000
MOBILIZATION
LS 1.000 $350,000.000 $142,000.000 $225,000.000 $85,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $6,000.000 $1,350.000 $5,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,000.000 $18,590.000 $65.000
TMA (STATIONARY)
DAY 120.000 $600.000 $300.000 $350.000 $350.000
TMA (MOBILE OPERATION)
DAY 50.000 $700.000 $200.000 $626.000 $520.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $0.200 $6.000 $5.450 $9.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $0.200 $2.000 $1.100 $4.600
DRIVEWAYS (BASE)
SY 774.000 $18.000 $25.000 $41.000 $37.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 2,552.000 $22.000 $26.000 $44.000 $31.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 54,546.000 $0.750 $0.230 $0.110 $0.120
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 25,781.000 $0.750 $0.300 $0.110 $0.120
MTL W-BEAM GD FEN (TIM POST)
LF 22,175.000 $28.000 $28.000 $22.850 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,800.000 $1,400.000 $8,960.000 $10,508.000
GUARDRAIL END TREATMENT (INSTALL)
EA 23.000 $3,200.000 $3,750.000 $6,120.000 $7,181.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $357.000 $300.000 $2,700.000 $3,130.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 21.000 $300.000 $310.000 $299.000 $436.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $250.000 $330.000 $299.000 $436.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 6.000 $800.000 $700.000 $647.000 $1,117.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 89.000 $1,100.000 $650.000 $647.000 $1,032.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $800.000 $799.000 $1,013.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $900.000 $1,000.000 $951.000 $1,274.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $1,350.000 $1,400.000 $1,235.000 $1,689.000
REMOVE SM RD SN SUP&AM
EA 95.000 $155.000 $105.000 $103.000 $191.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 1,117.000 $20.000 $22.000 $41.000 $44.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 57,610.000 $0.300 $0.300 $0.280 $0.330
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 103.000 $18.000 $7.000 $5.500 $6.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 4.000 $400.000 $135.000 $130.500 $138.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 2.000 $700.000 $300.000 $278.000 $290.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 2.000 $500.000 $95.000 $93.000 $97.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 6.000 $0.500 $40.000 $27.000 $29.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 5,400.000 $0.500 $0.300 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 18,360.000 $0.600 $0.300 $0.280 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,516.000 $1.000 $2.500 $0.710 $0.800
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 57,610.000 $0.450 $0.600 $0.600 $0.650
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 5,400.000 $0.600 $0.600 $0.600 $0.650
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 18,360.000 $0.500 $0.600 $0.600 $0.650
PREFAB PM TY C (W)(24")(SLD)
LF 103.000 $28.000 $22.000 $21.750 $23.000
PREFAB PM TY C (W)(DBL ARROW)
EA 4.000 $400.000 $500.000 $489.000 $515.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $500.000 $350.000 $353.000 $370.000
PREFAB PM TY C (W)(RR XING)
EA 2.000 $700.000 $700.000 $707.000 $800.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 6.000 $80.000 $60.000 $60.000 $65.000
REFL PAV MRKR TY II-A-A
EA 527.000 $3.000 $6.500 $6.500 $7.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 252.000 $1,200.000 $20.000 $13.000 $30.000
Totals: $6,892,326.850 $5,657,771.280 $5,663,446.830 $6,800,527.540
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00