LIBERTY CR (0920-02-091)

Items: 50

County: LIBERTY
Length: N/A
Highway: CR
District: BEAUMONT
Control Number: 0920-02-091
DBE Goal: N/A
Project: BR 2020(868)
Guaranty: N/A
Time: 86 WORKING DAYS
Engineer's Estimate: $750,219.41
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$750,219.41
$777,585.70
Over/Under Est: 3.65% $27,366.29
Over/Under Est: 12.71% $95,380.90
Amt Left: 8.75% $68,014.61
Over/Under Est: 13.01% $97,602.27
Amt Left: 9.03% $70,235.98
Delta: -0.26% -$2,221.37
Over/Under Est: 31.74% $238,103.34
Amt Left: 27.1% $210,737.05
Delta: -16.57% -$140,501.07
Over/Under Est: 34.15% $256,211.59
Amt Left: 29.43% $228,845.30
Delta: -1.83% -$18,108.25

Bid Items & Bid Tabulations

50 Total 0 of 50
LIBERTY  |  CR  |  BEAUMONT  |  0920-02-091  |  08/05/2020  |  $750,219.41  |  BR 2020(868)  |  BRIDGE  |  86 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
HARPER BROTHERS CONSTRUCTION LLC
ISI CONTRACTING, INC.
TRIPLE B SERVICES LLP
ARANDA BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW
STA 3.700 $2,000.000 $7,500.000 $3,125.000 $7,000.000 $13,700.000 $19,500.000
REMOVING STAB BASE & ASPH PAV (8")
SY 392.000 $4.000 $18.000 $5.000 $16.000 $16.000 $5.000
EXCAVATION (ROADWAY)
CY 29.000 $10.000 $54.000 $10.000 $28.000 $42.000 $10.000
EXCAVATION (CHANNEL)
CY 10.000 $30.000 $88.000 $10.000 $18.000 $115.000 $30.000
SUBGRADE WIDENING (DENS CONT)
STA 3.700 $4,680.000 $660.000 $3,000.000 $500.000 $655.000 $12,500.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 155.000 $32.000 $58.000 $12.500 $22.000 $115.000 $35.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 737.000 $0.350 $2.550 $1.630 $0.230 $4.500 $4.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 369.000 $0.300 $3.050 $3.250 $0.280 $8.650 $5.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 369.000 $0.300 $3.050 $3.250 $0.300 $8.650 $4.000
VEGETATIVE WATERING
MG 12.400 $16.000 $72.000 $25.000 $14.000 $20.000 $50.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(7")
SY 701.000 $25.000 $22.000 $35.000 $29.000 $37.000 $35.000
PRIME COAT (AE-P)
GAL 140.200 $9.000 $10.000 $5.000 $11.000 $6.500 $10.000
D-GR HMA(SQ) TY-D SAC-A PG64-22
TON 78.000 $300.000 $215.000 $75.000 $260.000 $440.000 $250.000
TACK COAT
GAL 70.100 $7.000 $7.000 $2.500 $6.500 $6.500 $10.000
CEM STABIL BKFL
CY 43.600 $150.000 $206.000 $140.000 $45.000 $46.500 $85.000
SHEET PILING (PZ - 35)
SF 2,181.000 $75.000 $51.000 $80.000 $17.000 $77.000 $67.000
PRESTR CONC PIL (16 IN SQ)
LF 492.000 $200.000 $128.000 $130.000 $185.000 $155.000 $110.000
CL C CONC (ABUT)
CY 30.800 $1,000.000 $1,200.000 $1,685.000 $1,200.000 $1,640.000 $1,150.000
CL C CONC (COPING)
CY 8.400 $450.000 $2,000.000 $2,800.000 $2,100.000 $2,330.000 $950.000
REINF CONC SLAB
SF 1,950.000 $20.000 $33.000 $40.000 $28.000 $65.000 $16.850
APPROACH SLAB
CY 38.500 $460.000 $618.000 $685.000 $780.000 $965.000 $475.000
PRESTR CONC GIRDER (TX28)
LF 298.000 $175.000 $188.000 $210.000 $230.000 $220.000 $225.000
RIPRAP (CONC)(4 IN)
CY 9.200 $500.000 $1,500.000 $600.000 $425.000 $890.000 $405.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 377.000 $200.000 $160.000 $251.250 $260.000 $110.000 $385.000
RIPRAP (MOW STRIP)(4 IN)
CY 29.000 $400.000 $560.000 $600.000 $715.000 $805.000 $550.000
RAIL (TY T223)
LF 182.000 $110.000 $180.000 $165.000 $86.000 $435.000 $190.000
TYPE A JOINT
LF 52.000 $40.000 $36.000 $85.000 $55.000 $20.000 $125.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 1.000 $1,100.000 $5,400.000 $2,400.000 $307.000 $3,210.000 $3,540.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $37,000.000 $35,000.000 $125,000.000 $27,500.000 $75,000.000
REMOV STR (TIMBER PILING)
EA 12.000 $250.000 $566.000 $800.000 $2,100.000 $26.600 $750.000
MOBILIZATION
LS 1.000 $70,196.310 $76,000.000 $30,000.000 $85,000.000 $25,835.000 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $2,000.000 $1,800.000 $2,825.000 $1,300.000 $1,140.000 $5,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 129.000 $35.000 $33.000 $50.000 $31.000 $120.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 129.000 $8.500 $8.500 $10.000 $9.000 $37.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $25.000 $47.000 $35.000 $22.000 $42.000 $37.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $10.000 $8.000 $10.000 $7.000 $26.500 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 686.000 $3.250 $3.500 $2.500 $4.000 $3.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 686.000 $1.100 $1.050 $1.000 $2.500 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $30.000 $28.500 $28.250 $31.000 $46.500 $35.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,175.000 $1,155.000 $1,150.000 $1,300.000 $1,165.000 $35.000
SHORT RADIUS
LF 50.000 $40.000 $51.000 $35.500 $38.000 $53.250 $85.000
REMOVE METAL BEAM GUARD FENCE
LF 61.000 $3.250 $2.550 $10.000 $2.700 $6.500 $10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $2,550.000 $2,600.000 $3,000.000 $3,350.000 $3,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $525.000 $540.000 $510.000 $625.000 $740.000 $450.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $530.000 $400.000 $405.000 $465.000 $550.000 $350.000
REMOVE SM RD SN SUP&AM
EA 5.000 $105.000 $76.000 $100.000 $84.000 $100.000 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $19.000 $15.500 $25.000 $23.000 $26.500 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 12.000 $18.000 $15.500 $20.000 $31.000 $37.250 $50.000
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 86.000 $60.000 $0.000 $0.000 $36.000 $0.000 $0.000
1
CMP (GAL STL 24 IN)
LF 86.000 $60.000 $55.000 $95.000 $0.000 $90.000 $150.000
Totals: $755,379.410 $777,585.700 $845,600.310 $847,821.680 $988,322.750 $1,006,431.000