Job Info for 0601-04-013

County: LIBERTY Highway: FM 1009 Date: 08/01/2024 (3 months ago) Engineer's Estimate: $3,734,209 Control Number: 0601-04-013
Project: C 601-4-13 District: BEAUMONT Time: 90 WORKING DAYS Type: SURFACING/ROADWAY RESTORATION
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,734,209.20
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC   $3,702,741.54 1
-0.84% | -$31,467.66
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $3,736,503.25 2
0.06% | $2,294.05
0.91% | $33,761.71
TEXAS MATERIALS GROUP, INC.   $4,089,091.56 3
9.5% | $354,882.36
10.43% | $386,350.02
9.44% | $352,588.31
ICON GC, LLC   $5,299,999.97 4
41.93% | $1,565,790.77
43.14% | $1,597,258.43
29.61% | $1,210,908.41
FNH CONSTRUCTION, LLC   $5,578,508.50 5
49.39% | $1,844,299.30
50.66% | $1,875,766.96
5.25% | $278,508.53

Bid Items

Items: 52, 0 filtered
LIBERTY FM 1009  |  BEAUMONT  |  0601-04-013  |  08/01/2024  |  $3,734,209  |  C 601-4-13  |  SURF/ROADWAY RESTOR  |  90 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. TEXAS MATERIALS GROUP, INC. ICON GC, LLC FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 30.620 $1,500.000 $1,023.120 $1,200.000 $1,020.000 $18,947.830 $11,000.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 277.360 $410.000 $254.050 $400.000 $285.000 $2,020.720 $450.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 114.000 $35.000 $68.510 $55.000 $150.000 $24.120 $50.000
134 6004 BACKFILL (TY A OR B) STA 277.360 $230.000 $229.620 $300.000 $154.000 $140.820 $250.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 15,545.000 $0.150 $0.150 $0.150 $0.150 $0.240 $2.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 15,545.000 $0.150 $0.150 $0.150 $0.150 $0.240 $2.000
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 31,090.000 $0.150 $0.370 $0.370 $0.400 $0.890 $2.000
168 6001 VEGETATIVE WATERING MG 261.000 $26.000 $37.550 $10.000 $17.600 $0.010 $50.000
316 6017 ASPH (AC-20-5TR) GAL 3,698.000 $3.500 $4.530 $9.000 $4.500 $5.940 $10.000
316 6404 AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A) CY 88.000 $175.000 $243.560 $290.000 $360.000 $398.000 $500.000
351 6003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(7") SY 1,000.000 $80.000 $71.930 $75.000 $80.000 $71.280 $90.000
354 6037 PLANE CONC PAV(0" TO 2") SY 1,453.000 $11.000 $16.160 $3.000 $4.700 $6.240 $20.000
400 6005 CEM STABIL BKFL CY 42.000 $185.000 $285.000 $265.000 $290.000 $111.310 $350.000
400 6006 CUT & RESTORING PAV SY 51.000 $150.000 $300.000 $285.000 $305.000 $142.090 $200.000
400 6012 CUT AND RESTORE PAV (FLEX BASE) SY 98.000 $125.000 $100.000 $85.000 $105.000 $41.160 $100.000
464 6002 RC PIPE (CL III)(15 IN) LF 8.000 $95.000 $60.000 $52.000 $61.000 $89.080 $85.000
464 6003 RC PIPE (CL III)(18 IN) LF 380.000 $85.000 $70.000 $68.000 $71.000 $100.880 $95.000
464 6005 RC PIPE (CL III)(24 IN) LF 568.000 $110.000 $150.000 $150.000 $152.000 $124.710 $120.000
464 6008 RC PIPE (CL III)(36 IN) LF 32.000 $165.000 $300.000 $300.000 $315.000 $211.260 $165.000
464 6010 RC PIPE (CL III)(48 IN) LF 192.000 $310.000 $400.000 $400.000 $415.000 $319.950 $250.000
466 6094 HEADWALL (CH - PW - 0) (DIA= 15 IN) EA 2.000 $3,800.000 $3,500.000 $3,000.000 $3,600.000 $2,821.460 $3,500.000
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 17.000 $6,420.000 $6,000.000 $6,000.000 $6,050.000 $11,164.130 $4,500.000
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 2.000 $10,000.000 $11,000.000 $11,000.000 $11,200.000 $17,553.940 $5,500.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 40.000 $1,600.000 $1,000.000 $1,000.000 $1,050.000 $1,713.820 $1,850.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 2.000 $1,500.000 $2,000.000 $2,000.000 $2,050.000 $1,351.220 $2,500.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 14.000 $1,500.000 $2,500.000 $2,500.000 $2,550.000 $2,465.040 $2,500.000
467 6480 SET (TY II) (48 IN) (RCP) (6: 1) (P) EA 4.000 $6,300.000 $7,500.000 $7,500.000 $7,600.000 $9,632.110 $10,000.000
496 6007 REMOV STR (PIPE) LF 944.000 $15.000 $60.000 $50.000 $61.000 $15.007 $50.000
500 6001 MOBILIZATION LS 1.000 $337,837.000 $356,799.240 $165,000.000 $265,000.000 $308,968.760 $500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,000.000 $17,658.040 $4,000.000 $2,000.000 $1,900.920 $8,500.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 200.000 $6.500 $9.210 $9.500 $7.600 $5.940 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 200.000 $2.500 $2.700 $3.000 $2.550 $1.190 $9.000
530 6005 DRIVEWAYS (ACP) SY 326.000 $36.000 $122.580 $95.000 $50.000 $160.390 $45.000
530 6016 DRIVEWAYS (BASE) SY 982.000 $40.000 $42.260 $50.000 $33.000 $37.800 $35.000
533 6002 RUMBLE STRIPS (CENTERLINE) LF 27,736.000 $0.550 $0.110 $0.150 $0.110 $0.600 $0.500
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 40.000 $520.000 $600.000 $666.000 $455.000 $594.040 $1,500.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $620.000 $660.000 $790.000 $565.000 $731.860 $1,500.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $780.000 $725.000 $815.000 $730.000 $861.350 $1,500.000
644 6076 REMOVE SM RD SN SUP&AM EA 45.000 $89.000 $100.000 $130.000 $77.000 $196.030 $600.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 22.000 $10.000 $65.000 $125.000 $77.000 $130.690 $100.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 2,424.000 $3.000 $1.680 $1.000 $1.100 $2.380 $6.000
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 5,660.000 $1.000 $0.940 $0.750 $0.800 $1.430 $3.000
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 18,454.000 $1.000 $0.980 $0.750 $0.800 $1.190 $3.000
666 6445 RE PROF PM (W)6"(SLD) RAISD PROF ONLY LF 55,217.000 $1.000 $0.500 $0.450 $0.480 $0.910 $1.500
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 10.000 $100.000 $22.000 $25.000 $25.000 $38.020 $20.000
672 6009 REFL PAV MRKR TY II-A-A EA 662.000 $5.000 $7.000 $6.000 $6.100 $5.640 $6.000
3076 6001 D-GR HMA TY-B PG64-22 TON 7,119.000 $130.000 $112.060 $129.700 $160.000 $130.000 $165.000
3076 6032 D-GR HMA TY-C SAC-A PG76-22 TON 10,478.000 $130.000 $124.320 $140.000 $150.000 $170.000 $190.000
3076 6066 TACK COAT GAL 9,492.000 $4.500 $6.020 $3.800 $5.500 $5.350 $10.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $9,800.000 $3,000.000 $10,000.000 $7,000.000 $11,405.510 $18,500.000
6185 6002 TMA (STATIONARY) DAY 70.000 $200.000 $347.880 $150.000 $350.000 $238.800 $250.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $360.000 $337.510 $150.000 $350.000 $386.120 $550.000
Totals: $3,734,209.20 $3,702,741.56 $3,736,503.25 $4,089,091.56 $5,300,000.00 $5,578,508.50