LEON US 79 (0205-05-048)

Items: 77

County: LEON
Length: N/A
Highway: US 79
District: BRYAN
Control Number: 0205-05-048
DBE Goal: N/A
Project: NH 2017(758)
Guaranty: N/A
Time: 190 WORKING DAYS
Engineer's Estimate: $4,080,855.44
Date: 02/02/2017 (9 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,080,855.44
$2,951,399.98
Over/Under Est: -27.68% -$1,129,455.46
Over/Under Est: -16.22% -$661,785.37
Amt Left: 15.85% $467,670.09
Over/Under Est: -1.06% -$43,348.00
Amt Left: 36.8% $1,086,107.46
Delta: -18.09% -$618,437.37

Bid Items & Bid Tabulations

77 Total 0 of 77
LEON  |  US 79  |  BRYAN  |  0205-05-048  |  02/02/2017  |  $4,080,855.44  |  NH 2017(758)  |  OVERLAY  |  190 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
OLDCASTLE MATERIALS TEXAS, INC.
REMOVING CONC (MEDIANS)
SY 78.000 $15.000 $25.000 $63.000 $41.500
REMOVING CONC (CURB)
LF 230.000 $9.600 $15.000 $20.500 $15.350
BACKFILL (TY A OR B)
STA 366.000 $200.000 $100.000 $277.500 $318.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 1,430.000 $3.500 $3.500 $3.000 $3.950
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 30.000 $87.000 $300.000 $251.000 $369.150
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 35.000 $100.000 $250.000 $211.000 $132.500
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 20,272.000 $106.000 $73.000 $74.500 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 1,800.000 $105.000 $80.000 $84.500 $105.000
PLANE ASPH CONC PAV(0" TO 2")
SY 4,918.000 $4.500 $2.830 $3.500 $5.500
PLANE ASPH CONC PAV (2 1/2")
SY 7,760.000 $1.800 $2.830 $1.000 $2.750
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 1,222.000 $9.000 $2.830 $5.000 $2.750
PLANE ASPH CONC PAV (2" TO 2.5")
SY 956.000 $5.000 $2.830 $6.000 $2.750
CL C CONC (RAC-R)
CY 3.200 $1,600.000 $2,500.000 $3,600.000 $1,200.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 3.000 $150.000 $500.000 $4,125.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 4.800 $500.000 $750.000 $557.750 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 327.500 $470.000 $500.000 $485.250 $650.000
RETROFIT RAIL (TY SSTR)
LF 2,328.000 $190.000 $110.000 $168.000 $153.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 2.000 $5,300.000 $5,000.000 $8,820.000 $6,500.000
SET (TY I)(S=3 FT)(HW= 6 FT)(3:1)(C)
EA 2.000 $8,000.000 $10,000.000 $12,567.000 $10,000.000
REMOV STR (WINGWALL)
EA 4.000 $1,100.000 $1,000.000 $1,140.000 $1,600.000
REMOVE STR (RAIL)
LF 127.000 $18.000 $50.000 $50.000 $22.000
MOBILIZATION
LS 1.000 $380,000.000 $200,000.000 $297,635.000 $398,290.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $2,500.000 $12,207.000 $24,175.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $32.000 $30.000 $36.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $9.500 $5.000 $10.250 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,443.000 $2.600 $3.000 $2.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,443.000 $0.700 $0.500 $1.000 $1.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 900.000 $50.000 $55.000 $21.000 $47.100
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 2,460.000 $12.000 $10.000 $6.250 $9.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 900.000 $12.000 $10.000 $12.250 $7.950
INTERSECTIONS (ACP)
SY 143.000 $6.500 $17.000 $13.000 $31.900
DRIVEWAYS (ACP)
SY 2,264.000 $6.500 $17.000 $33.000 $23.400
RUMBLE STRIPS (SHOULDER)
LF 35,715.000 $0.150 $0.200 $0.200 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 15,613.000 $0.180 $0.200 $0.200 $0.140
MTL W-BEAM GD FEN (TIM POST)
LF 3,462.500 $21.000 $18.000 $21.500 $22.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,550.000 $1,750.000 $1,494.000 $1,529.400
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,245.000 $700.000 $1,288.000 $1,318.450
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $29.000 $22.000 $24.750 $25.350
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $450.000 $500.000 $799.000 $817.450
REMOVE METAL BEAM GUARD FENCE
LF 3,187.500 $3.000 $6.000 $3.500 $3.400
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $230.000 $150.000 $123.750 $126.600
GUARDRAIL END TREATMENT (INSTALL)
EA 32.000 $2,200.000 $2,100.000 $2,057.500 $2,135.850
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $250.000 $200.000 $227.000 $232.050
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,250.000 $8,000.000 $4,639.000 $17,199.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,900.000 $1,500.000 $1,031.000 $1,018.350
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $760.000 $1,250.000 $516.000 $679.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 35.000 $15.000 $20.000 $25.750 $26.400
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 24.000 $14.000 $20.000 $25.750 $26.400
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 6.000 $22.000 $20.000 $25.750 $26.400
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 51.000 $21.000 $20.000 $25.750 $26.400
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 34.000 $23.000 $20.000 $25.750 $26.400
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 6.000 $28.000 $20.000 $25.750 $26.400
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 15.000 $42.000 $20.000 $67.000 $68.600
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $25.000 $20.000 $14.000 $10.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,678.000 $0.250 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 6,742.000 $0.250 $0.200 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 42,072.000 $0.250 $0.100 $0.100 $0.120
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,000.000 $0.450 $1.000 $1.000 $0.910
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,640.000 $0.450 $1.000 $1.000 $0.910
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 859.000 $1.250 $1.000 $1.000 $1.060
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,940.000 $1.250 $1.000 $1.000 $1.060
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 927.000 $0.880 $1.000 $0.750 $0.850
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 132.000 $3.090 $3.000 $3.000 $3.260
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 339.000 $6.000 $6.000 $6.000 $6.520
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $105.000 $100.000 $103.000 $112.210
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,678.000 $0.350 $0.330 $0.350 $0.380
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 66,890.000 $0.430 $0.300 $0.300 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,742.000 $0.400 $0.330 $0.350 $0.380
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 42,072.000 $0.480 $0.300 $0.300 $0.350
REFL PAV MRKR TY I-C
EA 8.000 $4.000 $5.000 $5.000 $5.620
REFL PAV MRKR TY II-A-A
EA 1,041.000 $2.700 $3.000 $3.000 $3.380
REFL PAV MRKR TY II-C-R
EA 143.000 $3.500 $3.000 $3.000 $3.380
MEMBRANE UNDERSEAL
GAL 25,443.000 $1.800 $0.000 $0.000 $0.000
TRACKLESS TACK COAT
GAL 220.000 $4.500 $0.000 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $10,000.000 $8,875.000 $28,000.000
1
MEMBRANE UNDERSEAL
GAL 550.000 $1.800 $5.000 $4.000 $4.130
1
TRACKLESS TACK COAT
GAL 10,177.000 $4.500 $5.000 $5.300 $4.070
Totals: $4,127,642.840 $2,951,399.980 $3,419,070.075 $4,037,507.440