Job Info for 0166-04-043

County: LEON Highway: SH 75 Date: 09/05/2019 (5 years ago) Engineer's Estimate: $2,780,999 Control Number: 0166-04-043
Project: STP 1902(154) District: BRYAN Time: 354 WORKING DAYS Type: CULVERT AND STORM DRAINAGE WORK

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,780,998.97
A. L. HELMCAMP, INC.   $3,722,168.95 1
33.84% | $941,169.98
KNIFE RIVER CORPORATION - SOUTH   $3,818,900.75 2
37.32% | $1,037,901.78
2.6% | $96,731.80
PIERCE R & B LLC   $4,397,592.25 3
58.13% | $1,616,593.28
18.15% | $675,423.30
15.15% | $578,691.50
FUSED INDUSTRIES, LLC   $4,781,262.60 4
71.93% | $2,000,263.63
28.45% | $1,059,093.65
8.72% | $383,670.35

Bid Items

Items: 79, 0 filtered
LEON SH 75  |  BRYAN  |  0166-04-043  |  09/05/2019  |  $2,780,999  |  STP 1902(154)  |  CULVERT AND STORM DRAINAGE WORK  |  354 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. L. HELMCAMP, INC. KNIFE RIVER CORPORATION - SOUTH PIERCE R & B LLC FUSED INDUSTRIES, LLC
100 6002 PREPARING ROW STA 8.000 $2,000.000 $7,500.000 $10,000.000 $6,000.000 $350.000
104 6019 REMOVING CONC (OTHER APPURTENANCES) SY 20.000 $500.000 $600.000 $125.000 $50.000 $350.000
104 6024 REMOVING CONC (RETAINING WALLS) SY 200.000 $100.000 $125.000 $49.000 $50.000 $165.000
105 6002 REMOVING STAB BASE AND ASPH PAV (2") SY 1,992.000 $6.000 $10.000 $5.250 $12.000 $8.000
110 6001 EXCAVATION (ROADWAY) CY 5,810.000 $8.000 $15.000 $18.000 $14.000 $23.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 565.000 $10.000 $55.000 $18.000 $27.000 $45.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 4,886.000 $0.750 $2.000 $1.500 $2.500 $5.000
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 4,886.000 $0.300 $0.600 $0.550 $0.530 $1.000
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 4,886.000 $0.300 $0.550 $0.500 $0.450 $1.000
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 4,886.000 $0.300 $0.550 $0.500 $0.450 $1.000
166 6001 FERTILIZER AC 1.000 $500.000 $750.000 $500.000 $875.000 $1,100.000
168 6001 VEGETATIVE WATERING MG 0.120 $12.000 $200.000 $200.000 $1,450.000 $8,500.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 2,155.000 $1.500 $1.700 $1.500 $2.000 $6.000
247 6061 FL BS (CMP IN PLC)(TYA GR1-2) (6") SY 2,640.000 $20.000 $25.000 $16.000 $20.000 $17.000
275 6001 CEMENT TON 38.000 $150.000 $225.000 $195.000 $225.000 $125.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 3,483.000 $2.500 $8.000 $4.500 $7.500 $11.000
316 6029 ASPH (RC-250) GAL 635.000 $4.100 $18.000 $7.000 $20.000 $45.000
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 211.000 $90.000 $85.000 $75.000 $400.000 $75.000
344 6031 SUPERPAVE MIXTURES SP-C SAC-A PG64-22 TON 420.000 $66.970 $150.000 $135.000 $250.000 $150.000
400 6005 CEM STABIL BKFL CY 230.000 $79.000 $180.000 $215.000 $200.000 $55.000
403 6001 TEMPORARY SPL SHORING SF 5,557.000 $30.000 $35.000 $35.500 $55.000 $45.000
416 6001 DRILL SHAFT (18 IN) LF 172.000 $51.500 $75.000 $90.000 $110.000 $239.000
416 6004 DRILL SHAFT (36 IN) LF 3,761.000 $167.000 $235.000 $235.000 $236.000 $397.000
420 6013 CL C CONC (ABUT) CY 74.000 $952.000 $1,250.000 $1,075.000 $1,300.000 $1,671.000
420 6074 CL C CONC (MISC) CY 154.100 $1,400.000 $1,500.000 $1,150.000 $1,650.000 $1,700.000
422 6001 REINF CONC SLAB SF 5,460.000 $22.000 $38.000 $28.000 $26.000 $32.000
422 6015 APPROACH SLAB CY 59.200 $450.000 $900.000 $665.000 $650.000 $750.000
423 6007 RETAINING WALL (DRILL SHAFT) (FACIA) SF 1,006.000 $33.000 $64.000 $215.000 $250.000 $70.000
425 6039 PRESTR CONC GIRDER (TX54) LF 906.680 $122.000 $160.000 $250.000 $224.000 $215.000
431 6001 PNEUMATICALLY PLACED CONC (ENCASEMENT) SF 4,117.000 $22.000 $13.000 $14.500 $15.000 $15.000
432 6001 RIPRAP (CONC)(4 IN) CY 1.600 $325.000 $2,500.000 $1,200.000 $2,500.000 $1,644.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 1,818.000 $98.000 $72.000 $101.000 $125.000 $223.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 19.000 $400.000 $700.000 $550.000 $550.000 $650.000
450 6006 RAIL (TY T223) LF 340.000 $105.000 $115.000 $125.000 $110.000 $315.000
454 6004 ARMOR JOINT (SEALED) LF 83.000 $120.000 $75.000 $95.000 $100.000 $97.000
464 6005 RC PIPE (CL III)(24 IN) LF 50.000 $100.000 $85.000 $97.000 $105.000 $130.000
467 6391 SET (TY II) (24 IN) (RCP) (4: 1) (P) EA 2.000 $1,400.000 $750.000 $1,600.000 $1,000.000 $1,875.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $1,500.000 $850.000 $1,750.000 $1,000.000 $1,600.000
496 6006 REMOV STR (HEADWALL) EA 1.000 $1,200.000 $6,000.000 $5,500.000 $6,000.000 $1,180.000
496 6008 REMOV STR (BOX CULVERT) LF 75.000 $60.000 $450.000 $275.000 $200.000 $200.000
500 6001 MOBILIZATION LS 1.000 $192,475.000 $350,000.000 $380,000.000 $439,000.000 $204,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 24.000 $6,000.000 $6,000.000 $2,250.000 $3,000.000 $4,400.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 265.000 $30.000 $32.000 $32.000 $35.000 $33.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 265.000 $7.000 $8.000 $9.000 $11.000 $9.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 66.000 $25.000 $10.000 $14.000 $33.000 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 66.000 $7.000 $4.000 $4.000 $11.000 $9.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,075.000 $2.750 $3.000 $5.200 $3.750 $2.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,075.000 $0.650 $0.750 $0.750 $1.000 $1.000
508 6001 CONSTRUCTING DETOURS SY 2,086.000 $45.000 $80.000 $75.000 $155.000 $50.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 24.000 $4,000.000 $3,200.000 $2,700.000 $2,500.000 $2,392.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 1,510.000 $30.000 $36.000 $84.000 $50.000 $111.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 160.000 $45.000 $50.000 $88.000 $85.000 $109.000
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40.000 $45.000 $50.000 $97.000 $85.000 $113.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 2,090.000 $10.000 $6.000 $9.000 $15.000 $5.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 1,510.000 $8.250 $10.000 $19.000 $12.000 $23.000
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 270.000 $10.000 $10.000 $10.000 $17.000 $23.000
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 40.000 $10.000 $10.000 $10.000 $17.000 $23.000
530 6005 DRIVEWAYS (ACP) SY 194.000 $85.000 $60.000 $45.000 $70.000 $19.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 325.000 $25.000 $20.000 $26.000 $20.500 $24.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $2,000.000 $1,500.000 $2,350.000 $1,475.000 $2,025.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,500.000 $2,700.000 $2,800.000 $2,700.000 $39.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 8.000 $3,000.000 $1,000.000 $1,500.000 $1,500.000 $6,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $3,000.000 $1,000.000 $950.000 $875.000 $7,500.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4.000 $8,000.000 $13,000.000 $9,500.000 $8,550.000 $26,000.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 $500.000 $900.000 $850.000 $700.000 $576.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 6.000 $23.000 $25.000 $31.000 $33.000 $350.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 15.000 $31.000 $40.000 $50.000 $40.000 $350.000
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 3,922.000 $0.610 $3.300 $3.300 $3.250 $0.500
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 77.000 $8.250 $11.000 $11.000 $11.500 $25.000
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 2,916.000 $0.750 $3.300 $3.300 $3.250 $1.650
666 6224 PAVEMENT SEALER 4" LF 2,864.000 $0.250 $1.100 $1.100 $1.110 $2.300
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 1,432.000 $0.300 $3.300 $3.300 $3.290 $4.000
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 1,432.000 $0.550 $3.300 $3.300 $3.290 $8.000
672 6009 REFL PAV MRKR TY II-A-A EA 74.000 $3.000 $11.000 $11.000 $11.750 $8.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 2,280.000 $0.500 $2.200 $2.200 $2.190 $2.900
678 6034 PAV SURF PREP FOR MRK (BLAST CLN)(4") LF 2,864.000 $0.100 $0.550 $0.550 $0.600 $0.100
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $9,000.000 $10,000.000 $20,000.000 $15,000.000 $16,000.000
6185 6001 TMA (STATIONARY) EA 2.000 $9,000.000 $10,000.000 $1,500.000 $25,000.000 $580.000
6185 6005 TMA (MOBILE OPERATION) DAY 30.000 $250.000 $400.000 $100.000 $75.000 $118.000
Totals: $2,780,998.97 $3,722,168.95 $3,818,900.75 $4,397,592.25 $4,781,262.60