Bid Cobra

LEE FM 1624 (1537-01-017)

Items: 61

County: LEE
Length: N/A
Highway: FM 1624
District: AUSTIN
Control Number: 1537-01-017
DBE Goal: N/A
Project: BR 2023(476)
Guaranty: N/A
Time: 49 WORKING DAYS
Engineer's Estimate: $1,511,248.00
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,511,248.00
$1,524,020.33
Over/Under Est: 0.85% $12,772.33
Over/Under Est: 16.77% $253,413.75
Amt Left: 15.79% $240,641.42
Over/Under Est: 22.06% $333,329.31
Amt Left: 21.03% $320,556.98
Delta: -4.53% -$79,915.56
Over/Under Est: 25.13% $379,780.00
Amt Left: 24.08% $367,007.67
Delta: -2.52% -$46,450.69
Over/Under Est: 27.97% $422,682.35
Amt Left: 26.9% $409,910.02
Delta: -2.27% -$42,902.35
Over/Under Est: 29.96% $452,732.60
Amt Left: 28.87% $439,960.27
Delta: -1.55% -$30,050.25

Bid Items & Bid Tabulations

61 Total 0 of 61
LEE  |  FM 1624  |  AUSTIN  |  1537-01-017  |  02/01/2023  |  $1,511,248.00  |  BR 2023(476)  |  BRIDGE REPL  |  49 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SB CONTRACTORS LLC
ACME BRIDGE COMPANY, INC.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
CROSS PLUS CONSTRUCTION, LLC
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC
PREPARING ROW
STA 6.000 $5,000.000 $6,000.000 $7,120.000 $10,884.450 $24,500.000 $550.000 $8,000.000
REMOVING CONC (RIPRAP)
SY 84.000 $15.000 $28.210 $31.200 $12.360 $40.000 $110.000 $18.000
EXCAVATION (ROADWAY)
CY 350.000 $25.000 $6.760 $29.900 $12.540 $50.000 $9.900 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,550.000 $25.000 $24.890 $38.400 $23.170 $45.000 $27.500 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,075.000 $2.500 $3.010 $7.400 $10.490 $6.750 $5.500 $9.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 1,075.000 $0.800 $1.930 $1.050 $1.140 $1.000 $3.300 $1.350
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 1,075.000 $0.800 $1.410 $0.950 $0.850 $0.750 $3.300 $1.200
VEGETATIVE WATERING
MG 2.000 $50.000 $65.000 $225.000 $66.710 $200.000 $110.000 $600.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,075.000 $2.000 $3.070 $1.650 $1.700 $1.500 $5.500 $2.100
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 450.000 $80.000 $126.320 $150.000 $116.640 $125.000 $66.000 $125.000
PRIME COAT (MULTI OPTION)
GAL 331.000 $7.000 $7.020 $7.300 $7.890 $5.000 $11.000 $7.500
CEM STABIL BKFL
CY 54.000 $170.000 $170.600 $257.000 $210.970 $325.000 $165.000 $200.000
DRILL SHAFT (30 IN)
LF 489.000 $275.000 $256.480 $251.000 $624.320 $275.000 $302.500 $375.000
CL C CONC (ABUT)
CY 31.400 $1,400.000 $1,353.860 $3,500.000 $2,329.400 $3,000.000 $1,815.000 $3,500.000
CL C CONC (CAP)
CY 24.400 $1,800.000 $2,116.280 $3,500.000 $1,885.190 $3,000.000 $3,300.000 $3,600.000
CL C CONC (COLUMN)
CY 12.500 $3,000.000 $2,149.800 $1,830.000 $1,526.560 $3,000.000 $3,850.000 $1,600.000
REINF CONC SLAB (BOX BEAM)
SF 5,813.000 $22.000 $20.790 $16.900 $22.150 $27.500 $24.200 $17.450
APPROACH SLAB
CY 55.700 $800.000 $640.120 $839.000 $870.700 $850.000 $715.000 $690.000
SHEAR KEY
CY 30.000 $450.000 $485.820 $745.000 $416.930 $600.000 $220.000 $578.000
PRESTR CONC BOX BEAM (4B20)
LF 634.000 $250.000 $278.350 $330.000 $283.950 $240.000 $330.000 $371.000
PRESTR CONC BOX BEAM (5B20)
LF 634.000 $225.000 $278.350 $330.000 $279.990 $240.000 $330.000 $371.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 225.000 $170.000 $153.660 $198.000 $163.370 $225.000 $165.000 $295.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $600.000 $619.340 $1,000.000 $553.490 $700.000 $330.000 $825.000
RAIL (TY T223)
LF 352.000 $150.000 $222.850 $118.000 $126.160 $160.000 $137.500 $177.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 72.000 $250.000 $273.760 $309.000 $211.170 $280.000 $176.000 $240.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $45,000.000 $50,000.000 $27,488.180 $100,000.000 $55,000.000 $51,000.000
REMOV STR (SMALL FENCE)
LF 200.000 $4.500 $4.530 $5.000 $8.440 $5.000 $1.100 $6.000
MOBILIZATION
LS 1.000 $120,000.000 $150,000.000 $150,000.000 $269,600.000 $180,000.000 $220,000.000 $185,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.500 $3,000.000 $10,000.000 $3,220.000 $5,635.680 $3,000.000 $8,250.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $40.000 $48.490 $53.500 $36.360 $32.000 $110.000 $67.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $40.000 $8.990 $31.400 $11.360 $10.000 $5.500 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 250.000 $25.000 $22.200 $27.600 $39.770 $30.000 $165.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 250.000 $10.000 $8.430 $26.600 $11.360 $5.000 $55.000 $33.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 910.000 $5.000 $4.500 $4.350 $5.110 $4.500 $16.500 $5.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 910.000 $1.000 $0.890 $2.000 $1.700 $1.000 $5.500 $2.500
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 320.000 $55.000 $33.630 $32.700 $40.550 $125.000 $220.000 $54.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 320.000 $15.000 $33.630 $32.500 $40.550 $80.000 $22.000 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $35.000 $27.610 $26.000 $26.140 $25.000 $38.500 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,100.000 $2,053.610 $2,340.000 $2,386.440 $2,300.000 $3,850.000 $2,940.000
REMOVE METAL BEAM GUARD FENCE
LF 717.500 $3.000 $3.370 $3.200 $3.410 $1.000 $5.500 $4.800
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,650.000 $3,622.660 $3,410.000 $3,471.700 $3,000.000 $3,850.000 $3,576.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $297.930 $281.000 $340.920 $250.000 $275.000 $300.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,100.000 $588.000 $825.000 $916.350 $750.000 $550.000 $900.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $6,226.150 $9,760.000 $3,138.540 $8,000.000 $11,000.000 $8,000.000
WIRE FENCE (TY C)
LF 200.000 $25.000 $11.230 $19.500 $10.450 $20.000 $11.000 $42.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $600.000 $758.350 $823.000 $782.980 $600.000 $275.000 $1,140.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $550.000 $758.360 $711.000 $857.980 $475.000 $275.000 $1,140.000
REMOVE SM RD SN SUP&AM
EA 7.000 $200.000 $153.070 $159.000 $112.500 $50.000 $110.000 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $16.560 $36.000 $45.390 $25.000 $55.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $40.000 $48.470 $81.600 $36.370 $32.000 $55.000 $54.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,200.000 $0.850 $1.080 $1.050 $1.700 $1.000 $2.200 $2.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 1,200.000 $0.850 $1.080 $1.050 $1.700 $1.000 $2.200 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,200.000 $1.500 $2.210 $2.100 $2.270 $2.000 $5.500 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,200.000 $1.500 $2.210 $2.100 $2.270 $2.000 $5.500 $3.000
REFL PAV MRKR TY II-A-A
EA 15.000 $15.000 $59.540 $56.100 $7.950 $15.000 $55.000 $25.000
D-GR HMA TY-D SAC-B PG76-22
TON 279.000 $300.000 $221.320 $231.000 $150.680 $225.000 $275.000 $236.500
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 430.000 $6.000 $4.770 $16.700 $5.110 $4.500 $27.500 $14.100
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 430.000 $2.000 $0.890 $4.250 $1.700 $1.000 $5.500 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $7,000.000 $8,390.000 $7,102.500 $5,000.000 $5,500.000 $5,500.000
TMA (STATIONARY)
DAY 30.000 $250.000 $165.000 $179.000 $597.780 $100.000 $1,100.000 $240.000
TMA (MOBILE OPERATION)
DAY 30.000 $475.000 $150.000 $510.000 $943.400 $100.000 $1,100.000 $480.000
Totals: $1,511,248.000 $1,524,020.345 $1,764,661.750 $1,844,577.321 $1,891,028.000 $1,933,930.350 $1,963,980.600