PREPARING ROW
|
STA
|
375.000
|
$2,500.000
|
$1,500.000
|
$2,175.000
|
$1,421.280
|
$3,250.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
7.000
|
$15.000
|
$50.000
|
$80.000
|
$73.260
|
$65.000
|
|
|
REMOV STAB BASE AND ASPH PAV (22")
|
SY
|
39,313.000
|
$8.000
|
$5.000
|
$7.350
|
$6.660
|
$6.700
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
113,250.000
|
$6.000
|
$5.000
|
$6.650
|
$7.890
|
$3.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
282,818.000
|
$8.000
|
$5.000
|
$12.650
|
$8.240
|
$15.100
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
600,791.000
|
$0.750
|
$0.500
|
$0.500
|
$0.850
|
$0.800
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
600,791.000
|
$0.300
|
$0.120
|
$0.100
|
$0.190
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
13,609.000
|
$17.750
|
$5.000
|
$5.000
|
$19.980
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
75,250.000
|
$1.000
|
$1.000
|
$0.850
|
$1.050
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
51,516.000
|
$1.500
|
$1.000
|
$0.950
|
$1.350
|
$4.500
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$100.000
|
$100.000
|
$83.000
|
$79.800
|
$90.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
47,723.000
|
$50.000
|
$47.000
|
$59.000
|
$56.270
|
$59.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
3,024.000
|
$150.000
|
$165.000
|
$170.000
|
$162.750
|
$200.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
168,223.000
|
$2.500
|
$2.000
|
$1.550
|
$1.820
|
$3.500
|
|
|
CEMENT
|
TON
|
1,008.000
|
$150.000
|
$140.000
|
$140.000
|
$136.500
|
$155.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
56,081.000
|
$2.500
|
$1.500
|
$1.500
|
$1.710
|
$1.750
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
42,944.000
|
$3.000
|
$3.500
|
$3.750
|
$3.830
|
$3.630
|
|
|
D-GR HMA(SQ) TY-B PG64-22 (LEVEL UP)
|
TON
|
54,466.000
|
$65.000
|
$62.000
|
$66.250
|
$66.360
|
$52.800
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
133,796.000
|
$57.000
|
$58.000
|
$64.000
|
$66.360
|
$51.400
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
424.000
|
$70.000
|
$90.000
|
$83.500
|
$83.340
|
$80.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
16,171.000
|
$70.000
|
$68.000
|
$73.000
|
$78.000
|
$65.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
1,458.000
|
$110.000
|
$102.000
|
$115.000
|
$122.100
|
$99.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
22,841.000
|
$110.000
|
$102.000
|
$115.000
|
$122.100
|
$99.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
4,800.000
|
$25.000
|
$30.000
|
$30.500
|
$35.310
|
$29.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
8,400.000
|
$15.000
|
$15.000
|
$16.250
|
$17.660
|
$17.000
|
|
|
CUT & RESTORING PAV
|
SY
|
127.000
|
$100.000
|
$75.000
|
$128.000
|
$105.000
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
359.000
|
$145.000
|
$125.000
|
$125.000
|
$136.500
|
$135.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
124.000
|
$380.000
|
$400.000
|
$450.000
|
$471.180
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
179.000
|
$200.000
|
$175.000
|
$95.000
|
$120.750
|
$165.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
117.000
|
$450.000
|
$500.000
|
$450.000
|
$461.620
|
$525.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,482.000
|
$52.500
|
$45.000
|
$40.000
|
$47.250
|
$78.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,989.000
|
$70.000
|
$55.000
|
$84.000
|
$52.500
|
$84.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
864.000
|
$80.000
|
$65.000
|
$105.000
|
$75.600
|
$110.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
753.000
|
$200.000
|
$100.000
|
$130.000
|
$92.400
|
$132.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
472.000
|
$220.000
|
$125.000
|
$182.000
|
$131.250
|
$165.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
97.000
|
$230.000
|
$150.000
|
$200.000
|
$152.240
|
$225.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
12.000
|
$4,000.000
|
$4,000.000
|
$3,250.000
|
$3,674.880
|
$3,800.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,000.000
|
$5,000.000
|
$4,250.000
|
$4,724.840
|
$5,300.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,300.000
|
$4,000.000
|
$2,000.000
|
$5,564.810
|
$8,300.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
3.000
|
$5,500.000
|
$5,000.000
|
$3,000.000
|
$5,459.810
|
$8,900.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
5.000
|
$6,000.000
|
$6,000.000
|
$4,000.000
|
$5,459.810
|
$11,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
4.000
|
$6,500.000
|
$6,500.000
|
$5,500.000
|
$5,774.800
|
$14,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$7,000.000
|
$10,000.000
|
$7,000.000
|
$6,824.770
|
$18,000.000
|
|
|
HEADWALL (CH - FW - 15) (DIA= 36 IN)
|
EA
|
1.000
|
$6,800.000
|
$6,000.000
|
$5,500.000
|
$8,399.710
|
$9,200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,000.000
|
$10,000.000
|
$4,500.000
|
$9,712.170
|
$12,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$900.000
|
$800.000
|
$750.000
|
$1,259.960
|
$1,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
103.000
|
$975.000
|
$800.000
|
$750.000
|
$1,049.960
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$1,700.000
|
$1,000.000
|
$900.000
|
$1,049.960
|
$1,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
54.000
|
$1,200.000
|
$1,000.000
|
$900.000
|
$1,154.960
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$1,500.000
|
$2,000.000
|
$1,049.960
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
22.000
|
$2,300.000
|
$2,500.000
|
$2,500.000
|
$1,259.960
|
$2,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,000.000
|
$3,000.000
|
$2,652.620
|
$3,900.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,428,100.000
|
$2,800,000.750
|
$2,205,000.000
|
$2,638,173.390
|
$2,650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$5,000.000
|
$5,000.000
|
$2,400.000
|
$3,207.960
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
5,480.000
|
$25.000
|
$28.000
|
$25.000
|
$29.500
|
$28.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
554.000
|
$45.000
|
$46.000
|
$43.000
|
$60.000
|
$42.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
6,034.000
|
$7.500
|
$3.000
|
$7.000
|
$15.750
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,316.000
|
$2.250
|
$3.000
|
$2.750
|
$2.150
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,316.000
|
$1.000
|
$0.250
|
$0.250
|
$0.350
|
$0.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,387.000
|
$60.000
|
$75.000
|
$69.000
|
$32.850
|
$59.730
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,975.000
|
$35.000
|
$40.000
|
$40.000
|
$10.000
|
$38.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,975.000
|
$8.000
|
$8.500
|
$5.000
|
$10.000
|
$15.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
885.000
|
$20.000
|
$20.000
|
$28.000
|
$19.840
|
$28.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
759.000
|
$83.000
|
$70.000
|
$90.000
|
$67.800
|
$95.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,449.000
|
$42.500
|
$20.000
|
$30.000
|
$29.610
|
$35.730
|
|
|
TURNOUTS (ACP)
|
SY
|
730.000
|
$35.000
|
$50.000
|
$41.000
|
$39.420
|
$70.850
|
|
|
CONC SIDEWALKS (4")
|
SY
|
450.000
|
$60.000
|
$50.000
|
$65.000
|
$46.650
|
$70.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
5.000
|
$1,900.000
|
$1,500.000
|
$2,500.000
|
$1,627.440
|
$2,600.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,048.000
|
$20.000
|
$22.000
|
$20.150
|
$22.020
|
$20.150
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,100.000
|
$1,200.000
|
$895.000
|
$1,027.390
|
$895.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
19,590.000
|
$10.000
|
$27.000
|
$25.000
|
$27.450
|
$26.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
23.000
|
$2,300.000
|
$2,500.000
|
$2,000.000
|
$3,941.070
|
$2,950.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,500.000
|
$3,000.000
|
$2,630.000
|
$2,826.680
|
$2,630.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$800.000
|
$750.000
|
$850.000
|
$1,000.210
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$11,000.000
|
$7,500.000
|
$6,500.000
|
$8,779.020
|
$8,523.000
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
1,000.000
|
$25.000
|
$25.000
|
$32.750
|
$27.450
|
$26.500
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
500.000
|
$20.000
|
$30.000
|
$33.000
|
$30.000
|
$69.280
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
27.000
|
$200.000
|
$200.000
|
$185.000
|
$185.000
|
$185.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
5.000
|
$250.000
|
$250.000
|
$205.000
|
$210.000
|
$205.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
10.000
|
$550.000
|
$500.000
|
$450.000
|
$460.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$450.000
|
$400.000
|
$483.000
|
$395.000
|
$483.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
22.000
|
$500.000
|
$600.000
|
$550.000
|
$535.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$550.000
|
$500.000
|
$545.000
|
$475.000
|
$545.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
129.000
|
$380.000
|
$300.000
|
$358.000
|
$270.000
|
$358.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
25.000
|
$475.000
|
$350.000
|
$375.000
|
$295.000
|
$375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$85.000
|
$75.000
|
$100.000
|
$45.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
22.000
|
$65.000
|
$60.000
|
$45.000
|
$55.000
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
18.000
|
$65.000
|
$60.000
|
$45.000
|
$56.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
34.000
|
$20.000
|
$40.000
|
$17.000
|
$29.000
|
$17.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,428.000
|
$4.000
|
$3.250
|
$2.500
|
$2.500
|
$2.950
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
2,779.000
|
$3.000
|
$3.250
|
$2.500
|
$2.500
|
$2.950
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
31,451.000
|
$0.700
|
$1.000
|
$0.670
|
$0.670
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
126,493.000
|
$0.500
|
$0.650
|
$0.550
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
17,112.000
|
$1.250
|
$1.300
|
$1.440
|
$1.440
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
850.000
|
$6.000
|
$12.000
|
$6.000
|
$6.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
42.000
|
$140.000
|
$150.000
|
$200.000
|
$200.000
|
$110.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
42.000
|
$150.000
|
$150.000
|
$200.000
|
$200.000
|
$110.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
14,071.000
|
$0.600
|
$0.700
|
$0.630
|
$0.630
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
140,865.000
|
$0.600
|
$0.700
|
$0.550
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (Y)12"(SLD)
|
LF
|
871.000
|
$1.500
|
$7.000
|
$3.000
|
$3.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
7,122.000
|
$0.900
|
$1.000
|
$0.550
|
$1.500
|
$1.030
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,864.000
|
$0.800
|
$1.000
|
$0.550
|
$1.500
|
$1.030
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,291.000
|
$0.800
|
$1.200
|
$0.400
|
$0.400
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
18,675.000
|
$0.650
|
$0.900
|
$0.670
|
$0.670
|
$0.770
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
320.000
|
$6.500
|
$10.000
|
$5.000
|
$5.000
|
$6.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
66.000
|
$105.000
|
$150.000
|
$117.000
|
$117.000
|
$110.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$345.000
|
$300.000
|
$224.000
|
$224.000
|
$235.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
44.000
|
$130.000
|
$175.000
|
$134.000
|
$134.000
|
$170.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
298.000
|
$35.000
|
$70.000
|
$37.000
|
$37.000
|
$55.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
18,955.000
|
$0.400
|
$0.420
|
$0.360
|
$0.360
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
7,385.000
|
$0.300
|
$0.420
|
$0.360
|
$0.360
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,635.000
|
$0.350
|
$0.420
|
$0.360
|
$0.360
|
$0.380
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
74,385.000
|
$0.700
|
$0.750
|
$0.680
|
$0.680
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
43,205.000
|
$0.600
|
$0.750
|
$0.680
|
$0.680
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
378.000
|
$3.500
|
$4.000
|
$3.330
|
$3.330
|
$3.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
746.000
|
$3.200
|
$4.000
|
$3.330
|
$3.330
|
$3.200
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,427.000
|
$3.200
|
$4.000
|
$3.330
|
$3.330
|
$3.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
103,608.000
|
$0.500
|
$0.500
|
$0.470
|
$0.470
|
$0.420
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
3.000
|
$950.000
|
$2,500.000
|
$550.000
|
$108.720
|
$560.780
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$3,500.000
|
$10,000.000
|
$4,500.000
|
$3,500.000
|
$12,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$1,500.000
|
$2,500.000
|
$1,500.000
|
$1,250.000
|
$3,500.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
71,984.000
|
$2.600
|
$3.000
|
$2.950
|
$3.270
|
$3.620
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$10,000.000
|
$7,500.000
|
$7,956.580
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
311.000
|
$180.000
|
$150.000
|
$175.000
|
$167.620
|
$158.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
232.000
|
$65.000
|
$50.000
|
$39.000
|
$68.960
|
$65.000
|
|
Totals: |
$30,340,010.900
|
$28,375,953.870
|
$32,333,641.020
|
$32,375,314.690
|
$32,611,154.810
|