LAVACA FM 532 (1007-01-026)

Items: 75

County: LAVACA
Length: N/A
Highway: FM 532
District: YOAKUM
Control Number: 1007-01-026
DBE Goal: N/A
Project: STP 2020(850)HES
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $1,335,001.00
Date: 05/07/2020 (6 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (10)
E
Engineer's Estimate
$1,335,001.00
$1,237,926.48
Over/Under Est: -7.27% -$97,074.52
$1,247,393.45
Over/Under Est: -6.56% -$87,607.55
Amt Left: 0.76% $9,466.97
Over/Under Est: -2.78% -$37,087.70
Amt Left: 4.85% $59,986.82
Delta: -4.05% -$50,519.85
$1,322,998.92
Over/Under Est: -0.9% -$12,002.08
Amt Left: 6.87% $85,072.44
Delta: -1.93% -$25,085.62
Over/Under Est: -0.18% -$2,368.33
Amt Left: 7.65% $94,706.19
Delta: -0.73% -$9,633.75
Over/Under Est: 1.89% $25,286.75
Amt Left: 9.88% $122,361.27
Delta: -2.08% -$27,655.08
$1,797,759.63
Over/Under Est: 34.66% $462,758.63
Amt Left: 45.22% $559,833.15
Delta: -32.16% -$437,471.88
$1,852,189.50
Over/Under Est: 38.74% $517,188.50
Amt Left: 49.62% $614,263.02
Delta: -3.03% -$54,429.87
$1,920,387.10
Over/Under Est: 43.85% $585,386.10
Amt Left: 55.13% $682,460.62
Delta: -3.68% -$68,197.60
$2,610,244.40
Over/Under Est: 95.52% $1,275,243.40
Amt Left: 110.86% $1,372,317.92
Delta: -35.92% -$689,857.30

Bid Items & Bid Tabulations

75 Total 0 of 75
LAVACA  |  FM 532  |  YOAKUM  |  1007-01-026  |  05/07/2020  |  $1,335,001.00  |  STP 2020(850)HES  |  SAFETY TREAT FIXED OBJECTS  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BECK-REIT & SONS, LTD.
VECTOR UTILITIES LLC
HILL COUNTRY BRIDGE, INC.
SJ&J CONSTRUCTION, LLC
LESTER CONTRACTING, INC.
TIERRA LEASE SERVICE, LLC
DBI SERVICES, LLC
FNH CONSTRUCTION, LLC
ALTUS CONSTRUCTION LLC
RELMCO, INC.
PREPARING ROW
STA 6.500 $3,000.000 $2,500.000 $3,138.700 $2,700.000 $1,500.000 $1,630.000 $500.000 $1,655.000 $23,000.000 $5,436.000 $35,000.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,201.000 $200.000 $33.000 $49.130 $27.200 $50.000 $31.900 $75.000 $50.000 $30.000 $48.850 $150.000
BLADING
HR 30.000 $100.000 $88.000 $249.480 $130.000 $100.000 $152.900 $145.000 $220.000 $150.000 $348.940 $450.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 6,666.000 $1.500 $1.000 $0.310 $1.100 $1.500 $0.360 $0.350 $0.420 $1.000 $0.350 $5.000
VEGETATIVE WATERING
MG 56.110 $100.000 $55.000 $18.410 $115.000 $20.000 $51.510 $44.000 $65.000 $50.000 $34.890 $500.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 222.000 $75.000 $75.000 $115.110 $73.600 $150.000 $111.250 $155.000 $235.000 $60.000 $139.580 $350.000
CEM STABIL BKFL
CY 319.000 $150.000 $200.000 $149.940 $156.500 $220.000 $93.820 $140.000 $295.000 $350.000 $209.360 $350.000
CUT & RESTORING PAV
SY 167.000 $100.000 $153.000 $1.840 $184.000 $95.000 $97.610 $125.000 $180.000 $200.000 $144.480 $250.000
FLOWABLE BACKFILL
CY 13.000 $250.000 $241.000 $22.090 $441.000 $220.000 $323.700 $385.000 $510.000 $350.000 $348.940 $400.000
TRENCH EXCAVATION PROTECTION
LF 94.000 $10.000 $30.000 $233.200 $39.000 $40.000 $137.590 $60.000 $20.000 $10.000 $27.920 $50.000
TEMPORARY SPL SHORING
SF 514.000 $25.000 $30.000 $22.090 $58.000 $50.000 $47.130 $55.000 $85.000 $85.000 $69.790 $85.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 200.000 $40.000 $25.000 $233.200 $94.000 $150.000 $55.000 $27.000 $235.000 $85.000 $209.360 $450.000
RIPRAP (CONC)(5 IN)
CY 40.900 $500.000 $600.000 $585.660 $1,100.000 $700.000 $662.190 $550.000 $635.000 $650.000 $593.200 $750.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 50.000 $150.000 $188.000 $267.080 $195.000 $220.000 $87.120 $200.000 $520.000 $185.000 $244.260 $250.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 5.000 $180.000 $300.000 $235.060 $415.000 $180.000 $314.060 $500.000 $415.000 $185.000 $279.150 $1,500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 99.000 $300.000 $188.000 $267.090 $278.000 $230.000 $181.270 $210.000 $415.000 $185.000 $244.260 $250.000
CMP (GAL STL 12 IN)
LF 12.000 $70.000 $80.000 $40.510 $97.000 $50.000 $100.920 $64.000 $65.000 $85.000 $79.450 $150.000
CMP (GAL STL 18 IN)
LF 232.000 $80.000 $80.000 $47.110 $102.000 $60.000 $69.830 $70.000 $85.000 $85.000 $87.670 $150.000
CMP (GAL STL 24 IN)
LF 24.000 $100.000 $108.000 $52.360 $106.000 $70.000 $79.060 $75.000 $95.000 $95.000 $189.100 $150.000
CMP (GAL STL 30 IN)
LF 8.000 $125.000 $148.000 $58.910 $112.000 $90.000 $151.070 $82.000 $110.000 $120.000 $209.360 $165.000
CMP AR (GAL STL DES 2)
LF 24.000 $75.000 $80.000 $48.950 $104.000 $60.000 $70.560 $72.000 $110.000 $100.000 $114.190 $150.000
CMP AR (GAL STL DES 3)
LF 92.000 $80.000 $80.000 $54.790 $109.000 $75.000 $97.320 $78.000 $115.000 $110.000 $115.290 $150.000
CMP AR (GAL STL DES 4)
LF 12.000 $100.000 $160.000 $61.970 $115.000 $90.000 $117.910 $85.000 $125.000 $125.000 $203.680 $165.000
CMP (GAL STL 15 IN)
LF 60.000 $95.000 $80.000 $43.200 $99.000 $45.000 $56.240 $67.000 $90.000 $85.000 $174.470 $165.000
CMP AR (GAL STL DES 1)
LF 12.000 $85.000 $80.000 $44.430 $100.000 $100.000 $91.980 $69.000 $140.000 $105.000 $174.470 $165.000
CONC BOX CULV (5 FT X 3 FT)
LF 12.000 $600.000 $3,239.760 $1,355.640 $705.000 $600.000 $953.030 $675.000 $2,420.000 $650.000 $711.460 $1,200.000
CONC BOX CULV (6 FT X 4 FT)
LF 10.000 $700.000 $3,711.760 $1,399.120 $710.000 $700.000 $1,057.710 $750.000 $2,460.000 $750.000 $761.230 $1,500.000
CONC BOX CULV (8 FT X 6 FT)
LF 3.000 $800.000 $4,111.760 $1,523.760 $1,300.000 $800.000 $1,630.920 $1,350.000 $2,700.000 $1,000.000 $1,248.580 $7,500.000
CONC BOX CULV (10 FT X 7 FT)
LF 9.000 $950.000 $4,811.760 $2,204.140 $2,100.000 $900.000 $1,814.210 $1,025.000 $2,950.000 $1,000.000 $1,540.920 $7,500.000
RC PIPE (CL III)(12 IN)
LF 12.000 $90.000 $70.000 $47.330 $70.000 $45.000 $105.140 $100.000 $70.000 $85.000 $86.540 $4,500.000
RC PIPE (CL III)(18 IN)
LF 560.000 $80.000 $70.000 $50.030 $76.200 $60.000 $71.870 $68.000 $110.000 $85.000 $117.240 $85.000
RC PIPE (CL III)(24 IN)
LF 188.000 $95.000 $85.000 $65.380 $82.500 $90.000 $91.930 $83.000 $120.000 $120.000 $150.740 $95.000
RC PIPE (CL III)(30 IN)
LF 174.000 $130.000 $90.000 $78.880 $91.600 $120.000 $126.130 $105.000 $145.000 $185.000 $200.990 $150.000
SET (TY I)(S=10 FT)(HW=8FT)(3:1)(C)
EA 4.000 $19,000.000 $14,500.000 $29,351.840 $14,250.000 $15,000.000 $15,463.100 $18,000.000 $16,820.000 $40,000.000 $16,138.510 $25,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $9,000.000 $8,000.000 $24,501.170 $11,190.000 $7,500.000 $11,272.390 $14,500.000 $18,000.000 $16,500.000 $14,516.180 $7,500.000
SET (TY I)(S= 4 FT)(HW= 7 FT)(3:1) (C)
EA 1.000 $10,000.000 $9,000.000 $27,218.690 $18,180.000 $6,500.000 $11,272.390 $16,750.000 $20,400.000 $20,000.000 $35,766.430 $7,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,500.000 $8,300.000 $13,206.650 $8,100.000 $5,500.000 $8,730.970 $12,500.000 $16,300.000 $17,000.000 $16,175.900 $9,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $11,000.000 $8,700.000 $18,677.130 $10,210.000 $5,500.000 $9,710.030 $14,750.000 $17,700.000 $16,500.000 $18,281.100 $12,500.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $11,000.000 $9,000.000 $17,883.720 $11,140.000 $6,500.000 $11,993.660 $17,500.000 $16,700.000 $20,000.000 $14,312.630 $12,500.000
SET (TY I)(S= 8 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $15,500.000 $9,500.000 $20,134.460 $18,780.000 $12,000.000 $11,860.880 $26,000.000 $19,100.000 $30,000.000 $14,888.140 $15,500.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 2.000 $1,100.000 $777.000 $1,141.970 $1,820.000 $400.000 $2,162.230 $1,900.000 $2,070.000 $1,250.000 $1,756.480 $2,250.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000 $1,100.000 $1,000.000 $1,066.300 $1,905.000 $700.000 $2,208.580 $2,000.000 $2,170.000 $1,250.000 $907.250 $2,250.000
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 8.000 $1,500.000 $800.000 $1,090.930 $1,925.000 $700.000 $2,190.870 $1,600.000 $2,005.000 $1,450.000 $1,812.570 $2,250.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 42.000 $1,500.000 $800.000 $1,232.440 $2,035.000 $700.000 $2,364.120 $1,200.000 $2,025.000 $1,850.000 $2,230.120 $2,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 4.000 $1,400.000 $1,200.000 $1,208.080 $1,700.000 $700.000 $2,366.790 $2,050.000 $2,125.000 $1,850.000 $1,242.230 $2,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 16.000 $1,450.000 $1,400.000 $1,210.800 $1,810.000 $900.000 $2,370.460 $2,050.000 $2,085.000 $1,850.000 $2,113.600 $2,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 14.000 $1,750.000 $1,400.000 $1,354.170 $2,190.000 $1,000.000 $2,534.120 $2,025.000 $2,425.000 $1,850.000 $2,467.710 $2,500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,500.000 $777.000 $1,430.180 $2,255.000 $1,200.000 $2,749.740 $1,700.000 $2,165.000 $2,250.000 $5,574.160 $2,750.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,300.000 $1,200.000 $1,493.780 $1,670.000 $1,500.000 $2,759.240 $2,100.000 $2,315.000 $2,500.000 $1,591.170 $2,750.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,550.000 $1,400.000 $1,691.050 $2,000.000 $2,000.000 $2,984.220 $2,400.000 $2,685.000 $2,650.000 $3,165.590 $2,750.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,400.000 $2,074.000 $1,630.850 $2,400.000 $2,500.000 $3,276.000 $2,400.000 $2,810.000 $3,000.000 $2,702.010 $2,750.000
SET (TY II) (30 IN) (CMP) (3: 1) (C)
EA 2.000 $2,000.000 $3,000.000 $1,497.520 $1,875.000 $3,500.000 $3,517.570 $2,050.000 $2,475.000 $3,000.000 $4,885.170 $3,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $1,675.000 $1,392.000 $1,943.840 $2,165.000 $3,500.000 $3,851.980 $3,000.000 $3,000.000 $3,500.000 $4,218.000 $3,500.000
SET (TY II) (DES 1) (CMP) (6: 1) (P)
EA 2.000 $1,200.000 $2,000.000 $1,081.550 $1,960.000 $2,500.000 $2,918.660 $1,975.000 $2,170.000 $2,500.000 $2,617.060 $2,500.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 6.000 $1,450.000 $2,000.000 $1,127.180 $2,070.000 $3,500.000 $3,619.550 $2,025.000 $2,150.000 $3,500.000 $1,812.660 $2,750.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 14.000 $1,500.000 $2,000.000 $1,526.970 $2,235.000 $4,500.000 $4,791.430 $1,900.000 $2,220.000 $3,850.000 $3,125.990 $3,500.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 4.000 $2,000.000 $2,000.000 $2,425.710 $3,485.000 $6,000.000 $6,766.280 $2,250.000 $2,700.000 $4,000.000 $4,536.230 $3,500.000
CLEAN EXIST CULVERTS
EA 10.000 $1,100.000 $4,777.000 $1,900.210 $1,945.000 $1,000.000 $508.600 $1,725.000 $2,930.000 $1,500.000 $2,526.980 $3,500.000
REMOV STR (SMALL)
EA 16.000 $1,000.000 $5,777.000 $418.390 $600.000 $200.000 $3,135.980 $975.000 $2,450.000 $2,500.000 $5,902.820 $1,850.000
MOBILIZATION
LS 1.000 $120,000.000 $100,000.000 $127,432.430 $129,000.000 $250,000.000 $72,000.000 $185,000.000 $180,000.000 $180,000.000 $188,428.040 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $3,090.910 $1,693.780 $3,400.000 $6,000.000 $4,275.000 $3,500.000 $9,055.000 $8,500.000 $20,936.450 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 225.000 $40.000 $25.000 $30.680 $31.500 $40.000 $74.000 $65.000 $82.000 $30.000 $43.330 $75.000
ROCK FILTER DAMS (REMOVE)
LF 225.000 $10.000 $9.000 $8.590 $16.500 $15.000 $11.220 $22.000 $26.000 $15.000 $11.830 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,800.000 $3.000 $3.000 $4.850 $7.170 $4.000 $3.000 $3.750 $4.850 $4.000 $3.090 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,800.000 $1.000 $1.000 $1.840 $3.000 $2.000 $1.000 $1.100 $1.350 $2.000 $0.950 $5.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,320.680 $25.000 $25.000 $25.770 $29.200 $29.000 $26.000 $29.500 $37.000 $25.000 $28.610 $30.000
MTL BEAM GD FEN TRANS (T101)
EA 12.000 $1,100.000 $1,300.000 $1,368.390 $1,145.000 $1,500.000 $1,475.000 $2,000.000 $1,450.000 $1,850.000 $1,384.600 $50.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 129.320 $75.000 $56.000 $74.870 $70.000 $150.000 $87.500 $100.000 $105.000 $50.000 $90.720 $200.000
REMOVE METAL BEAM GUARD FENCE
LF 1,425.000 $3.000 $2.300 $2.450 $9.500 $4.000 $2.600 $2.750 $4.000 $3.000 $2.510 $5.000
RM MTL BM GD FEN TRANS (T101)
EA 12.000 $150.000 $364.000 $184.110 $155.000 $500.000 $228.610 $200.000 $290.000 $500.000 $418.730 $10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,000.000 $2,812.000 $3,037.760 $2,550.000 $2,500.000 $3,477.550 $3,000.000 $4,180.000 $2,850.000 $3,726.690 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $350.000 $527.000 $270.020 $225.000 $750.000 $260.390 $500.000 $290.000 $1,500.000 $523.410 $4,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 94.000 $35.000 $29.640 $30.680 $25.000 $45.000 $32.350 $40.000 $35.000 $100.000 $48.850 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 42.000 $65.000 $80.000 $98.190 $75.000 $90.000 $59.690 $100.000 $90.000 $100.000 $118.640 $50.000
TMA (STATIONARY)
DAY 65.000 $500.000 $281.000 $245.480 $400.000 $150.000 $741.340 $325.000 $360.000 $550.000 $697.880 $350.000
Totals: $1,335,001.000 $1,237,926.480 $1,247,393.471 $1,297,913.306 $1,322,998.920 $1,332,632.677 $1,360,287.750 $1,797,759.630 $1,852,189.500 $1,920,387.113 $2,610,244.400