Show Job Controls
Bid Cobra

LAVACA UA 90 (0446-01-053)

Items: 73

County: LAVACA
Length: N/A
Highway: UA 90
District: YOAKUM
Control Number: 0446-01-053
DBE Goal: N/A
Project: STP 2022(864)HES
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $1,349,956.15
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
COVEY MORROW
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,349,956.15
$2,404,305.49
Over/Under Est: 78.1% $1,054,349.34
Over/Under Est: 119.33% $1,610,920.91
Amt Left: 23.15% $556,571.57
Subcontractor Percentage Amount
STX CIVIL 28.88% $694,363.43
DIIBS SPECIALISTS, LLC 3.59% $86,314.57
LONE STAR EROSION CONTROL 2.28% $54,818.17
GEOSOURCE, INC. 0.53% $12,742.82
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.18% $4,327.75
Total: 35.46% $852,566.74

Bid Items & Bid Tabulations

73 Total 0 of 73
LAVACA  |  UA 90  |  YOAKUM  |  0446-01-053  |  08/03/2022  |  $1,349,956.15  |  STP 2022(864)HES  |  HAZARD ELIM & SAFETY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HILL COUNTRY BRIDGE, INC.
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 5.000 $2,500.000 $3,050.000 $55,000.000
REMOVING CONC (RIPRAP)
SY 899.000 $25.000 $11.900 $28.620
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 3,446.000 $8.000 $27.900 $43.020
BLADING
HR 40.000 $100.000 $201.500 $152.100
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 17,599.000 $0.150 $1.040 $0.380
BROADCAST SEED (TEMP) (WARM)
SY 4,400.000 $0.100 $0.600 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 4,400.000 $0.100 $0.600 $0.500
VEGETATIVE WATERING
MG 148.090 $20.000 $53.700 $45.990
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 198.000 $65.000 $448.000 $281.690
PRIME COAT (RC-250)
GAL 237.000 $4.500 $41.600 $19.890
CEM STABIL BKFL
CY 353.000 $100.000 $177.500 $173.430
CUT & RESTORING PAV
SY 26.000 $30.000 $575.000 $567.890
TEMPORARY SPL SHORING
SF 816.000 $10.000 $19.800 $92.910
RIPRAP (CONC)(5 IN)
CY 68.000 $400.000 $781.000 $805.200
RIPRAP (STONE PROTECTION)(12 IN)
CY 234.000 $120.000 $338.750 $199.790
RETROFIT RAIL (TY T131RC)
LF 680.000 $150.000 $221.500 $372.870
CMP (GAL STL 18 IN)
LF 52.000 $60.000 $244.250 $61.940
CMP (GAL STL 24 IN)
LF 28.000 $70.000 $303.250 $121.400
CMP AR (GAL STL DES 2)
LF 4.000 $70.000 $336.000 $185.810
CMP AR (GAL STL DES 3)
LF 4.000 $80.000 $347.000 $309.690
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 32.000 $550.000 $708.000 $743.260
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 32.000 $750.000 $895.000 $1,052.950
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 64.000 $765.000 $844.000 $1,114.890
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 220.000 $800.000 $991.000 $1,176.820
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 40.000 $825.000 $1,054.000 $1,176.820
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 32.000 $870.000 $1,209.000 $1,238.760
RC PIPE (CL III)(18 IN)
LF 156.000 $65.000 $143.100 $74.330
RC PIPE (CL III)(24 IN)
LF 84.000 $75.000 $208.250 $158.560
RC PIPE (CL III)(30 IN)
LF 184.000 $85.000 $228.750 $180.860
RC PIPE (CL III)(36 IN)
LF 156.000 $110.000 $251.250 $247.750
RC PIPE (CL III)(42 IN)
LF 48.000 $175.000 $332.750 $303.500
RC PIPE (CL III)(48 IN)
LF 64.000 $200.000 $345.000 $371.630
HEADWALL (CH - FW - 45) (DIA= 48 IN)
EA 2.000 $9,500.000 $9,740.000 $14,865.150
WINGWALL (FW - S) (HW=7 FT)
EA 2.000 $10,000.000 $14,740.000 $14,865.150
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $7,000.000 $9,070.000 $9,910.100
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $9,000.000 $19,440.000 $14,865.150
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
EA 4.000 $10,500.000 $10,940.000 $13,007.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 10.000 $11,000.000 $16,450.000 $16,103.910
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $11,500.000 $21,120.000 $17,342.670
SET (TY I)(S= 7 FT)(HW= 8 FT)(3:1) (C)
EA 2.000 $12,000.000 $34,090.000 $29,730.300
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 12.000 $900.000 $1,843.000 $1,238.760
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,000.000 $2,068.000 $1,238.760
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 8.000 $1,100.000 $2,283.000 $2,477.520
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,150.000 $2,640.000 $1,858.140
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $2,628.000 $2,477.520
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 10.000 $1,500.000 $2,692.000 $3,716.290
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $2,250.000 $5,130.000 $4,335.670
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 7.000 $2,800.000 $4,232.000 $4,955.050
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 3.000 $3,500.000 $5,650.000 $5,574.430
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 1.000 $4,000.000 $10,610.000 $6,813.190
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 12.000 $1,100.000 $2,346.000 $2,477.520
SET (TY II) (DES 3) (CMP) (6: 1) (C)
EA 2.000 $1,200.000 $2,304.000 $3,716.290
CLEAN EXIST CULVERTS
EA 4.000 $500.000 $1,827.000 $3,096.910
REMOV STR (SMALL)
EA 1.000 $400.000 $1,794.000 $1,858.140
MOBILIZATION
LS 1.000 $95,000.000 $240,600.000 $289,676.440
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,500.000 $4,144.000 $10,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $3.000 $9.750 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.000 $2.370 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,237.500 $22.000 $28.000 $34.810
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,500.000 $1,910.000 $2,860.000
SHORT RADIUS
LF 37.500 $40.000 $32.000 $55.930
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,100.000 $1,400.000 $1,589.500
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 10.000 $95.000 $85.000 $94.100
REMOVE METAL BEAM GUARD FENCE
LF 1,400.000 $2.000 $2.000 $5.500
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $190.000 $250.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,200.000 $3,050.000 $3,745.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $240.000 $801.000 $400.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 30.000 $22.000 $23.000 $28.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 44.000 $60.000 $139.400 $125.000
TREE TRIMMING
MI 0.030 $20,000.000 $123,300.000 $108,000.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 24,340.000 $2.500 $4.170 $4.250
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 24,340.000 $0.500 $1.240 $0.500
TMA (STATIONARY)
DAY 15.000 $250.000 $551.000 $1,034.810
Totals: $1,349,956.150 $2,404,305.493 $2,960,877.079