County: LAVACA Highway: UA 90 Date: 08/03/2022 (2 years ago) Engineer's Estimate: $1,349,956 Control Number: 0446-01-053
Project: STP 2022(864)HES District: YOAKUM Time: 180 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,349,956.15
HILL COUNTRY BRIDGE, INC.   $2,404,305.49 1
78.1% | $1,054,349.34
HUNTER INDUSTRIES, LTD.   $2,960,877.06 2
119.33% | $1,610,920.91
23.15% | $556,571.57
Subcontractor Percentage Amount
STX CIVIL 28.87% $694,122.99
DIIBS SPECIALISTS, LLC 3.59% $86,314.57
GEOSOURCE, INC. 0.53% $12,742.82
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.18% $4,327.75
Total: 33.17% $797,508.13

Bid Items

Items: 73, 0 filtered
LAVACA UA 90  |  YOAKUM  |  0446-01-053  |  08/03/2022  |  $1,349,956  |  STP 2022(864)HES  |  HAZARD ELIM & SAFETY  |  180 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HILL COUNTRY BRIDGE, INC. HUNTER INDUSTRIES, LTD.
100 6002 PREPARING ROW STA 5.000 $2,500.000 $3,050.000 $55,000.000
104 6009 REMOVING CONC (RIPRAP) SY 899.000 $25.000 $11.900 $28.620
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 3,446.000 $8.000 $27.900 $43.020
150 6002 BLADING HR 40.000 $100.000 $201.500 $152.100
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 17,599.000 $0.150 $1.040 $0.380
164 6009 BROADCAST SEED (TEMP) (WARM) SY 4,400.000 $0.100 $0.600 $0.500
164 6011 BROADCAST SEED (TEMP) (COOL) SY 4,400.000 $0.100 $0.600 $0.500
168 6001 VEGETATIVE WATERING MG 148.090 $20.000 $53.700 $45.990
247 6466 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS CY 198.000 $65.000 $448.000 $281.690
310 6012 PRIME COAT (RC-250) GAL 237.000 $4.500 $41.600 $19.890
400 6005 CEM STABIL BKFL CY 353.000 $100.000 $177.500 $173.430
400 6006 CUT & RESTORING PAV SY 26.000 $30.000 $575.000 $567.890
403 6001 TEMPORARY SPL SHORING SF 816.000 $10.000 $19.800 $92.910
432 6002 RIPRAP (CONC)(5 IN) CY 68.000 $400.000 $781.000 $805.200
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 234.000 $120.000 $338.750 $199.790
451 6004 RETROFIT RAIL (TY T131RC) LF 680.000 $150.000 $221.500 $372.870
460 6002 CMP (GAL STL 18 IN) LF 52.000 $60.000 $244.250 $61.940
460 6003 CMP (GAL STL 24 IN) LF 28.000 $70.000 $303.250 $121.400
460 6009 CMP AR (GAL STL DES 2) LF 4.000 $70.000 $336.000 $185.810
460 6010 CMP AR (GAL STL DES 3) LF 4.000 $80.000 $347.000 $309.690
462 6050 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 32.000 $550.000 $708.000 $743.260
462 6053 CONC BOX CULV (5 FT X 5 FT)(EXTEND) LF 32.000 $750.000 $895.000 $1,052.950
462 6056 CONC BOX CULV (6 FT X 5 FT)(EXTEND) LF 64.000 $765.000 $844.000 $1,114.890
462 6057 CONC BOX CULV (6 FT X 6 FT)(EXTEND) LF 220.000 $800.000 $991.000 $1,176.820
462 6059 CONC BOX CULV (7 FT X 4 FT)(EXTEND) LF 40.000 $825.000 $1,054.000 $1,176.820
462 6062 CONC BOX CULV (7 FT X 7 FT)(EXTEND) LF 32.000 $870.000 $1,209.000 $1,238.760
464 6003 RC PIPE (CL III)(18 IN) LF 156.000 $65.000 $143.100 $74.330
464 6005 RC PIPE (CL III)(24 IN) LF 84.000 $75.000 $208.250 $158.560
464 6007 RC PIPE (CL III)(30 IN) LF 184.000 $85.000 $228.750 $180.860
464 6008 RC PIPE (CL III)(36 IN) LF 156.000 $110.000 $251.250 $247.750
464 6009 RC PIPE (CL III)(42 IN) LF 48.000 $175.000 $332.750 $303.500
464 6010 RC PIPE (CL III)(48 IN) LF 64.000 $200.000 $345.000 $371.630
466 6056 HEADWALL (CH - FW - 45) (DIA= 48 IN) EA 2.000 $9,500.000 $9,740.000 $14,865.150
466 6168 WINGWALL (FW - S) (HW=7 FT) EA 2.000 $10,000.000 $14,740.000 $14,865.150
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 2.000 $7,000.000 $9,070.000 $9,910.100
467 6185 SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C) EA 2.000 $9,000.000 $19,440.000 $14,865.150
467 6223 SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C) EA 4.000 $10,500.000 $10,940.000 $13,007.000
467 6227 SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C) EA 10.000 $11,000.000 $16,450.000 $16,103.910
467 6249 SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C) EA 2.000 $11,500.000 $21,120.000 $17,342.670
467 6260 SET (TY I)(S= 7 FT)(HW= 8 FT)(3:1) (C) EA 2.000 $12,000.000 $34,090.000 $29,730.300
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 12.000 $900.000 $1,843.000 $1,238.760
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 18.000 $1,000.000 $2,068.000 $1,238.760
467 6380 SET (TY II) (24 IN) (CMP) (6: 1) (P) EA 8.000 $1,100.000 $2,283.000 $2,477.520
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 4.000 $1,150.000 $2,640.000 $1,858.140
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $1,200.000 $2,628.000 $2,477.520
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 10.000 $1,500.000 $2,692.000 $3,716.290
467 6448 SET (TY II) (36 IN) (RCP) (3: 1) (C) EA 1.000 $2,250.000 $5,130.000 $4,335.670
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 7.000 $2,800.000 $4,232.000 $4,955.050
467 6463 SET (TY II) (42 IN) (RCP) (4: 1) (C) EA 3.000 $3,500.000 $5,650.000 $5,574.430
467 6477 SET (TY II) (48 IN) (RCP) (4: 1) (C) EA 1.000 $4,000.000 $10,610.000 $6,813.190
467 6525 SET (TY II) (DES 2) (CMP) (6: 1) (P) EA 12.000 $1,100.000 $2,346.000 $2,477.520
467 6536 SET (TY II) (DES 3) (CMP) (6: 1) (C) EA 2.000 $1,200.000 $2,304.000 $3,716.290
480 6001 CLEAN EXIST CULVERTS EA 4.000 $500.000 $1,827.000 $3,096.910
496 6042 REMOV STR (SMALL) EA 1.000 $400.000 $1,794.000 $1,858.140
500 6001 MOBILIZATION LS 1.000 $95,000.000 $240,600.000 $289,676.440
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $2,500.000 $4,144.000 $10,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 300.000 $3.000 $9.750 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 300.000 $1.000 $2.370 $0.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,237.500 $22.000 $28.000 $34.810
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,500.000 $1,910.000 $2,860.000
540 6014 SHORT RADIUS LF 37.500 $40.000 $32.000 $55.930
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,100.000 $1,400.000 $1,589.500
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 10.000 $95.000 $85.000 $94.100
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,400.000 $2.000 $2.000 $5.500
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 8.000 $190.000 $250.000 $165.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 $2,200.000 $3,050.000 $3,745.500
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 1.000 $240.000 $801.000 $400.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 30.000 $22.000 $23.000 $28.000
658 6073 INSTL OM ASSM (OM-2Y)(WC)GND(BI) EA 44.000 $60.000 $139.400 $125.000
752 6001 TREE TRIMMING MI 0.030 $20,000.000 $123,300.000 $108,000.000
5116 6001 AMPHIBIAN/REPTILE EXCLUSION FENCE INST LF 24,340.000 $2.500 $4.170 $4.250
5116 6002 AMPHIBIAN/REPTILE EXCLUSION FENCE REM LF 24,340.000 $0.500 $1.240 $0.500
6185 6002 TMA (STATIONARY) DAY 15.000 $250.000 $551.000 $1,034.810
Totals: $1,349,956.15 $2,404,305.49 $2,960,877.08