Job Info for 0446-01-048

County: LAVACA Highway: US 90A Date: 02/02/2017 (7 years ago) Engineer's Estimate: $805,959 Control Number: 0446-01-048
Project: STP 2017(701)HES District: YOAKUM Time: 90 WORKING DAYS Type: SAFETY TREAT FIXED OBJECTS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $805,958.60
K-BAR SERVICES, INC.   $793,103.50 1
-1.6% | -$12,855.10
HILL COUNTRY BRIDGE, INC.   $821,837.60 2
1.97% | $15,879.00
3.62% | $28,734.10
CONSTAR CONSTRUCTION   $823,547.00 3
2.18% | $17,588.40
3.84% | $30,443.50
0.21% | $1,709.40
RELMCO, INC.   $1,146,094.84 4
42.2% | $340,136.24
44.51% | $352,991.34
39.17% | $322,547.84
LESTER CONTRACTING, INC.   $1,151,125.00 5
42.83% | $345,166.40
45.14% | $358,021.50
0.44% | $5,030.16
CHAMPION INFRASTRUCTURE, LLC   $1,159,345.00 6
43.85% | $353,386.40
46.18% | $366,241.50
0.71% | $8,220.00
FNH CONSTRUCTION, LLC   $1,278,370.50 7
58.61% | $472,411.90
61.19% | $485,267.00
10.27% | $119,025.50

Bid Items

Items: 70, 0 filtered
LAVACA US 90A  |  YOAKUM  |  0446-01-048  |  02/02/2017  |  $805,959  |  STP 2017(701)HES  |  SAFETY TREAT FIXED OBJECTS  |  90 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate K-BAR SERVICES, INC. HILL COUNTRY BRIDGE, INC. CONSTAR CONSTRUCTION RELMCO, INC. LESTER CONTRACTING, INC. CHAMPION INFRASTRUCTURE, LLC FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 1.000 $2,000.000 $2,000.000 $3,505.000 $2,000.000 $25,000.000 $2,280.000 $4,500.000 $10,000.000
100 6003 PREPARING ROW(TREE)(5" TO 12" DIA) EA 8.000 $800.000 $2,000.000 $685.000 $500.000 $2,200.000 $285.000 $600.000 $2,500.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 295.000 $15.000 $60.000 $30.150 $18.000 $50.000 $46.000 $70.000 $35.000
150 6002 BLADING HR 30.000 $100.000 $60.000 $179.250 $80.000 $105.000 $220.000 $250.000 $150.000
164 6002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC 2.500 $1,500.000 $200.000 $551.000 $1,500.000 $2,200.000 $1,313.000 $1,400.000 $2,500.000
168 6001 VEGETATIVE WATERING MG 101.900 $20.000 $30.000 $27.500 $80.000 $50.000 $83.000 $100.000 $55.000
247 6466 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS CY 268.000 $100.000 $60.000 $130.400 $110.000 $115.000 $115.000 $120.000 $250.000
310 6009 PRIME COAT (MC-30) GAL 315.000 $5.000 $8.000 $15.000 $13.000 $8.000 $11.000 $40.000 $10.000
316 6249 AGGR(TY-PE GR-4 SAC-B) CY 10.000 $120.000 $300.000 $500.000 $540.000 $300.000 $945.750 $120.000 $300.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 427.000 $2.800 $10.000 $20.000 $13.000 $8.000 $9.000 $40.000 $8.000
400 6005 CEM STABIL BKFL CY 126.000 $150.000 $100.000 $166.750 $70.000 $135.000 $90.000 $80.000 $140.000
400 6006 CUT & RESTORING PAV SY 164.000 $150.000 $100.000 $61.400 $50.000 $135.000 $173.000 $60.000 $150.000
403 6001 TEMPORARY SPL SHORING SF 780.000 $25.000 $5.000 $26.800 $15.000 $45.000 $15.000 $60.000 $45.000
420 6054 CL C CONC (HEADWALL) CY 1.500 $750.000 $700.000 $775.000 $1,000.000 $4,500.000 $2,750.000 $2,500.000 $1,500.000
432 6002 RIPRAP (CONC)(5 IN) CY 87.100 $400.000 $475.000 $766.000 $350.000 $533.000 $650.000 $700.000 $650.000
460 6002 CMP (GAL STL 18 IN) LF 20.000 $55.000 $50.000 $34.700 $47.000 $107.430 $77.750 $120.000 $65.000
460 6009 CMP AR (GAL STL DES 2) LF 16.000 $65.000 $70.000 $36.400 $50.000 $90.940 $76.000 $150.000 $85.000
460 6010 CMP AR (GAL STL DES 3) LF 48.000 $80.000 $80.000 $39.700 $55.000 $77.550 $50.700 $160.000 $95.000
462 6001 CONC BOX CULV (3 FT X 2 FT) LF 7.000 $260.000 $300.000 $243.500 $470.000 $981.500 $1,081.000 $525.000 $600.000
462 6004 CONC BOX CULV (4 FT X 3 FT) LF 7.000 $350.000 $600.000 $299.000 $480.000 $994.500 $1,112.000 $600.000 $700.000
462 6006 CONC BOX CULV (5 FT X 2 FT) LF 15.000 $350.000 $1,200.000 $310.000 $490.000 $994.500 $1,035.000 $750.000 $700.000
462 6008 CONC BOX CULV (5 FT X 4 FT) LF 8.000 $450.000 $1,000.000 $377.750 $510.000 $1,007.500 $1,135.000 $820.000 $750.000
462 6010 CONC BOX CULV (6 FT X 3 FT) LF 8.000 $450.000 $800.000 $387.500 $520.000 $825.500 $1,203.000 $1,050.000 $850.000
462 6011 CONC BOX CULV (6 FT X 4 FT) LF 24.000 $550.000 $1,000.000 $364.750 $530.000 $955.500 $1,154.000 $1,200.000 $850.000
462 6017 CONC BOX CULV (7 FT X 6 FT) LF 16.000 $650.000 $1,500.000 $460.000 $800.000 $1,092.000 $1,309.000 $2,100.000 $900.000
462 6023 CONC BOX CULV (8 FT X 8 FT) LF 24.000 $900.000 $1,700.000 $607.000 $850.000 $1,042.600 $1,545.000 $2,900.000 $1,500.000
462 6027 CONC BOX CULV (9 FT X 8 FT) LF 16.000 $1,050.000 $1,800.000 $794.000 $900.000 $1,076.400 $1,850.000 $3,600.000 $1,500.000
464 6003 RC PIPE (CL III)(18 IN) LF 16.000 $60.000 $70.000 $70.350 $50.000 $87.100 $79.000 $120.000 $85.000
464 6005 RC PIPE (CL III)(24 IN) LF 136.000 $75.000 $100.000 $45.550 $54.000 $75.400 $77.500 $150.000 $125.000
464 6031 RC PIPE (ARCH)(CL III)(DES 2) LF 78.000 $175.000 $80.000 $70.450 $80.000 $201.500 $222.000 $275.000 $300.000
464 6032 RC PIPE (ARCH)(CL III)(DES 3) LF 168.000 $185.000 $90.000 $70.450 $90.000 $215.800 $182.000 $280.000 $300.000
464 6033 RC PIPE (ARCH)(CL III)(DES 4) LF 80.000 $200.000 $100.000 $94.700 $200.000 $266.500 $217.500 $320.000 $300.000
466 6157 WINGWALL (FW - S) (HW=10 FT) EA 1.000 $11,000.000 $10,000.000 $11,390.000 $16,000.000 $21,000.000 $19,895.000 $12,000.000 $30,000.000
466 6158 WINGWALL (FW - S) (HW=11 FT) EA 2.000 $12,000.000 $12,000.000 $13,520.000 $18,000.000 $32,500.000 $21,787.500 $15,000.000 $50,000.000
466 6170 WINGWALL (FW - S) (HW=9 FT) EA 1.000 $10,000.000 $8,000.000 $10,150.000 $15,000.000 $21,000.000 $18,645.000 $12,000.000 $28,500.000
467 6106 SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) EA 2.000 $5,000.000 $3,100.000 $4,820.000 $5,300.000 $5,846.100 $6,670.000 $2,200.000 $5,000.000
467 6144 SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 2.000 $5,000.000 $3,200.000 $6,640.000 $7,000.000 $7,337.200 $8,442.500 $3,200.000 $5,000.000
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 4.000 $4,500.000 $3,200.000 $4,827.000 $6,000.000 $6,074.250 $6,965.000 $2,600.000 $5,500.000
467 6186 SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C) EA 2.000 $6,000.000 $5,600.000 $13,100.000 $9,000.000 $11,952.200 $7,635.000 $7,600.000 $7,000.000
467 6212 SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C) EA 2.000 $6,000.000 $3,200.000 $7,620.000 $6,200.000 $8,412.300 $7,760.000 $4,500.000 $7,000.000
467 6219 SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C) EA 10.000 $8,000.000 $5,000.000 $4,657.000 $6,600.000 $7,014.800 $8,465.000 $3,400.000 $8,000.000
467 6256 SET (TY I)(S= 7 FT)(HW= 7 FT)(3:1) (C) EA 2.000 $7,000.000 $8,000.000 $6,380.000 $7,300.000 $7,874.100 $7,855.000 $4,600.000 $8,000.000
467 6257 SET (TY I)(S= 7 FT)(HW= 7 FT)(4:1) (C) EA 2.000 $7,500.000 $5,000.000 $8,490.000 $8,200.000 $9,366.500 $10,402.500 $4,800.000 $8,000.000
467 6326 SET (TY II) (12 IN) (RCP) (6: 1) (P) EA 2.000 $800.000 $1,200.000 $1,005.000 $1,400.000 $1,300.000 $1,532.000 $1,500.000 $1,250.000
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 12.000 $900.000 $1,200.000 $1,011.000 $1,500.000 $1,300.000 $1,827.500 $1,800.000 $1,250.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 18.000 $1,000.000 $1,200.000 $1,201.000 $1,600.000 $1,300.000 $2,223.000 $1,800.000 $1,250.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 13.000 $1,200.000 $1,200.000 $1,404.000 $1,800.000 $1,332.500 $2,873.000 $2,600.000 $1,500.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2.000 $3,000.000 $1,400.000 $2,500.000 $3,900.000 $2,028.000 $5,668.500 $4,200.000 $3,000.000
467 6525 SET (TY II) (DES 2) (CMP) (6: 1) (P) EA 4.000 $1,600.000 $1,000.000 $729.000 $1,500.000 $1,300.000 $2,116.000 $2,400.000 $1,250.000
467 6531 SET (TY II) (DES 2) (RCP) (6: 1) (P) EA 2.000 $2,000.000 $1,000.000 $1,692.000 $2,800.000 $2,548.000 $3,449.000 $2,400.000 $1,250.000
467 6537 SET (TY II) (DES 3) (CMP) (6: 1) (P) EA 10.000 $1,800.000 $1,100.000 $1,056.000 $1,600.000 $1,300.000 $2,465.000 $2,400.000 $1,250.000
467 6545 SET (TY II) (DES 3) (RCP) (6: 1) (P) EA 8.000 $2,500.000 $1,200.000 $2,214.000 $2,300.000 $3,315.000 $3,602.000 $2,400.000 $1,250.000
467 6555 SET (TY II) (DES 4) (RCP) (6: 1) (P) EA 4.000 $3,000.000 $1,300.000 $3,930.000 $4,000.000 $5,707.000 $5,524.000 $5,200.000 $1,250.000
496 6042 REMOV STR (SMALL) EA 7.000 $1,000.000 $1,000.000 $388.500 $600.000 $1,000.000 $2,150.000 $1,200.000 $1,500.000
500 6001 MOBILIZATION LS 1.000 $58,500.000 $75,000.000 $82,000.000 $43,000.000 $110,000.000 $68,000.000 $75,000.000 $125,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,000.000 $4,000.000 $7,750.000 $3,400.000 $6,500.000 $2,412.000 $4,500.000 $8,500.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 90.000 $30.000 $30.000 $26.250 $50.000 $37.400 $77.500 $40.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 90.000 $8.000 $5.000 $5.250 $15.000 $9.900 $53.750 $10.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,690.000 $2.500 $4.000 $2.860 $3.000 $2.200 $3.000 $5.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,690.000 $0.500 $1.000 $0.780 $1.000 $2.200 $1.400 $2.000 $2.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,550.000 $20.000 $22.000 $15.500 $25.000 $21.450 $24.650 $25.000 $25.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,500.000 $1,200.000 $2,401.000 $2,000.000 $1,870.000 $437.500 $800.000 $1,850.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 150.000 $50.000 $40.000 $39.400 $60.000 $61.600 $76.250 $75.000 $50.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 500.000 $1.000 $3.000 $3.820 $3.000 $1.100 $2.750 $6.000 $30.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $150.000 $100.000 $62.050 $300.000 $165.000 $343.750 $800.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 12.000 $2,400.000 $2,400.000 $1,864.000 $2,400.000 $2,387.000 $3,000.000 $2,750.000 $2,850.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 38.000 $10.000 $3.000 $12.950 $70.000 $13.200 $22.400 $20.000 $100.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 40.000 $25.000 $20.000 $28.900 $50.000 $20.900 $30.000 $150.000 $100.000
658 6071 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 6.000 $25.000 $20.000 $13.450 $50.000 $20.900 $32.000 $60.000 $100.000
658 6073 INSTL OM ASSM (OM-2Y)(WC)GND(BI) EA 34.000 $50.000 $20.000 $120.500 $60.000 $55.000 $52.500 $150.000 $100.000
Totals: $805,958.60 $793,103.50 $821,837.60 $823,547.00 $1,146,094.84 $1,151,125.00 $1,159,345.00 $1,278,370.50