LAVACA US 77 (0269-02-068)

Items: 78

County: LAVACA
Length: N/A
Highway: US 77
District: YOAKUM
Control Number: 0269-02-068
DBE Goal: N/A
Project: F 2022(703)
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $2,098,278.80
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
COVEY MORROW
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,098,278.80
$2,786,917.20
Over/Under Est: 32.82% $688,638.40
Over/Under Est: 42.43% $890,196.06
Amt Left: 7.23% $201,557.66
Subcontractor Percentage Amount
THIRD COAST SERVICES LLC 2.96% $82,469.17
HIGHWAY BARRICADES AND SERVICES, LLC 2.61% $72,717.75
J & M CONTRACTING, COMPANY 2.04% $56,836.86
MURRAY CONSTRUCTION 0.68% $18,945.62
LONE STAR EROSION CONTROL 0.41% $11,423.09
FLASHER EQUIPMENT COMPANY 0.27% $7,522.53
WEST TEXAS ROCK RESOURCES, LLC 0.15% $4,179.18
Total: 9.12% $254,094.20

Bid Items & Bid Tabulations

78 Total 0 of 78
LAVACA  |  US 77  |  YOAKUM  |  0269-02-068  |  08/04/2022  |  $2,098,278.80  |  F 2022(703)  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
BRANNAN PAVING CO., LTD.
REMOVING CONC (MEDIANS)
SY 4.000 $30.000 $75.240 $200.000
SUBGRADE WIDENING (ORD COMP)
STA 45.360 $250.000 $2,880.000 $1,016.310
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 8,510.000 $12.000 $29.340 $19.080
BLADING
HR 20.000 $125.000 $152.100 $125.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 22,942.000 $0.300 $0.320 $0.280
BROADCAST SEED (TEMP) (WARM)
SY 5,760.000 $0.300 $0.290 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 5,760.000 $0.300 $0.290 $0.250
VEGETATIVE WATERING
MG 193.100 $18.000 $50.490 $30.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,923.000 $80.000 $87.110 $92.690
FL BS (RDWY DEL) (TY E GR 1-2) (IN VEH)
CY 1,999.000 $75.000 $87.120 $89.960
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 303.000 $175.000 $237.600 $235.490
LIME TRT (EXST MATL)(8")
SY 9,520.000 $3.500 $2.340 $9.800
CEMENT
TON 337.000 $175.000 $216.000 $200.640
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 18,533.000 $2.000 $2.930 $2.560
CEMENT TREAT (SUBGRADE) (8")
SY 9,520.000 $2.500 $2.340 $4.990
SALV, HAUL & STKPL RCL ASH PV (12")
SY 331.000 $6.500 $31.680 $22.000
PRIME COAT (MC-30)
GAL 3,508.000 $4.000 $6.340 $8.500
AGGR(TY-PE GR-4 SAC-B)
CY 327.000 $105.000 $132.650 $291.290
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 15,503.000 $4.750 $5.040 $6.670
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 300.000 $95.000 $149.290 $155.000
PLANE ASPH CONC PAV(0" TO 1")
SY 1,636.000 $2.000 $7.060 $4.800
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 50.000 $250.000 $300.000 $300.000
RIPRAP (CONC)(CL B)
CY 1.750 $475.000 $1,317.030 $1,000.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 15.000 $475.000 $1,251.180 $950.000
RC PIPE (CL III)(18 IN)
LF 20.000 $100.000 $131.700 $100.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $4,750.000 $16,462.840 $12,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,900.000 $1,975.540 $1,500.000
REMOV STR (SMALL)
EA 1.000 $1,000.000 $1,317.030 $1,000.000
MOBILIZATION
LS 1.000 $140,000.000 $256,861.960 $245,175.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,500.000 $2,425.620 $2,960.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.500 $5.750 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.000 $2.300 $2.000
INTERSECTIONS (ACP)
SY 230.000 $45.000 $49.500 $67.000
DRIVEWAYS (SURF TREAT)
SY 117.000 $37.500 $49.500 $44.910
RUMBLE STRIPS (SHOULDER)
LF 12,436.000 $0.250 $0.270 $0.330
RUMBLE STRIPS (CENTERLINE)
LF 8,913.000 $0.250 $0.270 $0.330
CONC DIRECTIONAL ISLAND
SY 4.000 $250.000 $526.810 $400.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 5.000 $4,500.000 $5,825.000 $5,825.000
CONDT (PVC) (SCH 40) (2")
LF 509.000 $10.000 $13.500 $13.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 231.000 $20.000 $22.000 $22.000
ELEC CONDR (NO.8) BARE
LF 740.000 $1.500 $1.900 $1.900
ELEC CONDR (NO.8) INSULATED
LF 1,480.000 $1.750 $1.950 $1.950
GROUND BOX TY D (162922)W/APRON
EA 6.000 $1,200.000 $1,400.000 $1,400.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 2.000 $6,000.000 $6,875.000 $6,875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $625.000 $809.630 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $725.000 $863.610 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $800.000 $1,160.480 $1,075.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 16.000 $450.000 $464.190 $430.000
REMOVE SM RD SN SUP&AM
EA 27.000 $100.000 $80.960 $75.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 4.000 $100.000 $70.170 $65.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 525.000 $0.350 $0.800 $0.540
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 15,726.000 $0.350 $0.600 $0.450
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 180.000 $0.750 $0.500 $1.700
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 17,288.000 $0.750 $0.650 $0.950
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 23,676.000 $0.750 $0.650 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 188.000 $1.500 $1.490 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,059.000 $1.500 $1.490 $1.750
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 938.000 $1.000 $0.450 $0.920
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,303.000 $1.500 $0.900 $1.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,303.000 $1.500 $0.900 $1.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 40.000 $20.000 $16.000 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 3.000 $275.000 $225.000 $500.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $275.000 $300.000 $500.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 522.000 $7.500 $8.000 $7.000
REFL PAV MRKR TY I-C
EA 135.000 $5.500 $3.500 $4.500
REFL PAV MRKR TY II-A-A
EA 617.000 $5.500 $3.500 $4.500
D-GR HMA TY-B SAC-B PG64-22
TON 185.000 $100.000 $129.780 $130.000
D-GR HMA TY-B PG64-22 (LEVEL-UP)
TON 500.000 $100.000 $129.780 $130.000
D-GR HMA TY-D SAC-B PG70-22
TON 6,661.000 $100.000 $110.700 $142.100
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 492.000 $100.000 $142.200 $145.000
TACK COAT
GAL 4,801.000 $4.000 $4.030 $3.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $10,115.300 $12,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $7,500.000 $8,092.240 $6,000.000
TMA (STATIONARY)
DAY 10.000 $275.000 $217.480 $300.000
TMA (MOBILE OPERATION)
DAY 20.000 $350.000 $252.880 $500.000
HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MIL
LF 12,326.000 $0.900 $0.850 $0.600
HPPM-RIB W/RET REQ TYI(Y)4"(BRK)100MIL
LF 525.000 $0.900 $0.850 $0.660
HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MIL
LF 15,726.000 $0.900 $0.850 $0.600
Totals: $2,098,278.800 $2,786,917.212 $2,988,474.862