|
|
REMOVING CONC (MEDIANS)
|
SY
|
4.000
|
$30.000
|
$75.240
|
$200.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
45.360
|
$250.000
|
$2,880.000
|
$1,016.310
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
8,510.000
|
$12.000
|
$29.340
|
$19.080
|
|
|
BLADING
|
HR
|
20.000
|
$125.000
|
$152.100
|
$125.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
22,942.000
|
$0.300
|
$0.320
|
$0.280
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
5,760.000
|
$0.300
|
$0.290
|
$0.250
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
5,760.000
|
$0.300
|
$0.290
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
193.100
|
$18.000
|
$50.490
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,923.000
|
$80.000
|
$87.110
|
$92.690
|
|
|
FL BS (RDWY DEL) (TY E GR 1-2) (IN VEH)
|
CY
|
1,999.000
|
$75.000
|
$87.120
|
$89.960
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
303.000
|
$175.000
|
$237.600
|
$235.490
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
9,520.000
|
$3.500
|
$2.340
|
$9.800
|
|
|
CEMENT
|
TON
|
337.000
|
$175.000
|
$216.000
|
$200.640
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
18,533.000
|
$2.000
|
$2.930
|
$2.560
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
9,520.000
|
$2.500
|
$2.340
|
$4.990
|
|
|
SALV, HAUL & STKPL RCL ASH PV (12")
|
SY
|
331.000
|
$6.500
|
$31.680
|
$22.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,508.000
|
$4.000
|
$6.340
|
$8.500
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
327.000
|
$105.000
|
$132.650
|
$291.290
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
15,503.000
|
$4.750
|
$5.040
|
$6.670
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
300.000
|
$95.000
|
$149.290
|
$155.000
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
1,636.000
|
$2.000
|
$7.060
|
$4.800
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
50.000
|
$250.000
|
$300.000
|
$300.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
1.750
|
$475.000
|
$1,317.030
|
$1,000.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
15.000
|
$475.000
|
$1,251.180
|
$950.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
20.000
|
$100.000
|
$131.700
|
$100.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$4,750.000
|
$16,462.840
|
$12,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,900.000
|
$1,975.540
|
$1,500.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$1,000.000
|
$1,317.030
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$140,000.000
|
$256,861.960
|
$245,175.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$3,500.000
|
$2,425.620
|
$2,960.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
300.000
|
$4.500
|
$5.750
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
300.000
|
$1.000
|
$2.300
|
$2.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
230.000
|
$45.000
|
$49.500
|
$67.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
117.000
|
$37.500
|
$49.500
|
$44.910
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
12,436.000
|
$0.250
|
$0.270
|
$0.330
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
8,913.000
|
$0.250
|
$0.270
|
$0.330
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
4.000
|
$250.000
|
$526.810
|
$400.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
5.000
|
$4,500.000
|
$5,825.000
|
$5,825.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
509.000
|
$10.000
|
$13.500
|
$13.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
231.000
|
$20.000
|
$22.000
|
$22.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
740.000
|
$1.500
|
$1.900
|
$1.900
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,480.000
|
$1.750
|
$1.950
|
$1.950
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
6.000
|
$1,200.000
|
$1,400.000
|
$1,400.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$6,000.000
|
$6,875.000
|
$6,875.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$625.000
|
$809.630
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$725.000
|
$863.610
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$800.000
|
$1,160.480
|
$1,075.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
16.000
|
$450.000
|
$464.190
|
$430.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
27.000
|
$100.000
|
$80.960
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
4.000
|
$100.000
|
$70.170
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
525.000
|
$0.350
|
$0.800
|
$0.540
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,726.000
|
$0.350
|
$0.600
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
180.000
|
$0.750
|
$0.500
|
$1.700
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
17,288.000
|
$0.750
|
$0.650
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
23,676.000
|
$0.750
|
$0.650
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
188.000
|
$1.500
|
$1.490
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,059.000
|
$1.500
|
$1.490
|
$1.750
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
938.000
|
$1.000
|
$0.450
|
$0.920
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,303.000
|
$1.500
|
$0.900
|
$1.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,303.000
|
$1.500
|
$0.900
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
40.000
|
$20.000
|
$16.000
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
3.000
|
$275.000
|
$225.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$275.000
|
$300.000
|
$500.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
522.000
|
$7.500
|
$8.000
|
$7.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
135.000
|
$5.500
|
$3.500
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
617.000
|
$5.500
|
$3.500
|
$4.500
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
185.000
|
$100.000
|
$129.780
|
$130.000
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
500.000
|
$100.000
|
$129.780
|
$130.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
6,661.000
|
$100.000
|
$110.700
|
$142.100
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
492.000
|
$100.000
|
$142.200
|
$145.000
|
|
|
TACK COAT
|
GAL
|
4,801.000
|
$4.000
|
$4.030
|
$3.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$10,115.300
|
$12,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$7,500.000
|
$8,092.240
|
$6,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$275.000
|
$217.480
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$350.000
|
$252.880
|
$500.000
|
|
|
HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MIL
|
LF
|
12,326.000
|
$0.900
|
$0.850
|
$0.600
|
|
|
HPPM-RIB W/RET REQ TYI(Y)4"(BRK)100MIL
|
LF
|
525.000
|
$0.900
|
$0.850
|
$0.660
|
|
|
HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MIL
|
LF
|
15,726.000
|
$0.900
|
$0.850
|
$0.600
|
|
Totals: |
$2,098,278.800
|
$2,786,917.212
|
$2,988,474.862
|