Show Job Controls
Bid Cobra

LA SALLE CR (0922-20-020)

Items: 70

County: LA SALLE
Length: N/A
Highway: CR
District: LAREDO
Control Number: 0922-20-020
DBE Goal: N/A
Project: BR 2021(502)
Guaranty: N/A
Time: 419 WORKING DAYS
Engineer's Estimate: $3,608,105.91
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$3,608,105.91
$3,804,555.90
Over/Under Est: 5.44% $196,449.99
Over/Under Est: 26.64% $961,142.34
Amt Left: 20.1% $764,692.35
$4,675,276.40
Over/Under Est: 29.58% $1,067,170.49
Amt Left: 22.89% $870,720.50
Delta: -2.32% -$106,028.15
$5,415,621.67
Over/Under Est: 50.1% $1,807,515.76
Amt Left: 42.35% $1,611,065.77
Delta: -15.84% -$740,345.27
Subcontractor Percentage Amount
ZENITH SITE SERVICES 15.37% $588,739.41
STX CIVIL 13.16% $504,086.57
LONE STAR EROSION CONTROL 6.02% $230,592.79
TEXAS MATERIALS GROUP, INC. 5.74% $219,867.55
TEXAS SHAFTS, INC. 5.28% $202,247.50
J. R. (JOE) RAMON & SONS, INC. 2.62% $100,357.66
HIGHWAY BARRICADES AND SERVICES, LLC 0.65% $24,897.89
FRANK JR REINFORCEMENT LLC 0.26% $9,959.16
GEOSOURCE, INC. 0.26% $9,959.16
TORO BRAVO CONSTRUCTION, LLC 0.25% $9,576.11
PENHALL COMPANY 0.22% $8,426.98
MB PRIME LLC 0.22% $8,426.98
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.19% $7,277.85
PRO-LINE PAVING, LLC 0.18% $6,894.80
LONE STAR PAVING COMPANY 0.05% $1,915.22
Total: 50.47% $1,933,225.63

Bid Items & Bid Tabulations

70 Total 0 of 70
LA SALLE  |  CR  |  LAREDO  |  0922-20-020  |  05/05/2022  |  $3,608,105.91  |  BR 2021(502)  |  BRIDGE REPL  |  419 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HILL COUNTRY BRIDGE, INC.
TEXAS STEEL INDUSTRIAL PLACING, LLC
RELMCO, INC.
VECTOR UTILITIES LLC
PREPARING ROW
STA 21.120 $4,500.000 $2,375.000 $1,950.000 $3,000.000 $2,689.920
REMOVING STAB BASE AND ASPH PAV (10")
SY 3,997.500 $12.000 $4.700 $12.000 $15.000 $9.600
EXCAVATION (ROADWAY)
CY 1,380.000 $10.000 $9.750 $15.000 $15.000 $21.030
EXCAVATION (CHANNEL)
CY 540.000 $13.000 $12.550 $15.000 $25.000 $40.950
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 2,776.000 $18.000 $46.700 $25.000 $35.000 $46.850
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 2,895.500 $0.500 $1.570 $3.500 $1.650 $1.980
DRILL SEEDING (TEMP) (COOL)
SY 2,895.500 $0.350 $1.570 $3.500 $1.650 $1.980
PROOF ROLLING
HR 185.000 $100.000 $21.000 $100.000 $95.000 $82.710
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,736.000 $105.000 $110.400 $103.000 $137.200 $102.750
REWORK BS MTL (TY A) (8") (ORD COMP)
SY 5,310.000 $6.000 $2.600 $9.000 $6.000 $12.450
PRIME COAT (MC-30)
GAL 975.000 $7.500 $6.800 $9.000 $12.000 $10.870
CEM STABIL BKFL
CY 232.000 $150.000 $235.000 $150.000 $200.000 $100.540
TEMPORARY SPL SHORING
SF 720.300 $17.000 $11.700 $40.000 $35.000 $66.500
DRILL SHAFT (18 IN)
LF 164.000 $175.000 $257.500 $300.000 $350.000 $230.290
DRILL SHAFT (36 IN)
LF 510.000 $270.000 $392.000 $450.000 $450.000 $268.680
CL C CONC (ABUT)
CY 95.400 $1,100.000 $957.000 $1,400.000 $1,100.000 $1,210.480
REINF CONC SLAB
SF 6,300.000 $24.500 $26.950 $25.000 $28.000 $61.980
APPROACH SLAB
CY 91.000 $660.000 $768.000 $600.000 $1,015.000 $783.240
RETAINING WALL (MSE)
SF 1,524.000 $45.000 $83.400 $90.000 $110.000 $174.120
PRESTR CONC GIRDER (TX40)
LF 358.000 $135.000 $261.000 $210.000 $265.000 $324.750
PRESTR CONC GIRDER (TX54)
LF 478.000 $154.000 $256.000 $230.000 $265.000 $327.890
RIPRAP (CONC)(5 IN)
CY 38.000 $500.000 $578.000 $600.000 $485.000 $723.810
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 433.000 $170.000 $126.300 $235.000 $175.000 $300.730
RIPRAP (STONE PROTECTION)(12 IN)
CY 385.000 $225.000 $148.200 $225.000 $175.000 $300.410
RIPRAP (STONE PROTECTION)(15 IN)
CY 241.000 $250.000 $134.900 $225.000 $175.000 $248.440
RIPRAP (MOW STRIP)(4 IN)
CY 100.900 $450.000 $695.000 $600.000 $495.000 $686.900
RAIL (TY T223)
LF 519.000 $150.000 $101.000 $150.000 $95.000 $185.930
RAIL (TY SSTR)
LF 240.000 $125.000 $88.000 $110.000 $95.000 $216.280
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 118.000 $140.000 $115.000 $200.000 $130.000 $42.160
GABIONS (GALV)
CY 80.000 $220.000 $258.000 $600.000 $300.000 $371.030
CONC BOX CULV (12 FT X 6 FT)
LF 96.000 $950.000 $981.000 $1,955.000 $1,975.000 $2,768.390
CONC BOX CULV (8 FT X 3 FT)
LF 192.000 $950.000 $709.000 $975.000 $935.000 $1,520.550
CONC BOX CULV (12 FT X 5 FT)
LF 160.000 $900.000 $852.000 $1,875.000 $1,875.000 $2,472.360
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $20,000.000 $14,420.000 $20,000.000 $24,780.000 $38,382.290
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $29,000.000 $19,910.000 $23,500.000 $37,609.600 $44,779.340
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $38,000.000 $17,470.000 $27,000.000 $37,766.400 $51,176.380
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $40,000.000 $19,610.000 $27,500.000 $20,000.000 $34,001.870
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $50,000.000 $41,980.000 $85,000.000 $50,000.000 $58,754.780
MOBILIZATION
LS 1.000 $328,009.630 $380,450.000 $360,000.000 $310,000.000 $189,546.750
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $6,000.000 $2,475.000 $1,150.000 $7,000.000 $1,279.410
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,040.000 $35.000 $30.300 $45.000 $31.900 $38.380
ROCK FILTER DAMS (REMOVE)
LF 1,040.000 $10.000 $12.550 $10.000 $13.200 $16.630
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,662.000 $3.000 $2.300 $4.000 $2.420 $2.880
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,662.000 $1.000 $1.050 $1.500 $1.100 $1.410
CONSTRUCTING DETOURS
SY 4,812.000 $55.000 $85.100 $117.500 $115.000 $110.220
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 520.000 $38.000 $22.800 $70.000 $25.000 $147.710
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $50.000 $25.400 $70.000 $25.000 $196.550
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,440.000 $10.000 $5.750 $17.500 $12.000 $19.670
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 240.000 $12.000 $10.650 $17.500 $12.000 $88.500
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 1,440.000 $8.000 $5.750 $17.500 $18.000 $22.180
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 240.000 $10.000 $10.400 $17.500 $18.000 $37.590
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 520.000 $8.000 $17.200 $17.500 $18.000 $17.510
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $10.000 $18.900 $17.500 $18.000 $47.070
MTL W-BEAM GD FEN (TIM POST)
LF 1,475.000 $25.000 $25.500 $32.000 $26.840 $31.350
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $2,217.000 $2,600.000 $2,333.880 $2,718.750
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 350.000 $90.000 $98.600 $120.000 $103.730 $121.540
REMOVE METAL BEAM GUARD FENCE
LF 758.000 $4.000 $3.140 $5.000 $3.300 $3.970
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,000.000 $3,455.000 $3,900.000 $3,635.500 $4,234.850
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $392.000 $325.000 $412.500 $486.180
CHAIN LINK FENCE (REMOVE)
LF 4,275.500 $6.000 $2.850 $5.500 $6.600 $2.970
WIRE FENCE (TY C)
LF 4,275.500 $15.000 $11.450 $17.000 $22.000 $25.040
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $650.000 $889.000 $725.000 $33.000 $1,092.690
REMOVE SM RD SN SUP&AM
EA 12.000 $100.000 $155.000 $100.000 $55.000 $196.290
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $25.000 $26.000 $35.000 $55.000 $39.660
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 71.000 $30.000 $31.000 $40.000 $55.000 $39.660
PAVEMENT SEALER 4"
LF 6,104.000 $0.500 $1.380 $3.000 $1.450 $1.730
REFL PAV MRKR TY II-A-A
EA 102.000 $4.000 $33.450 $35.000 $35.200 $42.220
D-GR HMA TY-C SAC-A PG76-22
TON 534.000 $155.000 $418.000 $158.000 $265.000 $166.320
HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)
LF 2,054.000 $0.500 $2.350 $3.000 $2.470 $2.940
HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL)
LF 4,050.000 $1.000 $2.350 $3.000 $2.470 $2.940
Totals: $3,608,105.905 $3,804,555.920 $4,569,248.250 $4,675,276.410 $5,415,621.677