Job Info for 0018-02-089

County: LA SALLE Highway: IH 35 Date: 06/01/2022 (2 years ago) Engineer's Estimate: $1,148,272 Control Number: 0018-02-089
Project: STP 2022(662)HES District: LAREDO Time: 105 WORKING DAYS Type: INSTALLING CABLE BARRIER SYSTEM
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,148,272.18
MIJELUM, L.L.C.   $1,081,952.00 1
-5.78% | -$66,320.18
SCR CIVIL CONSTRUCTION, LLC   $1,178,684.20 2
2.65% | $30,412.02
8.94% | $96,732.20
MASSANA CONSTRUCTION INC.   $1,193,947.00 3
3.98% | $45,674.82
10.35% | $111,995.00
1.29% | $15,262.80
GRATIOT CONSTRUCTION, LTD.   $1,215,282.67 4
5.84% | $67,010.49
12.32% | $133,330.67
1.79% | $21,335.67
VECTOR UTILITIES LLC   $1,221,826.17 5
6.41% | $73,553.99
12.93% | $139,874.17
0.54% | $6,543.50
ALTUS CONSTRUCTION LLC   $1,282,457.00 6
11.69% | $134,184.82
18.53% | $200,505.00
4.96% | $60,630.83
CK NEWBERRY, LLC   $1,721,871.00 7
49.95% | $573,598.82
59.14% | $639,919.00
34.26% | $439,414.00

Bid Items

Items: 14, 0 filtered
LA SALLE IH 35  |  LAREDO  |  0018-02-089  |  06/01/2022  |  $1,148,272  |  STP 2022(662)HES  |  INSTLING CABLE BARRIER SYSTEM  |  105 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate MIJELUM, L.L.C. SCR CIVIL CONSTRUCTION, LLC MASSANA CONSTRUCTION INC. GRATIOT CONSTRUCTION, LTD. VECTOR UTILITIES LLC ALTUS CONSTRUCTION LLC CK NEWBERRY, LLC
150 6002 BLADING HR 80.000 $140.000 $200.000 $200.000 $140.000 $178.570 $131.810 $199.280 $200.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 65.000 $70.000 $120.000 $480.000 $175.000 $180.950 $240.040 $611.820 $200.000
310 6009 PRIME COAT (MC-30) GAL 58.000 $5.000 $15.000 $70.000 $10.000 $178.570 $16.310 $33.210 $40.000
330 6012 LRA PAV TY-II GR-CS SAC-B TON 9.000 $90.000 $490.000 $4,500.000 $205.000 $892.860 $447.600 $730.700 $850.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 1,008.000 $550.000 $555.000 $565.000 $460.000 $486.510 $523.300 $537.270 $600.000
500 6001 MOBILIZATION LS 1.000 $104,388.380 $10,000.000 $72,000.000 $243,394.000 $103,571.430 $122,182.610 $122,890.150 $300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $5,000.000 $5,000.000 $4,960.000 $9,500.000 $3,452.380 $2,717.940 $10,628.340 $25,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 144.000 $2.000 $20.000 $11.200 $5.000 $11.900 $4.080 $13.290 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 144.000 $0.700 $0.500 $3.350 $2.000 $5.950 $2.040 $6.640 $1.000
543 6002 CABLE BARRIER SYSTEM (TL-4) LF 26,670.000 $13.500 $14.000 $13.200 $12.000 $19.230 $15.040 $15.930 $20.000
543 6020 CABLE BARRIER TERMINAL SECTION (TL-4) EA 8.000 $4,000.000 $2,900.000 $3,160.000 $7,500.000 $3,363.100 $3,689.780 $4,392.760 $4,500.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 $650.000 $1,200.000 $2,300.000 $750.000 $654.760 $1,589.910 $1,219.480 $2,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $15,000.000 $10,000.000 $4,000.000 $2,500.000 $6,190.480 $27,179.450 $3,985.630 $10,000.000
6185 6002 TMA (STATIONARY) DAY 105.000 $180.000 $300.000 $225.000 $165.000 $1.190 $339.740 $159.430 $325.000
Totals: $1,148,272.18 $1,081,952.00 $1,178,684.20 $1,193,947.00 $1,215,282.67 $1,221,826.17 $1,282,457.00 $1,721,871.00