Job Info for 0018-01-076

County: LA SALLE Highway: IH 35 Date: 04/04/2017 (7 years ago) Engineer's Estimate: $1,519,355 Control Number: 0018-01-076
Project: NH 2017(325) District: LAREDO Time: 80 WORKING DAYS Type: REHABILITATION OF EXISTING HIGHWAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,519,355.41
ANGEL BROTHERS HOLDINGS CORP.   $1,622,860.21 1
6.81% | $103,504.80
ANDERSON COLUMBIA CO., INC.   $1,794,492.40 2
18.11% | $275,136.99
10.58% | $171,632.19
RELMCO, INC.   $2,086,309.48 3
37.32% | $566,954.07
28.56% | $463,449.27
16.26% | $291,817.08
J. CARROLL WEAVER, INC.   $2,101,431.22 4
38.31% | $582,075.81
29.49% | $478,571.01
0.72% | $15,121.74
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.   $2,637,677.17 5
73.61% | $1,118,321.76
62.53% | $1,014,816.96
25.52% | $536,245.95
ALTUS CONSTRUCTION LLC   $2,667,673.54 6
75.58% | $1,148,318.13
64.38% | $1,044,813.33
1.14% | $29,996.37
FOREMOST PAVING, INC.   $3,253,977.15 7
114.17% | $1,734,621.74
100.51% | $1,631,116.94
21.98% | $586,303.61

Bid Items

Items: 48, 0 filtered
LA SALLE IH 35  |  LAREDO  |  0018-01-076  |  04/04/2017  |  $1,519,355  |  NH 2017(325)  |  REHAB OF EXIST HWY  |  80 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ANGEL BROTHERS HOLDINGS CORP. ANDERSON COLUMBIA CO., INC. RELMCO, INC. J. CARROLL WEAVER, INC. SALINAS CONSTRUCTION TECHNOLOGIES, LTD. ALTUS CONSTRUCTION LLC FOREMOST PAVING, INC.
100 6002 PREPARING ROW STA 8.800 $500.000 $1,500.000 $350.000 $10,000.000 $336.000 $1,283.080 $8,005.000 $36,500.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 59.000 $10.000 $18.000 $25.000 $25.000 $87.520 $147.620 $20.990 $35.000
105 6041 REMOVING STAB BASE AND ASPH PAV(8") SY 183.000 $8.000 $10.000 $10.000 $12.000 $59.710 $52.490 $6.740 $15.000
105 6105 REMOVING STAB BASE AND ASPH PAV(15") SY 6,853.000 $12.000 $13.000 $12.000 $12.000 $16.300 $26.300 $8.860 $10.000
112 6002 SUBGRADE WIDENING (DENS CONT) STA 22.000 $400.000 $1,620.000 $1,360.000 $5,000.000 $2,164.400 $1,618.260 $763.000 $1,300.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 5,617.000 $0.250 $0.500 $0.400 $0.380 $0.340 $0.440 $0.250 $1.000
216 6001 PROOF ROLLING HR 11.400 $90.000 $60.000 $100.000 $150.000 $28.000 $93.120 $250.000 $200.000
292 6002 ASPHALT STAB BASE (GR 2)(PG 64) TON 2,805.000 $75.000 $74.000 $80.000 $75.000 $83.520 $119.400 $192.000 $80.000
341 6008 D-GR HMA TY-B PG64-22 TON 1,711.000 $100.000 $84.000 $85.000 $95.000 $105.350 $113.300 $102.000 $100.000
344 6048 SUPERPAVE MIXTURES SP-C SAC-B PG70-22 TON 883.000 $120.000 $100.000 $90.000 $125.000 $119.600 $126.800 $140.000 $110.000
360 6050 CONC PAV (CONT REINF)(FAST TRK)(11") SY 6,911.000 $90.000 $105.000 $104.000 $118.000 $98.860 $150.610 $135.000 $250.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 20.000 $450.000 $523.000 $420.000 $465.000 $448.000 $933.320 $550.000 $950.000
464 6017 RC PIPE (CL IV)(18 IN) LF 52.000 $49.000 $95.000 $78.000 $70.000 $84.000 $100.860 $95.000 $120.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 2.000 $1,300.000 $1,700.000 $1,575.000 $1,300.000 $1,680.000 $3,065.360 $937.000 $1,500.000
480 6001 CLEAN EXIST CULVERTS EA 1.000 $1,800.000 $1,200.000 $1,300.000 $1,500.000 $1,400.000 $4,770.340 $2,205.000 $2,000.000
500 6001 MOBILIZATION LS 1.000 $138,123.310 $155,000.000 $184,000.000 $200,000.000 $380,132.740 $467,578.380 $248,562.000 $290,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $3,000.000 $3,400.000 $30,000.000 $12,000.000 $1,092.000 $3,984.980 $9,500.000 $7,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 45.000 $20.000 $38.000 $35.000 $30.000 $61.600 $39.310 $34.000 $100.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 120.000 $40.000 $39.000 $36.000 $30.000 $61.600 $38.830 $44.500 $100.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 165.000 $10.000 $12.000 $10.000 $12.000 $11.200 $12.080 $12.000 $50.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 146.000 $3.000 $9.000 $8.000 $7.000 $5.040 $10.070 $3.400 $7.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 146.000 $1.000 $2.000 $1.500 $3.000 $3.360 $2.370 $0.980 $3.000
508 6001 CONSTRUCTING DETOURS SY 1,084.000 $20.000 $14.000 $68.000 $75.000 $159.980 $5.670 $82.000 $90.000
530 6005 DRIVEWAYS (ACP) SY 197.000 $20.000 $32.000 $66.000 $60.000 $38.080 $87.100 $46.500 $45.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 275.000 $20.000 $30.000 $23.000 $20.000 $39.200 $27.880 $32.000 $30.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,200.000 $1,100.000 $890.000 $850.000 $2,240.000 $1,099.000 $1,500.000 $1,500.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 37.500 $45.000 $79.000 $60.000 $60.000 $141.120 $90.820 $75.000 $70.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $2,000.000 $2,640.000 $2,300.000 $2,200.000 $2,240.000 $2,525.820 $2,900.000 $2,500.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 14.000 $250.000 $465.000 $430.000 $451.000 $459.200 $576.120 $890.000 $1,000.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 11.000 $400.000 $560.000 $520.000 $544.500 $554.400 $680.620 $700.000 $1,000.000
644 6005 IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT) EA 1.000 $700.000 $700.000 $650.000 $682.000 $694.400 $753.080 $912.000 $1,000.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 3.000 $1,000.000 $730.000 $680.000 $715.000 $728.000 $1,055.580 $995.000 $1,000.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 4.000 $25.000 $20.000 $20.000 $19.800 $20.160 $53.960 $35.000 $50.000
658 6049 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 1.000 $75.000 $73.000 $70.000 $71.500 $72.800 $104.080 $91.000 $50.000
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 4,476.000 $0.500 $0.670 $0.700 $0.737 $0.750 $0.570 $0.800 $0.700
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 177.000 $6.000 $6.000 $6.000 $6.600 $6.720 $17.100 $12.000 $7.000
662 6086 WK ZN PAV MRK REMOV (W)(RR XING) EA 2.000 $400.000 $444.000 $470.000 $488.400 $497.280 $437.910 $275.000 $450.000
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 3,973.000 $0.500 $0.670 $0.700 $0.737 $0.750 $2.750 $0.800 $0.750
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 177.000 $6.000 $6.000 $6.000 $6.600 $6.720 $13.800 $7.800 $6.000
666 6093 REFL PAV MRK TY I (W)(RR XING)(100MIL) EA 2.000 $350.000 $477.000 $500.000 $524.700 $534.240 $712.910 $680.000 $500.000
666 6224 PAVEMENT SEALER 4" LF 4,609.000 $0.300 $0.200 $0.200 $0.220 $0.220 $0.350 $0.350 $0.300
666 6230 PAVEMENT SEALER 24" LF 153.000 $4.000 $3.000 $3.000 $3.300 $3.360 $7.040 $125.000 $3.000
666 6242 PAVEMENT SEALER (RR XING) EA 1.000 $150.000 $300.000 $315.000 $330.000 $336.000 $133.320 $0.450 $300.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 4,476.000 $0.350 $0.420 $0.500 $0.462 $0.470 $0.410 $0.700 $0.500
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 3,973.000 $0.350 $0.420 $0.500 $0.462 $0.470 $0.410 $0.600 $0.500
672 6009 REFL PAV MRKR TY II-A-A EA 56.000 $4.000 $10.000 $10.000 $11.000 $11.200 $5.790 $6.000 $10.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 16.000 $3.000 $10.000 $10.000 $11.000 $11.200 $23.110 $8.000 $20.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 10.000 $7,500.000 $4,700.000 $4,500.000 $9,000.000 $6,720.000 $9,250.580 $25,000.000 $6,000.000
Totals: $1,519,355.41 $1,622,860.21 $1,794,492.40 $2,086,309.49 $2,101,431.22 $2,637,677.18 $2,667,673.54 $3,253,977.15