Job Info for 0923-10-021

County: LAMPASAS Highway: CS Date: 10/01/2024 (7 weeks ago) Engineer's Estimate: $1,732,595 Control Number: 0923-10-021
Project: BR 2023(711) District: BROWNWOOD Time: 99 WORKING DAYS Type: BRIDGE REPLACEMENT
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,732,595.00
ACME BRIDGE COMPANY, INC.   $1,523,054.20 1
-12.09% | -$209,540.80
SKYLINE BRIDGE LLC   $1,533,011.20 2
-11.52% | -$199,583.80
0.65% | $9,957.00
KNIFE RIVER CORPORATION - SOUTH   $1,620,232.00 3
-6.49% | -$112,363.00
6.38% | $97,177.80
5.69% | $87,220.80
C. E. BARKER, LTD.   $1,682,832.55 4
-2.87% | -$49,762.45
10.49% | $159,778.35
3.86% | $62,600.55
DELGADO'S CONTRACTORS, LLC   $1,698,982.00 5
-1.94% | -$33,613.00
11.55% | $175,927.80
0.96% | $16,149.45
STX CIVIL   $1,701,548.40 6
-1.79% | -$31,046.60
11.72% | $178,494.20
0.15% | $2,566.40
YOKO EXCAVATING, LLC   $1,814,561.27 7
4.73% | $81,966.27
19.14% | $291,507.07
6.64% | $113,012.87

Bid Items

Items: 47, 0 filtered
LAMPASAS CS  |  BROWNWOOD  |  0923-10-021  |  10/01/2024  |  $1,732,595  |  BR 2023(711)  |  BRIDGE REPL  |  99 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ACME BRIDGE COMPANY, INC. SKYLINE BRIDGE LLC KNIFE RIVER CORPORATION - SOUTH C. E. BARKER, LTD. DELGADO'S CONTRACTORS, LLC STX CIVIL YOKO EXCAVATING, LLC
100 7002 PREPARING ROW STA 3.600 $4,000.000 $10,000.000 $3,777.000 $17,000.000 $46,000.000 $1,250.000 $30,000.000 $6,416.771
110 7001 EXCAV (ROADWAY) CY 295.000 $22.000 $33.500 $19.000 $30.000 $14.240 $60.000 $48.000 $31.476
110 7002 EXCAV (CHANNEL) CY 1,277.000 $28.000 $28.600 $16.000 $30.000 $26.110 $50.000 $48.000 $48.434
132 7005 EMBANK (FNL)(OC)(TY C) CY 423.000 $32.000 $31.900 $36.000 $30.000 $15.430 $75.000 $28.000 $148.857
164 7001 BROADCAST SEED (PERM_RURAL_SAND) SY 1,100.000 $2.500 $2.100 $2.500 $2.750 $3.130 $1.000 $3.000 $3.353
164 7005 BROADCAST SEED (TEMP_WARM) SY 550.000 $2.000 $2.100 $2.500 $3.250 $3.520 $1.000 $4.000 $3.494
164 7006 BROADCAST SEED (TEMP_COOL) SY 550.000 $2.000 $2.100 $2.500 $3.250 $3.520 $1.000 $4.000 $3.589
168 7001 VEGETATIVE WATERING TGL 18.000 $70.000 $81.000 $1.000 $75.000 $22.550 $60.000 $70.000 $36.670
169 7024 SOIL RET BLKT(SL_STEEP_SAND_LONG_SPRY) SY 1,100.000 $7.000 $5.400 $6.000 $5.500 $3.930 $2.000 $4.000 $5.284
169 7033 SOIL RET BLKT(CHAN_PERM_6 PSF) SY 699.000 $10.000 $5.400 $6.000 $9.000 $12.190 $2.000 $13.000 $13.099
247 7178 FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS) CY 276.000 $160.000 $122.000 $120.000 $110.000 $64.880 $100.000 $100.000 $96.053
310 7004 PRIME COAT (MC-30) GAL 489.000 $20.000 $13.000 $15.000 $10.000 $8.310 $15.000 $15.000 $17.087
316 7007 ASPH (AC-20-5TR) GAL 685.000 $20.000 $9.500 $15.000 $9.000 $29.670 $15.000 $15.000 $17.087
316 7256 AGGR (TY-PB, GR-4) CY 17.000 $1,000.000 $526.000 $825.000 $500.000 $356.030 $800.000 $952.000 $894.592
344 7031 SP MIXES SP-C SAC-B PG76-22 TON 184.000 $500.000 $367.000 $350.000 $220.000 $296.690 $350.000 $422.000 $399.292
400 7010 CEM STABIL BKFL CY 40.000 $400.000 $294.000 $359.000 $345.000 $166.150 $275.000 $262.000 $338.435
402 7001 TRENCH EXCAVATION PROTECTION LF 70.000 $15.000 $81.100 $64.000 $15.000 $8.310 $25.000 $20.000 $39.088
416 7004 DRILL SHAFT (24 IN) LF 568.000 $275.000 $336.000 $383.000 $405.000 $400.600 $400.000 $386.000 $401.665
420 7012 CL C CONC (ABUT) CY 27.400 $2,000.000 $1,590.000 $1,150.000 $1,800.000 $1,871.450 $1,800.000 $1,880.000 $1,855.682
420 7022 CL C CONC (CAP) CY 20.800 $2,500.000 $1,870.000 $1,869.000 $2,000.000 $1,999.600 $1,800.000 $2,160.000 $2,001.861
420 7038 CL C CONC (COLUMN) CY 11.100 $2,500.000 $2,140.000 $2,278.000 $2,200.000 $2,053.700 $1,800.000 $2,654.000 $1,828.118
422 7007 REINF CONC SLAB (SLAB BEAM) SF 5,482.000 $40.000 $21.100 $28.000 $22.500 $25.260 $29.000 $21.000 $33.932
425 7018 PRESTR CONC SLAB BEAM (4SB15) LF 1,028.000 $225.000 $259.000 $246.000 $225.000 $201.880 $240.000 $209.000 $279.153
425 7019 PRESTR CONC SLAB BEAM (5SB15) LF 257.000 $275.000 $264.000 $336.000 $225.000 $201.880 $300.000 $199.000 $279.153
432 7043 RIPRAP (STONE PROTECTION)(18 IN) CY 1,007.000 $200.000 $155.000 $189.000 $141.000 $136.480 $215.000 $180.000 $140.099
442 7011 STR STEEL (RAILS/POSTS/PLATES) LB 284.000 $40.000 $67.900 $40.000 $65.000 $11.650 $30.000 $35.000 $36.186
449 7001 ANCHOR BOLTS EA 110.000 $100.000 $74.500 $50.000 $70.000 $138.420 $100.000 $70.000 $51.928
450 7034 RAIL (TY C223) LF 284.000 $200.000 $180.000 $170.000 $250.000 $189.880 $220.000 $180.000 $241.989
454 7003 ARMOR JOINT (SEALED) LF 78.000 $230.000 $195.000 $159.000 $175.000 $71.210 $300.000 $154.000 $136.940
496 7009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $35,000.000 $42,100.000 $14,250.000 $80,000.000 $77,613.450 $55,000.000 $60,000.000 $77,027.755
500 7001 MOBILIZATION LS 1.000 $155,000.000 $129,000.000 $125,000.000 $160,000.000 $165,000.000 $125,000.000 $145,000.000 $159,788.553
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $6,000.000 $4,110.000 $1,800.000 $2,500.000 $2,741.390 $2,500.000 $1,500.000 $3,907.656
506 7002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 80.000 $65.000 $54.600 $45.000 $55.000 $74.330 $85.000 $79.000 $52.250
506 7011 ROCK FILTER DAMS (REMOVE) LF 80.000 $20.000 $19.100 $22.000 $16.000 $23.740 $5.000 $19.000 $15.594
506 7039 TEMP SEDMT CONT FENCE (INSTALL) LF 948.000 $6.000 $6.400 $4.000 $9.000 $5.270 $7.000 $6.000 $6.516
506 7041 TEMP SEDMT CONT FENCE (REMOVE) LF 948.000 $3.000 $2.100 $2.000 $1.000 $2.370 $1.000 $3.000 $2.270
506 7045 BIODEG EROSN CONT LOGS (INSTL) (18") LF 222.000 $10.000 $9.500 $12.000 $10.000 $12.220 $10.000 $13.000 $16.226
506 7046 BIODEG EROSN CONT LOGS (REMOVE) LF 222.000 $3.000 $4.250 $9.000 $1.000 $2.370 $1.000 $5.000 $4.931
540 7002 MTL W-BEAM GD FEN (STEEL POST) LF 125.000 $40.000 $31.800 $36.000 $35.000 $49.840 $40.000 $39.000 $40.562
540 7006 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $2,200.000 $1,270.000 $1,754.000 $1,500.000 $1,542.780 $1,250.000 $3,074.000 $1,588.616
544 7001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $4,000.000 $3,290.000 $4,191.000 $3,500.000 $3,441.580 $4,000.000 $4,851.000 $3,975.138
552 7001 WIRE FENCE (TY A) LF 400.000 $25.000 $14.700 $18.000 $35.000 $59.340 $20.000 $50.000 $29.890
552 7004 WIRE FENCE (TY D) LF 440.000 $30.000 $22.100 $20.000 $41.000 $59.340 $50.000 $50.000 $38.564
552 7005 WIRE FENCE (SPECIAL) LF 108.000 $50.000 $58.400 $33.000 $89.000 $118.680 $100.000 $100.000 $43.577
658 7013 INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) EA 6.000 $50.000 $21.200 $47.000 $23.000 $57.390 $50.000 $50.000 $31.205
658 7019 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 8.000 $50.000 $26.500 $47.000 $29.000 $41.540 $50.000 $50.000 $38.746
4003 7001 TIP TESTING(DRILL SHAFT) EA 4.000 $8,500.000 $4,240.000 $6,441.000 $6,000.000 $4,747.000 $5,000.000 $5,035.000 $5,082.906
Totals: $1,732,595.00 $1,523,054.20 $1,533,011.20 $1,620,232.00 $1,682,832.55 $1,698,982.00 $1,701,548.40 $1,814,561.41