Show Job Controls
Bid Cobra

LAMB US 84 (0052-05-047)

Items: 25

County: LAMB
Length: N/A
Highway: US 84
District: LUBBOCK
Control Number: 0052-05-047
DBE Goal: N/A
Project: STP 2022(493)HES
Guaranty: N/A
Time: 167 WORKING DAYS
Engineer's Estimate: $2,513,801.50
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (8)
E
Engineer's Estimate
$2,513,801.50
$2,196,605.10
Over/Under Est: -12.62% -$317,196.40
$2,339,437.00
Over/Under Est: -6.94% -$174,364.50
Amt Left: 6.5% $142,831.90
Over/Under Est: -3.83% -$96,393.15
Amt Left: 10.05% $220,803.25
Delta: -3.33% -$77,971.35
Over/Under Est: -3.22% -$81,034.50
Amt Left: 10.75% $236,161.90
Delta: -0.64% -$15,358.65
$2,722,361.70
Over/Under Est: 8.3% $208,560.20
Amt Left: 23.93% $525,756.60
Delta: -11.90% -$289,594.70
$2,946,879.10
Over/Under Est: 17.23% $433,077.60
Amt Left: 34.16% $750,274.00
Delta: -8.25% -$224,517.40
Over/Under Est: 26.98% $678,326.35
Amt Left: 45.32% $995,522.75
Delta: -8.32% -$245,248.75
Over/Under Est: 35.02% $880,250.07
Amt Left: 54.51% $1,197,446.47
Delta: -6.33% -$201,923.72

Bid Items & Bid Tabulations

25 Total 0 of 25
LAMB  |  US 84  |  LUBBOCK  |  0052-05-047  |  05/05/2022  |  $2,513,801.50  |  STP 2022(493)HES  |  HAZARD ELIM & SAFETY  |  167 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRATIOT CONSTRUCTION, LTD.
MIJELUM, L.L.C.
SCR CIVIL CONSTRUCTION, LLC
MASSANA CONSTRUCTION INC.
HJC FARMS, INC.
ALTUS CONSTRUCTION LLC
O. TREVINO CONSTRUCTION, LLC
ALLEN BUTLER CONSTRUCTION, INC.
OBLITERATING ABANDONED ROAD
STA 15.000 $2,000.000 $1,200.000 $2,500.000 $3,400.000 $2,250.000 $4,000.000 $3,288.950 $3,200.000 $2,995.000
BACKFILL (TY B)
STA 526.350 $250.000 $173.000 $100.000 $60.000 $90.000 $175.000 $241.920 $110.000 $554.500
BLADING
STA 526.350 $100.000 $173.000 $100.000 $75.000 $90.000 $150.000 $197.340 $470.000 $374.500
FOG SEAL (CSS-1H)
GAL 164.000 $5.000 $25.000 $5.000 $26.000 $10.000 $5.000 $11.330 $8.000 $16.500
RIPRAP (CONC) (CL A )
CY 2.310 $400.000 $1,350.000 $550.000 $1,000.000 $1,150.000 $475.000 $920.910 $2,500.000 $2,293.000
RIPRAP (MOW STRIP)(5 IN)
CY 2,436.800 $400.000 $365.000 $510.000 $477.000 $355.000 $475.000 $413.570 $444.500 $434.500
MOBILIZATION
LS 1.000 $229,000.000 $275,000.000 $1.000 $98,500.000 $268,007.500 $237,880.000 $282,849.410 $310,000.000 $393,236.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $1.000 $2,500.000 $4,300.000 $8,500.000 $1,615.000 $19,733.680 $20,000.000 $3,286.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.000 $50.000 $10.500 $100.000 $50.000 $37.000 $50.000 $101.640 $51.000 $87.750
CONSTRUCTION EXITS (REMOVE)
SY 111.000 $10.000 $10.500 $10.000 $16.000 $24.000 $8.000 $13.160 $11.500 $25.000
SANDBAGS FOR EROSION CONTROL
EA 70.000 $15.000 $3.000 $10.000 $44.000 $7.000 $12.000 $26.310 $14.000 $37.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,260.000 $10.000 $6.000 $15.000 $8.000 $7.000 $5.000 $6.110 $8.000 $9.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,135.000 $1.000 $2.500 $0.500 $2.000 $2.000 $1.000 $1.220 $2.250 $2.650
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 4,100.000 $5.000 $1.000 $2.500 $3.000 $1.100 $1.000 $1.250 $1.100 $1.800
CABLE BARRIER SYSTEM (TL-4)
LF 51,590.000 $13.000 $12.500 $12.000 $12.750 $13.000 $14.830 $16.230 $15.000 $17.500
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 38.000 $3,000.000 $3,250.000 $2,700.000 $2,900.000 $7,500.000 $4,415.000 $3,381.280 $5,500.000 $5,220.000
REMOVE SM RD SN SUP&AM
EA 8.000 $100.000 $55.000 $100.000 $200.000 $115.000 $100.000 $210.640 $170.000 $197.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 38.000 $125.000 $95.000 $500.000 $110.000 $75.000 $148.500 $157.870 $120.000 $138.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,100.000 $3.000 $2.500 $8.000 $2.350 $2.100 $0.500 $2.760 $2.500 $2.750
ELIM EXT PAV MRK & MRKS (8")
LF 550.000 $3.000 $6.000 $10.000 $5.600 $5.000 $1.000 $6.580 $6.000 $6.550
FULL - WIDTH MOWING
CYC 2.000 $7,000.000 $6,400.000 $5,000.000 $6,800.000 $6,325.000 $3,500.000 $8,321.030 $7,165.000 $8,310.000
LITTER REMOVAL
CYC 1.000 $2,000.000 $2,000.000 $2,800.000 $3,000.000 $2,760.000 $1,500.000 $3,631.000 $3,125.000 $3,626.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 634.000 $50.000 $1.000 $50.000 $50.000 $15.000 $50.000 $78.930 $148.000 $89.750
TMA (STATIONARY)
DAY 334.000 $200.000 $1.000 $100.000 $200.000 $125.000 $150.000 $157.870 $148.000 $150.000
TMA (MOBILE OPERATION)
DAY 45.000 $300.000 $1.000 $200.000 $800.000 $135.000 $450.000 $184.180 $500.000 $1,498.000
Totals: $2,513,801.500 $2,196,605.100 $2,339,437.000 $2,417,408.350 $2,432,767.000 $2,722,361.700 $2,946,879.119 $3,192,127.850 $3,394,051.580