Job Info for 0221-01-083

County: LAMAR Highway: BU 271B Date: 11/06/2024 (17 days ago) Engineer's Estimate: $2,535,516 Control Number: 0221-01-083
Project: F 2025(206) District: PARIS Time: 275 WORKING DAYS Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Bidder's List

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,535,515.90
THK CONSTRUCTION LLC   $2,222,428.62 1
-12.35% | -$313,087.28
GARRET SHIELDS INFRASTRUCTURE   $2,233,650.90 2
-11.91% | -$301,865.00
0.5% | $11,222.28
PROJECT ALLIED RESOURCES, LLC   $2,357,713.84 3
-7.01% | -$177,802.06
6.09% | $135,285.22
5.55% | $124,062.94
TI-ZACK CONCRETE, LLC   $2,368,610.39 4
-6.58% | -$166,905.51
6.58% | $146,181.77
0.46% | $10,896.55
RB CONTRACTING, LLC   $2,611,437.51 5
2.99% | $75,921.61
17.5% | $389,008.89
10.25% | $242,827.12
STX CIVIL   $3,003,977.46 6
18.48% | $468,461.56
35.17% | $781,548.84
15.03% | $392,539.95
FNH CONSTRUCTION, LLC   $3,245,844.60 7
28.02% | $710,328.70
46.05% | $1,023,415.98
8.05% | $241,867.14
C. E. BARKER, LTD.   $3,623,742.78 8
42.92% | $1,088,226.88
63.05% | $1,401,314.16
11.64% | $377,898.18
SKYLINE BRIDGE LLC   $4,134,142.33 9
63.05% | $1,598,626.43
86.02% | $1,911,713.71
14.08% | $510,399.55

Bid Items

Items: 37, 0 filtered
LAMAR BU 271B  |  PARIS  |  0221-01-083  |  11/06/2024  |  $2,535,516  |  F 2025(206)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  275 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate THK CONSTRUCTION LLC GARRET SHIELDS INFRASTRUCTURE PROJECT ALLIED RESOURCES, LLC TI-ZACK CONCRETE, LLC RB CONTRACTING, LLC STX CIVIL FNH CONSTRUCTION, LLC C. E. BARKER, LTD. SKYLINE BRIDGE LLC
100 7002 PREPARING ROW STA 106.510 $1,250.000 $700.000 $500.000 $940.000 $110.000 $1,000.000 $4,000.000 $2,000.000 $3,400.000 $1,000.000
100 7003 PREP ROW (TREE REMOVE) (0"-12" DIA) EA 26.000 $625.000 $500.000 $500.000 $614.000 $550.000 $780.000 $700.000 $2,500.000 $1,088.140 $2,000.000
100 7005 PREP ROW (TREE REMOVE) (24"-36" DIA) EA 8.000 $2,000.000 $1,000.000 $1,000.000 $1,590.000 $2,750.000 $1,600.000 $2,000.000 $10,000.000 $1,568.200 $4,000.000
104 7011 REMOV CONC (DRIVEWAYS) SY 600.000 $20.000 $25.000 $20.000 $24.000 $31.920 $40.000 $50.000 $30.000 $32.000 $25.000
104 7013 REMOV CONC (SIDEWALK, RAMP OR SUP) SY 600.000 $20.000 $25.000 $20.000 $20.800 $31.920 $40.000 $50.000 $30.000 $41.610 $25.000
104 7046 REMOV CONC (MISC) SY 600.000 $20.000 $20.000 $20.000 $24.000 $15.960 $40.000 $50.000 $30.000 $60.810 $20.000
110 7001 EXCAV (ROADWAY) CY 1,144.530 $50.000 $20.000 $50.000 $24.600 $83.670 $20.000 $50.000 $50.000 $28.800 $30.000
132 7003 EMBANK (FNL)(OC)(TY B) CY 1,837.300 $75.000 $20.000 $60.000 $34.400 $73.120 $40.000 $50.000 $100.000 $54.410 $50.000
162 7002 BLOCK SODDING SY 11,886.000 $14.000 $5.840 $9.000 $8.100 $7.700 $12.000 $10.000 $10.000 $10.880 $8.000
168 7001 VEGETATIVE WATERING TGL 66.562 $200.000 $20.000 $200.000 $71.000 $1.100 $55.000 $80.000 $50.000 $92.950 $15.000
341 7064 D-GR HMA TY-D PG 64-22 (EXEMPT) TON 10.000 $300.000 $300.000 $200.000 $352.000 $385.000 $205.000 $1,000.000 $500.000 $352.450 $500.000
400 7008 CUT & RESTORE ASPH PAVING SY 600.000 $175.000 $150.000 $100.000 $124.000 $104.500 $210.000 $250.000 $200.000 $334.440 $150.000
422 7012 BRIDGE SIDEWALK SF 40.000 $40.000 $130.000 $120.000 $353.000 $106.860 $165.000 $225.000 $100.000 $59.530 $800.000
432 7043 RIPRAP (STONE PROTECTION)(18 IN) CY 137.000 $110.000 $200.000 $300.000 $231.000 $110.000 $200.000 $280.000 $185.000 $249.630 $300.000
450 7062 RAIL (HANDRAIL)(TY E) LF 1,157.000 $250.000 $136.080 $180.000 $187.000 $143.760 $180.000 $190.000 $185.000 $167.300 $500.000
462 7064 CONC BOX CULV (5 FT X 5 FT)(EXTEND) LF 69.000 $1,200.000 $1,150.000 $1,000.000 $1,130.000 $1,650.000 $1,000.000 $1,250.000 $600.000 $1,746.650 $3,000.000
462 7074 CONC BOX CULV (7 FT X 7 FT)(EXTEND) LF 18.000 $2,000.000 $1,200.000 $1,000.000 $1,450.000 $1,650.000 $2,250.000 $1,350.000 $1,000.000 $2,192.150 $5,000.000
466 7177 WINGWALL (PW - 1) (HW=7 FT) EA 1.500 $30,000.000 $60,000.000 $15,000.000 $31,100.000 $38,500.000 $32,000.000 $60,000.000 $25,000.000 $38,404.800 $50,000.000
466 7179 WINGWALL (PW - 1) (HW=9 FT) EA 0.500 $50,000.000 $80,000.000 $40,000.000 $42,800.000 $55,000.000 $50,000.000 $80,000.000 $65,000.000 $65,928.240 $75,000.000
500 7001 MOBILIZATION LS 1.000 $222,320.000 $200,000.000 $200,000.000 $227,000.000 $226,627.910 $240,000.000 $235,000.000 $300,000.000 $329,428.000 $250,000.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 $5,000.000 $10,008.360 $5,000.000 $3,110.000 $2,750.000 $2,200.000 $4,000.000 $8,500.000 $9,601.200 $10,000.000
503 7002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $7,500.000 $25,000.000 $1,000.000 $15,200.000 $1.100 $15,000.000 $7,500.000 $16,500.000 $22,082.760 $20,000.000
505 7001 TMA (STATIONARY) DAY 300.000 $300.000 $250.000 $300.000 $202.000 $1.100 $465.000 $250.000 $250.000 $192.020 $500.000
505 7003 TMA (MOBILE OPERATION) DAY 150.000 $350.000 $250.000 $300.000 $101.000 $1.100 $350.000 $150.000 $550.000 $704.090 $500.000
506 7039 TEMP SEDMT CONT FENCE (INSTALL) LF 60.000 $20.000 $54.000 $6.000 $7.300 $11.000 $8.000 $8.000 $4.000 $6.400 $5.000
506 7041 TEMP SEDMT CONT FENCE (REMOVE) LF 60.000 $10.000 $27.000 $1.000 $2.190 $1.100 $8.000 $2.000 $2.000 $2.560 $2.000
506 7043 BIODEG EROSN CONT LOGS (INSTL) (8") LF 100.000 $20.000 $10.800 $10.000 $11.800 $11.000 $15.000 $10.000 $18.000 $8.000 $12.000
506 7046 BIODEG EROSN CONT LOGS (REMOVE) LF 100.000 $10.000 $10.800 $1.000 $5.400 $1.100 $15.000 $2.000 $9.000 $2.880 $6.000
530 7006 DRIVEWAYS (CONC) SY 1,685.000 $105.000 $100.000 $120.000 $118.000 $116.250 $120.000 $135.000 $95.000 $132.450 $250.000
530 7010 DRIVEWAYS (ACP) SY 710.000 $75.000 $90.000 $100.000 $62.000 $99.000 $95.000 $90.000 $55.000 $290.240 $150.000
531 7002 CONC SIDEWALKS (5") SY 6,037.000 $80.000 $90.000 $90.000 $104.000 $110.620 $107.000 $95.000 $65.000 $147.070 $100.000
531 7008 CURB RAMPS (TY 5) EA 1.000 $3,400.000 $3,500.000 $3,000.000 $3,510.000 $2,326.310 $3,500.000 $5,000.000 $3,250.000 $3,291.840 $10,000.000
531 7010 CURB RAMPS (TY 7) EA 22.000 $2,800.000 $3,500.000 $3,000.000 $3,510.000 $2,326.310 $3,300.000 $4,000.000 $3,250.000 $2,880.360 $15,000.000
531 7026 CONCRETE SIDEWALK (RETAINING WALL) CY 126.590 $700.000 $150.000 $500.000 $961.000 $1,485.880 $700.000 $900.000 $5,000.000 $576.070 $2,500.000
644 7065 RELOCATE SM RD SN SUP&AM TY 10BWG EA 23.000 $600.000 $621.000 $500.000 $727.000 $495.000 $750.000 $750.000 $1,100.000 $761.700 $1,500.000
644 7067 RELOCATE SM RD SN SUP&AM TY S80 EA 1.000 $700.000 $696.600 $500.000 $1,130.000 $495.000 $750.000 $750.000 $1,000.000 $761.700 $2,000.000
658 7058 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 8.000 $100.000 $78.300 $80.000 $94.000 $495.000 $60.000 $200.000 $100.000 $70.410 $200.000
Totals: $2,535,515.90 $2,222,428.62 $2,233,650.90 $2,357,713.85 $2,368,610.42 $2,611,437.51 $3,003,977.46 $3,245,844.60 $3,623,742.80 $4,134,142.33