County: LA SALLE Highway: FM 469 Date: 08/02/2024 (3 months ago) Engineer's Estimate: $14,758,446 Control Number: 0852-02-013
Project: C 852-2-13 District: LAREDO Time: 580 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $14,758,445.79
J. CARROLL WEAVER, INC.   $12,342,227.72 1
-16.37% | -$2,416,218.07
ANDERSON COLUMBIA CO., INC.   $12,348,481.24 2
-16.33% | -$2,409,964.55
0.05% | $6,253.52
HUNTER INDUSTRIES, LTD.   $12,825,010.32 3
-13.1% | -$1,933,435.47
3.91% | $482,782.60
3.86% | $476,529.08
TEXAS MATERIALS GROUP, INC.   $13,797,058.53 4
-6.51% | -$961,387.26
11.79% | $1,454,830.81
7.58% | $972,048.21
CK NEWBERRY, LLC   $13,999,639.30 5
-5.14% | -$758,806.49
13.43% | $1,657,411.58
1.47% | $202,580.77
Subcontractor Percentage Amount
ANDERSON COLUMBIA CO., INC. 58.91% $7,270,806.35
ACEE CONSTRUCTION LLC. 3.92% $483,815.33
HIGHWAY BARRICADES AND SERVICES, LLC 1.10% $135,764.50
4E TREE WORX LLC 0.58% $71,584.92
MURRAY CONSTRUCTION 0.47% $58,008.47
Total: 64.98% $8,019,979.57

Bid Items

Items: 74, 0 filtered
LA SALLE FM 469  |  LAREDO  |  0852-02-013  |  08/02/2024  |  $14,758,446  |  C 852-2-13  |  REHAB EXIST ROADWAY  |  580 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate J. CARROLL WEAVER, INC. ANDERSON COLUMBIA CO., INC. HUNTER INDUSTRIES, LTD. TEXAS MATERIALS GROUP, INC. CK NEWBERRY, LLC
100 6002 PREPARING ROW STA 325.000 $600.000 $133.200 $400.000 $661.400 $300.000 $500.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 86.000 $45.000 $29.520 $30.000 $29.300 $25.000 $50.000
110 6001 EXCAVATION (ROADWAY) CY 34,649.000 $15.000 $13.170 $3.500 $10.500 $27.000 $10.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 325.000 $600.000 $265.280 $1,000.000 $388.500 $960.000 $225.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 10,939.000 $35.000 $5.410 $22.000 $10.600 $28.000 $11.000
164 6034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC 22.400 $700.000 $888.000 $1,351.540 $1,315.320 $1,202.000 $1,200.000
275 6001 CEMENT TON 2,196.000 $262.000 $215.180 $200.000 $209.000 $209.000 $200.000
275 6006 CEMENT TREAT (EXIST MATL) (10") SY 133,025.000 $4.000 $1.750 $2.760 $2.600 $2.700 $2.250
292 6022 ASPHALT STAB BASE (GR 1)(PG 64) TON 44,674.000 $115.000 $119.870 $108.000 $96.400 $97.400 $95.000
310 6012 PRIME COAT (RC-250) GAL 24,120.000 $5.000 $4.890 $5.200 $5.240 $4.570 $5.000
316 6128 AGGR(TY-PB GR-5 SAC-A) CY 862.000 $145.000 $208.590 $220.000 $160.020 $240.000 $200.000
400 6005 CEM STABIL BKFL CY 315.000 $190.000 $126.530 $150.000 $470.170 $197.000 $200.000
403 6001 TEMPORARY SPL SHORING SF 665.000 $27.500 $13.320 $20.000 $4.680 $58.000 $25.000
432 6009 RIPRAP (CONC) (CL B) (4") CY 26.000 $300.000 $1,332.000 $525.000 $850.000 $985.000 $800.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 28.000 $240.000 $333.000 $200.000 $215.000 $275.000 $300.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 42.000 $770.000 $777.000 $525.000 $825.000 $840.000 $800.000
450 6018 RAIL (TY T631) LF 80.000 $112.000 $94.350 $120.000 $112.500 $105.000 $125.000
462 6006 CONC BOX CULV (5 FT X 2 FT) LF 666.000 $653.000 $488.520 $500.000 $600.000 $565.000 $725.000
462 6096 CONC BOX CULV (8 FT X 3 FT) LF 68.000 $755.000 $1,173.750 $1,000.000 $1,100.000 $913.000 $1,325.000
464 6005 RC PIPE (CL III)(24 IN) LF 30.000 $250.000 $88.520 $94.000 $160.000 $141.000 $225.000
464 6046 RC PIPE (ARCH)(CL IV)(DES 3) LF 233.000 $430.000 $225.250 $274.000 $350.000 $302.000 $325.000
464 6084 RC PIPE (ARCH)(CL IV)(DES 1) LF 182.000 $296.000 $200.600 $234.000 $250.000 $222.000 $350.000
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 2.000 $15,000.000 $15,540.000 $16,000.000 $18,000.000 $23,800.000 $25,000.000
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 28.000 $5,500.000 $11,655.000 $5,500.000 $5,800.000 $8,900.000 $12,500.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $1,690.000 $3,885.000 $2,000.000 $4,800.000 $2,950.000 $4,000.000
467 6519 SET (TY II) (DES 1) (RCP) (6: 1) (P) EA 2.000 $2,300.000 $2,775.000 $2,000.000 $3,800.000 $3,450.000 $4,500.000
467 6542 SET (TY II) (DES 3) (RCP) (4: 1) (C) EA 10.000 $2,600.000 $3,330.000 $2,800.000 $4,600.000 $4,850.000 $5,000.000
496 6004 REMOV STR (SET) EA 38.000 $590.000 $423.080 $150.000 $750.000 $640.000 $1,500.000
496 6016 REMOV STR (PIPE) EA 22.000 $280.000 $461.540 $300.000 $1,250.000 $1,200.000 $1,500.000
500 6001 MOBILIZATION LS 1.000 $1,341,326.890 $566,000.000 $750,000.000 $1,144,404.550 $1,375,000.000 $1,300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 29.000 $4,500.000 $1,665.000 $1,500.000 $4,802.840 $9,700.000 $19,500.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 265.000 $71.000 $72.150 $74.000 $100.870 $93.000 $95.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 265.000 $30.000 $27.750 $38.000 $12.720 $15.000 $12.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,210.000 $5.200 $4.440 $3.500 $4.890 $4.500 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,210.000 $2.730 $0.560 $2.000 $1.050 $2.000 $1.000
508 6001 CONSTRUCTING DETOURS SY 16,247.000 $90.000 $33.910 $41.000 $41.400 $42.000 $65.000
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 960.000 $89.000 $85.770 $78.000 $96.000 $70.000 $150.000
510 6004 ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG) DAY 600.000 $185.000 $149.850 $200.000 $492.130 $25.000 $250.000
512 6072 PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL) LF 450.000 $73.000 $36.450 $23.000 $85.000 $38.000 $100.000
512 6074 PTB (MOVE)(SGL SLP)(TY 1) OR (STL) LF 8,550.000 $6.500 $13.710 $13.000 $52.000 $22.000 $30.000
512 6076 PTB (REMOVE)(SGL SLP)(TY 1) OR (STL) LF 450.000 $14.000 $36.450 $11.000 $50.000 $33.000 $50.000
530 6003 INTERSECTIONS (SURF TREAT) SY 1,048.000 $50.000 $9.660 $100.000 $48.300 $63.000 $85.000
530 6004 DRIVEWAYS (CONC) SY 135.000 $120.000 $138.750 $140.000 $120.000 $175.000 $125.000
530 6006 DRIVEWAYS (SURF TREAT) SY 2,200.000 $45.000 $9.650 $100.000 $48.300 $61.000 $95.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 64,970.000 $0.130 $0.220 $0.150 $0.150 $0.110 $0.150
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 32,485.000 $0.130 $0.220 $0.150 $0.160 $0.110 $0.150
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 625.000 $28.000 $27.750 $25.000 $23.300 $28.250 $30.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $4,150.000 $3,219.000 $3,600.000 $3,400.000 $3,100.000 $3,100.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 30.000 $1,370.000 $1,665.000 $800.000 $900.000 $1,100.000 $600.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $911.000 $555.000 $900.000 $875.000 $725.000 $700.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $9,000.000 $8,325.000 $7,400.000 $8,125.000 $8,000.000 $9,500.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 4.000 $375.000 $199.800 $370.000 $180.000 $350.000 $200.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 4.000 $650.000 $666.000 $630.000 $600.000 $590.000 $600.000
617 6002 TEMP RD IL (RD IL ASM) MO 29.000 $3,360.000 $3,330.000 $1,100.000 $762.840 $1,800.000 $3,000.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 76.000 $695.000 $638.250 $650.000 $575.000 $615.000 $575.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1.000 $1,100.000 $1,054.500 $910.000 $800.000 $855.000 $800.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $1,200.000 $1,054.500 $950.000 $950.000 $895.000 $950.000
644 6076 REMOVE SM RD SN SUP&AM EA 80.000 $81.000 $88.800 $75.000 $100.000 $70.000 $100.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 10.000 $47.300 $49.950 $38.000 $45.000 $35.000 $40.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 20.000 $75.000 $88.800 $155.000 $80.000 $145.000 $80.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 3,243.000 $1.700 $1.110 $2.000 $1.690 $1.750 $1.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 24.000 $8.120 $55.500 $53.000 $50.000 $50.000 $17.000
666 6225 PAVEMENT SEALER 6" LF 217,908.000 $0.340 $0.240 $0.250 $0.220 $0.220 $0.250
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 64,987.000 $0.680 $0.730 $0.700 $0.660 $0.660 $0.700
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 4,174.000 $0.850 $0.980 $1.000 $0.880 $0.880 $0.700
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 39,793.000 $0.680 $0.730 $0.700 $0.660 $0.660 $0.700
672 6009 REFL PAV MRKR TY II-A-A EA 707.000 $2.850 $5.550 $6.000 $5.000 $5.000 $5.000
730 6106 STRIP MOWING CYC 3.000 $3,100.000 $5,550.000 $2,300.000 $4,880.000 $2,500.000 $5,000.000
730 6107 FULL - WIDTH MOWING CYC 3.000 $3,500.000 $7,770.000 $2,500.000 $6,710.000 $3,800.000 $6,500.000
3076 6032 D-GR HMA TY-C SAC-A PG76-22 TON 13,508.000 $130.000 $156.910 $140.000 $127.300 $145.000 $145.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $12,175.000 $6,105.000 $30,000.000 $10,000.000 $18,000.000 $25,000.000
6158 6001 TMSP RADAR SPEED CONTROL MONITOR EA 2.000 $11,000.000 $12,210.000 $11,000.000 $12,000.000 $10,875.000 $15,000.000
6185 6002 TMA (STATIONARY) DAY 510.000 $276.000 $72.150 $188.000 $350.000 $200.000 $300.000
6185 6003 TMA (MOBILE OPERATION) HR 920.000 $80.000 $16.650 $66.000 $95.000 $80.000 $25.000
Totals: $14,758,445.79 $12,342,227.72 $12,348,481.25 $12,825,010.33 $13,797,058.53 $13,999,639.30