|
|
PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
1.000
|
$400.000
|
$2,000.000
|
$465.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
100.000
|
$25.000
|
$30.000
|
$29.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
603.000
|
$15.000
|
$30.000
|
$36.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
431.000
|
$13.000
|
$30.000
|
$24.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
83.000
|
$12.000
|
$30.000
|
$23.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
13.300
|
$35.000
|
$60.000
|
$29.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
33.000
|
$20.000
|
$30.000
|
$29.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
699.000
|
$12.000
|
$8.500
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
1,184.000
|
$5.000
|
$8.500
|
$9.200
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
3,500.000
|
$7.000
|
$8.500
|
$12.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
43.000
|
$35.000
|
$58.000
|
$51.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
381.000
|
$250.000
|
$325.000
|
$335.000
|
|
|
BLADING
|
HR
|
38.000
|
$150.000
|
$135.000
|
$155.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
18.500
|
$315.000
|
$450.000
|
$430.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
9.200
|
$340.000
|
$420.000
|
$370.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
9.200
|
$340.000
|
$460.000
|
$440.000
|
|
|
VEGETATIVE WATERING
|
MG
|
722.000
|
$21.000
|
$24.000
|
$30.500
|
|
|
FL BS (CMP IN PLC)(TYB GR1-2)(FNAL POS)
|
CY
|
45.000
|
$85.000
|
$225.000
|
$145.000
|
|
|
CEMENT
|
TON
|
2,225.000
|
$155.000
|
$190.000
|
$190.000
|
|
|
CEMENT TREAT (SUBGRADE)(9")
|
SY
|
5,383.000
|
$5.000
|
$8.000
|
$12.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(11")
|
SY
|
123,983.000
|
$2.000
|
$4.000
|
$4.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
26,025.000
|
$3.800
|
$5.100
|
$5.650
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
16,254.000
|
$2.800
|
$3.500
|
$3.800
|
|
|
ASPH (AC-5)
|
GAL
|
37,427.000
|
$3.500
|
$4.200
|
$6.250
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
999.000
|
$240.000
|
$185.000
|
$310.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-28
|
TON
|
914.000
|
$110.000
|
$190.000
|
$215.000
|
|
|
D-GR HMA TY-D SAC-A PG 76-28
|
TON
|
22,630.000
|
$105.000
|
$98.250
|
$111.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
5,966.000
|
$1.500
|
$2.200
|
$2.050
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
3,500.000
|
$2.000
|
$7.000
|
$4.300
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
1,152.000
|
$5.000
|
$7.500
|
$9.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
127,502.000
|
$1.900
|
$1.000
|
$1.750
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
5,383.000
|
$90.000
|
$97.000
|
$130.000
|
|
|
CL A CONC (MISC)
|
CY
|
170.000
|
$600.000
|
$530.000
|
$465.000
|
|
|
CL C CONC (INLET)
|
CY
|
1.000
|
$1,000.000
|
$2,500.000
|
$2,900.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
120.000
|
$125.000
|
$140.000
|
$145.000
|
|
|
GRATE & FRAME
|
EA
|
3.000
|
$1,200.000
|
$2,000.000
|
$2,300.000
|
|
|
RING & COVER
|
EA
|
2.000
|
$1,300.000
|
$1,300.000
|
$1,700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$540,000.000
|
$650,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$8,500.000
|
$16,000.000
|
$21,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
500.000
|
$5.000
|
$7.500
|
$5.800
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$6,000.000
|
$6,000.000
|
$7,000.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,342.000
|
$35.000
|
$55.000
|
$23.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
641.000
|
$80.000
|
$110.000
|
$75.500
|
|
|
CONC SIDEWALKS (5")
|
SY
|
121.000
|
$87.000
|
$83.000
|
$73.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
2,067.000
|
$60.000
|
$70.000
|
$75.500
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$2,000.000
|
$2,500.000
|
$1,700.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
6.000
|
$2,000.000
|
$2,500.000
|
$2,100.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
2.000
|
$2,200.000
|
$2,500.000
|
$1,700.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
6.000
|
$2,000.000
|
$2,500.000
|
$1,700.000
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
11.300
|
$800.000
|
$180.000
|
$350.000
|
|
|
CONCRETE RAMP WITH WALL
|
CY
|
16.500
|
$3,000.000
|
$650.000
|
$580.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
69,782.000
|
$0.150
|
$0.120
|
$0.190
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
34,672.000
|
$0.200
|
$0.120
|
$0.290
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,000.000
|
$1,300.000
|
$1,200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
12.000
|
$630.000
|
$550.000
|
$870.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
270.000
|
$4.500
|
$3.400
|
$3.750
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
300.000
|
$4.000
|
$2.400
|
$2.600
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
360.000
|
$4.000
|
$2.400
|
$2.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
500.000
|
$1.000
|
$0.600
|
$1.050
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
5,400.000
|
$1.000
|
$0.600
|
$1.400
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
122.000
|
$1.500
|
$0.900
|
$0.980
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
655.000
|
$1.000
|
$0.900
|
$0.980
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
320.000
|
$4.000
|
$4.300
|
$4.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
66.000
|
$8.000
|
$8.500
|
$9.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
10.000
|
$115.000
|
$160.000
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$200.000
|
$210.000
|
$230.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
45,850.000
|
$0.200
|
$0.170
|
$0.190
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
72.000
|
$4.000
|
$5.300
|
$5.800
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
5,400.000
|
$0.200
|
$0.170
|
$0.190
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,018.000
|
$0.250
|
$0.420
|
$0.460
|
|
|
PAVEMENT SEALER 8"
|
LF
|
330.000
|
$0.500
|
$0.850
|
$0.930
|
|
|
PAVEMENT SEALER 12"
|
LF
|
320.000
|
$0.750
|
$1.300
|
$1.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
52.000
|
$1.500
|
$2.500
|
$2.800
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$11.000
|
$27.000
|
$29.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$16.000
|
$37.000
|
$40.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,795.000
|
$0.250
|
$0.460
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
84,992.000
|
$0.250
|
$0.460
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
8,424.000
|
$0.250
|
$0.460
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
57,970.000
|
$0.250
|
$0.460
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
96.000
|
$2.500
|
$4.500
|
$4.900
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
693.000
|
$2.500
|
$4.500
|
$4.900
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
120,224.000
|
$0.750
|
$0.800
|
$0.870
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,018.000
|
$1.000
|
$1.400
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
330.000
|
$1.500
|
$2.800
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
320.000
|
$2.500
|
$4.100
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
52.000
|
$5.000
|
$8.300
|
$9.050
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$39.000
|
$80.000
|
$87.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$65.000
|
$90.000
|
$98.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$15,000.000
|
$8,700.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$250.000
|
$200.000
|
$510.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
56.000
|
$45.000
|
$95.000
|
$115.000
|
|
Totals: |
$5,995,770.450
|
$6,581,607.800
|
$7,698,483.380
|