Job Info for 0133-03-038

County: KNOX Highway: US 82 Date: 07/08/2020 (4 years ago) Engineer's Estimate: $12,994,556 Control Number: 0133-03-038
Project: NH 2020(738) District: CHILDRESS Time: 320 WORKING DAYS Type: SUPER 2
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $12,994,556.09
A. L. HELMCAMP, INC.   $12,684,227.53 1
-2.39% | -$310,328.56
KIEWIT INFRASTRUCTURE SOUTH CO.   $13,999,705.72 2
7.74% | $1,005,149.63
10.37% | $1,315,478.19
DUININCK, INC.   $15,337,309.93 3
18.03% | $2,342,753.84
20.92% | $2,653,082.40
9.55% | $1,337,604.21
GILVIN-TERRILL, LTD.   $15,734,334.92 4
21.08% | $2,739,778.83
24.05% | $3,050,107.39
2.59% | $397,024.99
RK HALL, LLC   $16,711,646.34 5
28.6% | $3,717,090.25
31.75% | $4,027,418.81
6.21% | $977,311.42
J. LEE MILLIGAN, INC.   $18,711,259.01 6
43.99% | $5,716,702.92
47.52% | $6,027,031.48
11.97% | $1,999,612.67

Bid Items

Items: 71, 0 filtered
KNOX US 82  |  CHILDRESS  |  0133-03-038  |  07/08/2020  |  $12,994,556  |  NH 2020(738)  |  SUPER 2  |  320 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. L. HELMCAMP, INC. KIEWIT INFRASTRUCTURE SOUTH CO. DUININCK, INC. GILVIN-TERRILL, LTD. RK HALL, LLC J. LEE MILLIGAN, INC.
100 6001 PREPARING ROW AC 4.320 $10,000.000 $10,000.000 $4,104.510 $5,200.000 $300.000 $1,460.920 $10,000.000
103 6001 DISPOSAL OF WATER WELLS EA 2.000 $7,500.000 $4,000.000 $9,698.830 $5,200.000 $10,000.000 $8,800.000 $10,000.000
110 6001 EXCAVATION (ROADWAY) CY 32,776.000 $9.000 $7.000 $11.030 $13.000 $8.000 $14.540 $20.000
110 6002 EXCAVATION (CHANNEL) CY 42.000 $25.000 $35.000 $66.870 $52.500 $30.000 $55.790 $45.500
112 6002 SUBGRADE WIDENING (DENS CONT) STA 628.000 $950.000 $545.000 $192.930 $390.000 $400.000 $1,117.630 $550.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 15,471.000 $10.000 $8.000 $7.690 $23.500 $7.000 $12.880 $20.000
134 6004 BACKFILL (TY A OR B) STA 665.000 $153.000 $200.000 $78.720 $120.000 $200.000 $205.530 $100.000
150 6002 BLADING HR 20.000 $130.000 $135.000 $307.320 $380.000 $145.000 $175.920 $475.000
164 6034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC 62.000 $450.000 $300.000 $650.100 $300.000 $750.000 $313.500 $325.000
164 6042 DRILL SEEDING (TEMP) (WARM) AC 31.000 $350.000 $260.000 $619.140 $260.000 $600.000 $275.000 $280.000
164 6044 DRILL SEEDING (TEMP) (COOL) AC 31.000 $400.000 $300.000 $619.140 $300.000 $600.000 $313.500 $325.000
168 6001 VEGETATIVE WATERING MG 2,418.000 $22.000 $5.000 $30.960 $36.000 $25.000 $45.840 $20.000
216 6001 PROOF ROLLING HR 20.000 $90.000 $100.000 $218.210 $155.000 $85.000 $340.210 $130.000
247 6101 FL BS (RDWY DEL) (TY A GR 1-2) (IN VEH) CY 25,227.000 $48.000 $55.000 $68.640 $44.000 $55.000 $47.450 $65.000
251 6185 REWORK BS MATL (TY B)(11")(DENS CONT) SY 122,376.000 $2.100 $0.750 $5.430 $13.500 $3.250 $10.680 $7.400
275 6001 CEMENT TON 628.000 $180.000 $185.000 $191.310 $170.000 $175.000 $185.530 $175.000
275 6055 CEMENT TREAT (EXIST MATL) (DC) (9") SY 44,283.000 $4.200 $4.500 $2.080 $3.400 $2.500 $5.280 $6.400
310 6009 PRIME COAT (MC-30) GAL 24,475.000 $3.500 $4.000 $4.740 $4.050 $3.500 $4.760 $4.500
314 6013 EMULS ASPH (EROSN CONT)(CSS-1H) GAL 58,943.000 $3.150 $3.200 $3.220 $2.750 $3.500 $3.460 $3.750
316 6010 ASPH (AC-5) GAL 48,832.000 $3.800 $2.800 $2.550 $5.000 $3.000 $2.810 $3.500
316 6080 AGGR(TY-B GR-5 SAC-A) CY 979.000 $70.000 $165.000 $154.680 $200.000 $145.000 $279.740 $160.000
354 6084 PLANE ASPH CONC PAV (3" TO 6") SY 284,098.000 $1.850 $1.800 $2.570 $3.250 $3.000 $3.110 $3.550
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 30.000 $360.000 $320.000 $371.480 $315.000 $500.000 $330.000 $333.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 41.000 $390.000 $600.000 $712.010 $600.000 $1,000.000 $632.500 $780.000
462 6045 CONC BOX CULV (3 FT X 2 FT)(EXTEND) LF 22.000 $450.000 $680.000 $804.880 $680.000 $2,000.000 $715.000 $840.000
462 6046 CONC BOX CULV (3 FT X 3 FT)(EXTEND) LF 41.000 $490.000 $720.000 $854.410 $725.000 $2,100.000 $759.000 $890.000
462 6048 CONC BOX CULV (4 FT X 3 FT)(EXTEND) LF 17.000 $515.000 $760.000 $891.560 $755.000 $2,200.000 $792.000 $950.000
467 6106 SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) EA 3.000 $6,600.000 $7,600.000 $8,915.620 $7,500.000 $12,500.000 $7,920.000 $9,250.000
467 6112 SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C) EA 4.000 $7,200.000 $11,000.000 $12,320.890 $10,500.000 $14,500.000 $10,945.000 $12,300.000
467 6144 SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 3.000 $8,000.000 $11,000.000 $13,001.940 $11,000.000 $15,000.000 $11,550.000 $12,900.000
500 6001 MOBILIZATION LS 1.000 $1,178,906.000 $960,000.000 $1,345,632.180 $1,250,000.000 $1,650,000.000 $1,496,396.440 $1,870,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 19.000 $13,000.000 $10,000.000 $13,019.650 $14,500.000 $35,000.000 $13,254.570 $35,000.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 500.000 $30.000 $10.000 $27.240 $23.000 $35.000 $44.000 $50.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 500.000 $6.000 $2.000 $9.140 $10.500 $10.000 $11.000 $7.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 700.000 $4.000 $6.000 $5.720 $4.850 $10.000 $5.080 $10.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 2.000 $5,500.000 $6,900.000 $7,626.530 $7,900.000 $6,000.000 $9,379.780 $12,400.000
530 6002 INTERSECTIONS (ACP) SY 1,080.000 $41.000 $26.000 $67.990 $21.000 $47.660 $25.900 $26.500
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 126,100.000 $0.100 $0.120 $0.150 $0.140 $0.190 $0.180 $0.200
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 63,050.000 $0.100 $0.120 $0.170 $0.120 $0.300 $0.150 $0.200
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 650.000 $25.000 $23.000 $31.330 $23.000 $40.000 $24.200 $28.300
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,200.000 $2,600.000 $3,900.580 $2,600.000 $4,200.000 $2,750.000 $3,450.000
552 6003 WIRE FENCE (TY C) LF 18,990.000 $5.000 $1.900 $7.430 $8.400 $20.000 $22.000 $22.200
610 6004 RELOCATE RD IL ASM (TRANS-BASE) EA 3.000 $2,000.000 $3,200.000 $5,159.500 $3,100.000 $3,500.000 $3,300.000 $3,330.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 406.000 $9.500 $22.000 $24.770 $21.000 $20.000 $22.000 $22.200
620 6007 ELEC CONDR (NO.8) BARE LF 406.000 $2.500 $1.600 $1.860 $1.550 $5.000 $1.650 $1.700
620 6008 ELEC CONDR (NO.8) INSULATED LF 812.000 $5.000 $1.900 $2.170 $1.850 $5.000 $1.930 $2.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 2.000 $950.000 $1,600.000 $1,857.420 $1,600.000 $3,500.000 $1,650.000 $1,665.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 4.000 $800.000 $590.000 $693.440 $585.000 $450.000 $616.000 $890.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 8.000 $800.000 $680.000 $792.500 $670.000 $550.000 $704.000 $1,025.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 5.000 $800.000 $950.000 $1,114.450 $945.000 $850.000 $990.000 $1,055.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 32.000 $525.000 $640.000 $742.970 $630.000 $400.000 $660.000 $970.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 9.000 $55.000 $23.000 $27.240 $30.500 $30.000 $31.900 $39.000
666 6006 REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF 12,150.000 $1.500 $0.500 $0.580 $0.490 $0.470 $0.520 $0.950
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 168.000 $5.000 $9.500 $11.140 $9.450 $9.000 $9.900 $10.000
666 6072 REFL PAV MRK TY I(W)(LNDP ARW)(100MIL) EA 10.000 $340.000 $260.000 $309.570 $260.000 $250.000 $275.000 $277.500
666 6182 REFL PAV MRK TY II (W) 24" (SLD) LF 96.000 $10.000 $3.700 $4.330 $3.650 $3.500 $3.850 $3.900
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 12,611.000 $0.300 $0.480 $0.570 $0.480 $0.460 $0.510 $0.510
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 126,100.000 $0.300 $0.480 $0.570 $0.480 $0.460 $0.510 $0.510
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 18,038.000 $0.300 $0.480 $0.570 $0.480 $0.460 $0.510 $0.510
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 115,018.000 $0.300 $0.480 $0.570 $0.480 $0.460 $0.510 $0.510
666 6323 RE PM W/RET REQ TY II (W) 4" (SLD) LF 344,974.000 $0.120 $0.160 $0.190 $0.160 $0.150 $0.170 $0.170
666 6327 RE PM W/RET REQ TY II (Y) 4" (SLD) LF 130,088.000 $0.120 $0.160 $0.190 $0.160 $0.150 $0.170 $0.170
672 6007 REFL PAV MRKR TY I-C EA 3,783.000 $2.500 $3.150 $3.710 $3.150 $3.000 $3.300 $3.350
672 6009 REFL PAV MRKR TY II-A-A EA 7,410.000 $2.500 $3.150 $3.710 $3.150 $3.000 $3.300 $3.350
3076 6009 D-GR HMA TY-B PG70-28 TON 7,265.000 $109.000 $129.000 $87.690 $125.000 $100.000 $114.970 $135.000
3076 6045 D-GR HMA TY-D SAC-A PG70-28 TON 61,456.000 $95.000 $97.000 $95.000 $98.100 $110.000 $106.980 $121.700
3076 6066 TACK COAT GAL 29,796.000 $3.000 $2.800 $2.800 $2.350 $5.000 $4.900 $4.250
6000 6084 REPLACE BREAKAWAY FUSE HOLDER EA 3.000 $350.000 $220.000 $247.660 $210.000 $3,000.000 $220.000 $222.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $11,500.000 $15,000.000 $20,576.500 $10,500.000 $15,000.000 $15,761.090 $24,600.000
6185 6002 TMA (STATIONARY) DAY 245.000 $290.000 $170.000 $376.420 $260.000 $555.000 $417.480 $855.000
6185 6003 TMA (MOBILE OPERATION) HR 280.000 $90.000 $65.000 $89.630 $94.500 $95.000 $90.160 $98.250
Totals: $12,994,556.09 $12,684,227.53 $13,999,705.72 $15,337,309.93 $15,734,334.92 $16,711,646.34 $18,711,259.01