Show Job Controls
Bid Cobra

KLEBERG CR (0916-02-021)

Items: 66

County: KLEBERG
Length: N/A
Highway: CR
District: CORPUS CHRISTI
Control Number: 0916-02-021
DBE Goal: N/A
Project: BR 2023(040)
Guaranty: N/A
Time: 138 WORKING DAYS
Engineer's Estimate: $1,495,011.75
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
LUCIO RAMOS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,495,011.75
$1,830,905.05
Over/Under Est: 22.47% $335,893.30
Over/Under Est: 28.42% $424,881.07
Amt Left: 4.86% $88,987.77
$2,762,823.87
Over/Under Est: 84.8% $1,267,812.12
Amt Left: 50.9% $931,918.82
Delta: -43.91% -$842,931.05
Subcontractor Percentage Amount
LONE STAR EROSION CONTROL 7.83% $143,976.48
CARTHAGE DRILLING, LLC 5.51% $101,316.78
BATTEN DRILLING, INC. 5.38% $98,926.37
TEX-MIX PAVING, LLC 3.75% $68,954.25
AWP SAFETY 2.94% $54,060.13
BROOKE PAVING AND CONSTRUCTION LLC 2.72% $50,014.82
IVY ROD, INC. 0.95% $17,468.41
DCC CONSTRUCTION AND SERVICES, L.L.C. 0.54% $9,929.41
HOUSTON SAWING & DRILLING 0.52% $9,561.66
Total: 30.14% $554,208.31

Bid Items & Bid Tabulations

66 Total 0 of 66
KLEBERG  |  CR  |  CORPUS CHRISTI  |  0916-02-021  |  04/05/2023  |  $1,495,011.75  |  BR 2023(040)  |  BRIDGE REPL  |  138 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
LISKA CONSTRUCTION COMPANY, INC.
FOREMOST PAVING, INC.
PREPARING ROW
STA 9.000 $2,500.000 $1,100.000 $1,110.000 $20,000.000
EXCAVATION (ROADWAY)
CY 313.000 $12.000 $33.000 $21.000 $45.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 347.000 $25.000 $55.000 $20.000 $65.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,042.000 $2.000 $2.200 $3.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 570.000 $1.000 $2.200 $1.000 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 570.000 $1.000 $2.200 $1.000 $1.000
VEGETATIVE WATERING
MG 19.000 $90.000 $110.000 $200.000 $225.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,140.000 $1.250 $11.000 $3.000 $2.000
FL BS (RDWY DEL)(TY A GR 5)
TON 427.000 $20.000 $0.000 $0.000 $0.000
CEMENT TREAT (NEW BASE) (10")
SY 845.000 $20.000 $0.000 $0.000 $0.000
PRIME COAT (MC-30)
GAL 140.000 $12.000 $5.500 $57.000 $25.000
ASPH (MULTI OPTION)
GAL 627.000 $4.400 $11.000 $18.000 $35.000
AGGR (MULTI OPTION)
CY 12.000 $220.530 $550.000 $1,720.000 $150.000
CEM STABIL BKFL
CY 148.000 $170.000 $165.000 $220.000 $200.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,168.000 $62.000 $27.500 $79.000 $0.010
DRILL SHAFT (18 IN)
LF 140.000 $600.000 $253.000 $245.000 $200.000
DRILL SHAFT (36 IN)
LF 280.000 $550.000 $308.000 $455.000 $220.000
CL C CONC (ABUT)(HPC)
CY 61.800 $1,350.000 $1,100.000 $1,560.000 $2,000.000
REINF CONC SLAB
SF 2,600.000 $25.000 $33.000 $37.000 $30.000
APPROACH SLAB
CY 59.700 $730.000 $1,100.000 $665.000 $1,000.000
RETAINING WALL (TEMP WALL)
SF 1,041.000 $75.000 $55.000 $36.000 $0.010
PRESTR CONC GIRDER (TX40)
LF 397.170 $180.000 $275.000 $246.000 $250.000
RIPRAP (CONC)(5 IN)
CY 20.000 $640.000 $165.000 $595.000 $800.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 484.000 $210.000 $165.000 $200.000 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 37.000 $625.000 $550.000 $587.000 $1,200.000
RAIL (TY T223)(HPC)
LF 288.000 $155.000 $275.000 $180.000 $200.000
TYPE A JOINT
LF 70.000 $70.000 $440.000 $40.000 $20.000
RC PIPE (CL III)(18 IN)
LF 34.000 $140.000 $550.000 $135.000 $115.000
RC PIPE (CL III)(36 IN)
LF 54.000 $280.000 $550.000 $550.000 $230.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,800.000 $3,300.000 $2,300.000 $1,400.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $27,500.000 $61,600.000 $120,000.000
REMOV STR (PIPE)
EA 3.000 $1,500.000 $1.100 $500.000 $2,000.000
MOBILIZATION
LS 1.000 $135,910.160 $260,000.000 $227,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,300.000 $4,400.000 $1,500.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 45.000 $45.000 $110.000 $70.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 45.000 $15.000 $11.000 $20.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 67.000 $29.000 $82.500 $70.000 $85.000
CONSTRUCTION EXITS (REMOVE)
SY 67.000 $8.000 $1.100 $20.000 $35.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,115.000 $4.500 $16.500 $5.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,115.000 $1.400 $1.100 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 30.000 $7.000 $55.000 $10.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $2.300 $1.100 $5.000 $7.000
CONSTRUCTING DETOURS
SY 882.000 $110.000 $82.500 $396.000 $1,172.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 9.000 $4,700.000 $4,400.000 $7,000.000 $6,000.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 540.000 $60.000 $220.000 $92.000 $70.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $60.000 $220.000 $36.000 $70.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 460.000 $12.000 $55.000 $19.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $12.000 $55.000 $37.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 540.000 $26.000 $110.000 $25.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $26.000 $55.000 $35.000 $30.000
DRIVEWAYS (SURF TREAT)
SY 37.000 $43.000 $330.000 $90.000 $450.000
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $38.000 $44.000 $29.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,500.000 $3,300.000 $2,500.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,800.000 $4,400.000 $3,500.000 $3,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 1.000 $17,500.000 $38,500.000 $22,000.000 $26,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $250.000 $220.000 $500.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 2.000 $150.000 $220.000 $75.000 $225.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $35.000 $33.000 $40.000 $40.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $25.000 $1.100 $25.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $50.000 $11.000 $40.000 $45.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 40.000 $10.000 $11.000 $38.500 $50.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 2,424.000 $2.000 $5.500 $12.000 $1.800
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 540.000 $75.000 $165.000 $55.000 $65.000
TMA (STATIONARY)
DAY 30.000 $230.000 $275.000 $130.000 $200.000
TMA (MOBILE OPERATION)
HR 8.000 $68.000 $550.000 $125.000 $0.010
1
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 193.000 $131.810 $110.000 $182.000 $350.000
Totals: $1,520,451.750 $1,830,905.050 $1,919,892.820 $2,762,823.870