Job Info for 6470-93-001

County: KIMBLE Highway: US0377 Date: 10/15/2024 (5 weeks ago) Engineer's Estimate: $987,487 Control Number: 6470-93-001
Project: BPM - 647093001 District: SAN ANGELO Time: 180 CALENDAR DAYS Type: BRIDGE PREVENTATIVE MAINTENANCE
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $987,486.87
BK FIELD OPERATIONS LLC   $652,583.00 1
-33.91% | -$334,903.87
PATHFIELD INVESTMENTS LLC   $782,370.00 2
-20.77% | -$205,116.87
19.89% | $129,787.00
ROAD DOCTORS LLC   $788,035.00 3
-20.2% | -$199,451.87
20.76% | $135,452.00
0.72% | $5,665.00
BLACKSMITH VENTURES LLC   $851,150.00 4
-13.81% | -$136,336.87
30.43% | $198,567.00
8.01% | $63,115.00
BECK-REIT & SONS, LTD.   $854,180.00 5
-13.5% | -$133,306.87
30.89% | $201,597.00
0.36% | $3,030.00
B & MS CONSTRUCTION, INC.   $894,625.00 6
-9.4% | -$92,861.87
37.09% | $242,042.00
4.73% | $40,445.00
AAD CONTRACTING INC.   $911,390.00 7
-7.71% | -$76,096.87
39.66% | $258,807.00
1.87% | $16,765.00
MB WESTERN INDUSTRIAL CONTRACTING CO.   $945,610.00 8
-4.24% | -$41,876.87
44.9% | $293,027.00
3.75% | $34,220.00
SCR CIVIL CONSTRUCTION, LLC   $1,034,176.00 9
4.73% | $46,689.13
58.47% | $381,593.00
9.37% | $88,566.00

Bid Items

Items: 16, 0 filtered
KIMBLE US0377  |  SAN ANGELO  |  6470-93-001  |  10/15/2024  |  $987,487  |  BPM - 647093001  |  BRIDGE PREVENT MAINT  |  180 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate BK FIELD OPERATIONS LLC PATHFIELD INVESTMENTS LLC ROAD DOCTORS LLC BLACKSMITH VENTURES LLC BECK-REIT & SONS, LTD. B & MS CONSTRUCTION, INC. AAD CONTRACTING INC. MB WESTERN INDUSTRIAL CONTRACTING CO. SCR CIVIL CONSTRUCTION, LLC
104 7006 REMOV CONC (RIPRAP) SY 267.000 $63.820 $121.000 $150.000 $75.000 $150.000 $100.000 $55.000 $45.000 $55.000 $100.000
104 7047 REMOV CONC (MISC) CY 125.000 $99.320 $150.000 $160.000 $160.000 $150.000 $100.000 $60.000 $60.000 $75.000 $256.000
401 7001 FLOWABLE BACKFILL CY 73.000 $537.490 $500.000 $600.000 $500.000 $1,000.000 $500.000 $500.000 $275.000 $850.000 $1,090.000
429 7005 CONC STR REPAIR(DECK REP (FULL DEPTH)) SF 10.000 $309.000 $1,500.000 $350.000 $1,000.000 $1,000.000 $550.000 $385.000 $350.000 $450.000 $1,895.000
429 7007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 1,550.000 $293.960 $120.000 $170.000 $145.000 $125.000 $210.000 $210.000 $275.000 $225.000 $178.000
429 7009 CONC STR REPAIR (STANDARD) SF 50.000 $354.290 $250.000 $125.000 $450.000 $500.000 $210.000 $190.000 $180.000 $300.000 $178.000
432 7043 RIPRAP (STONE PROTECTION)(18 IN) CY 362.000 $229.270 $200.000 $310.000 $305.000 $300.000 $210.000 $340.000 $200.000 $250.000 $363.000
432 7045 RIPRAP (STONE PROTECTION)(24 IN) CY 450.000 $260.570 $200.000 $325.000 $305.000 $300.000 $210.000 $395.000 $275.000 $275.000 $314.000
480 7001 CLEAN EXIST CULVERTS EA 1.000 $5,712.460 $5,000.000 $5,000.000 $5,000.000 $5,000.000 $12,000.000 $8,500.000 $2,500.000 $10,000.000 $23,693.000
500 7001 MOBILIZATION LS 1.000 $90,000.000 $100,000.000 $75,000.000 $85,000.000 $100,000.000 $135,000.000 $50,000.000 $60,000.000 $90,000.000 $103,400.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,500.000 $1.000 $4,500.000 $2,000.000 $5,000.000 $8,000.000 $4,000.000 $10,000.000 $5,000.000 $10,145.000
503 7001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 60.000 $168.290 $1.000 $100.000 $100.000 $150.000 $175.000 $200.000 $350.000 $100.000 $123.000
505 7001 TMA (STATIONARY) DAY 60.000 $345.700 $1.000 $10.000 $200.000 $500.000 $1.000 $300.000 $350.000 $200.000 $389.000
778 7001 CONCRETE RAIL REPAIR (IN-KIND) LF 22.000 $996.800 $2,200.000 $600.000 $800.000 $1,000.000 $1,200.000 $480.000 $200.000 $2,000.000 $601.000
788 7002 CONCRETE BEAM REPAIR (CFRP) EA 3.000 $15,417.120 $10,000.000 $4,000.000 $19,000.000 $15,000.000 $7,500.000 $22,000.000 $20,000.000 $25,000.000 $24,555.000
7020 7003 GEN DEBRIS REMOVE FROM UNDER BRIDGES CY 40.000 $659.190 $140.000 $200.000 $300.000 $150.000 $300.000 $180.000 $200.000 $250.000 $347.000
Totals: $987,486.87 $652,583.00 $782,370.00 $788,035.00 $851,150.00 $854,180.00 $894,625.00 $911,390.00 $945,610.00 $1,034,176.00