PREPARING ROW
|
STA
|
259.000
|
$15,000.000
|
$14,000.000
|
$6,000.000
|
$53,632.490
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
57,260.000
|
$6.000
|
$7.500
|
$3.750
|
$5.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
498.000
|
$61.000
|
$32.000
|
$6.250
|
$52.410
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
720,790.000
|
$30.000
|
$11.500
|
$26.500
|
$13.500
|
|
|
BACKFILL (TY A)
|
STA
|
89.000
|
$400.000
|
$300.000
|
$1,056.000
|
$419.980
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$50.000
|
$30.000
|
$21.000
|
$907.680
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
594,343.000
|
$0.450
|
$0.250
|
$0.220
|
$0.140
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
297,172.000
|
$0.400
|
$0.300
|
$0.310
|
$0.400
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
297,172.000
|
$0.400
|
$0.300
|
$0.310
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
4,832.000
|
$40.000
|
$55.000
|
$30.000
|
$54.490
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
47,291.000
|
$50.000
|
$45.000
|
$45.000
|
$50.420
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
186,947.000
|
$2.000
|
$1.500
|
$2.250
|
$4.090
|
|
|
CEMENT
|
TON
|
7,337.000
|
$200.000
|
$210.000
|
$209.000
|
$205.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(11")
|
SY
|
65,013.000
|
$3.000
|
$3.250
|
$2.500
|
$3.980
|
|
|
CEM TRT(MX EXST MTL & NEW BS)(14")
|
SY
|
196,263.000
|
$3.000
|
$2.000
|
$3.000
|
$3.990
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
273,006.000
|
$2.750
|
$2.250
|
$2.500
|
$3.230
|
|
|
SLV, HAUL & STKPL RCL APH PV (8 TO 10")
|
SY
|
186,947.000
|
$3.500
|
$4.000
|
$4.750
|
$4.250
|
|
|
PRIME COAT (MC-30)
|
GAL
|
49,883.000
|
$5.500
|
$5.000
|
$6.000
|
$5.150
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(1")
|
SY
|
4,026.000
|
$100.000
|
$30.000
|
$32.000
|
$24.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
21,728.000
|
$20.000
|
$2.500
|
$1.750
|
$2.000
|
|
|
PLAN & TEXT ASPH CONC PAV (1.5")
|
SY
|
3,314.000
|
$6.000
|
$15.000
|
$9.000
|
$2.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
1,052.000
|
$50.000
|
$5.000
|
$134.000
|
$22.600
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
999.000
|
$85.000
|
$5.000
|
$134.000
|
$66.950
|
|
|
CEM STABIL BKFL
|
CY
|
366.000
|
$250.000
|
$300.000
|
$115.000
|
$66.950
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
89.000
|
$125.000
|
$185.000
|
$435.000
|
$431.900
|
|
|
FLOWABLE BACKFILL
|
CY
|
246.000
|
$500.000
|
$200.000
|
$309.000
|
$463.500
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,064.000
|
$20.000
|
$1.000
|
$2.000
|
$2.060
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
3,630.000
|
$200.000
|
$200.000
|
$220.000
|
$214.970
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
21.000
|
$120.000
|
$190.000
|
$190.000
|
$75.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
90.000
|
$180.000
|
$205.000
|
$205.000
|
$145.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
160.000
|
$240.000
|
$250.000
|
$251.000
|
$245.000
|
|
|
CL B CONC (FLUME)
|
CY
|
32.000
|
$700.000
|
$900.000
|
$762.000
|
$614.000
|
|
|
CL C CONC (ABUT)
|
CY
|
276.800
|
$1,800.000
|
$1,800.000
|
$1,450.000
|
$1,606.980
|
|
|
CL C CONC (COLLAR)
|
EA
|
25.000
|
$1,500.000
|
$4,000.000
|
$2,500.000
|
$3,605.000
|
|
|
CL C CONC (MISC)
|
CY
|
76.000
|
$1,000.000
|
$1,400.000
|
$850.000
|
$1,029.670
|
|
|
REINF CONC SLAB
|
SF
|
18,400.000
|
$30.000
|
$30.000
|
$35.000
|
$47.980
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
5,279.000
|
$30.000
|
$25.000
|
$37.000
|
$30.440
|
|
|
RETAINING WALL (MSE) (ASHLAR STONE FIN)
|
SF
|
221,828.000
|
$80.000
|
$110.000
|
$46.500
|
$203.340
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
35,831.000
|
$26.000
|
$42.000
|
$32.500
|
$100.310
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
544.500
|
$250.000
|
$190.000
|
$650.000
|
$366.380
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
594.000
|
$275.000
|
$190.000
|
$800.000
|
$364.420
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,290.000
|
$250.000
|
$210.000
|
$250.000
|
$347.640
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
257.000
|
$500.000
|
$611.000
|
$700.000
|
$611.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
286.000
|
$600.000
|
$635.000
|
$670.000
|
$634.000
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
37.000
|
$300.000
|
$350.000
|
$256.000
|
$325.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
21.000
|
$300.000
|
$350.000
|
$387.000
|
$325.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
555.000
|
$490.000
|
$625.000
|
$801.000
|
$609.000
|
|
|
RAIL (TY SSTR)
|
LF
|
12,400.200
|
$65.000
|
$45.000
|
$64.000
|
$80.210
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
520.000
|
$225.000
|
$300.000
|
$321.000
|
$458.610
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
164.000
|
$600.000
|
$550.000
|
$912.000
|
$864.850
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
816.000
|
$1,000.000
|
$585.000
|
$700.000
|
$1,103.920
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
362.000
|
$1,100.000
|
$650.000
|
$950.000
|
$1,183.380
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
87.000
|
$2,000.000
|
$1,000.000
|
$2,048.000
|
$1,698.140
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
216.000
|
$2,500.000
|
$930.000
|
$1,100.000
|
$1,762.700
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
430.000
|
$100.000
|
$130.000
|
$179.000
|
$91.900
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
8,741.000
|
$115.000
|
$140.000
|
$150.000
|
$111.420
|
|
|
RC PIPE (CL III)(30 IN)(SPL)
|
LF
|
1,548.000
|
$150.000
|
$200.000
|
$165.000
|
$156.820
|
|
|
RC PIPE (CL III)(42 IN)(SPL)
|
LF
|
234.000
|
$275.000
|
$280.000
|
$255.000
|
$297.930
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
20.000
|
$5,000.000
|
$6,000.000
|
$8,736.000
|
$4,296.730
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
4.000
|
$8,000.000
|
$6,700.000
|
$9,748.000
|
$5,899.810
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
15.000
|
$6,500.000
|
$8,500.000
|
$9,207.000
|
$5,172.750
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
4.000
|
$8,700.000
|
$9,500.000
|
$10,571.000
|
$5,927.300
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$10,000.000
|
$10,000.000
|
$11,997.000
|
$8,382.780
|
|
|
INLET (COMPL)(TY MSE1)
|
EA
|
41.000
|
$6,000.000
|
$16,000.000
|
$8,875.000
|
$4,604.100
|
|
|
INLET(COMPL)(WALL)(SPL)
|
EA
|
8.000
|
$6,000.000
|
$9,000.000
|
$14,871.000
|
$14,626.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$9,000.000
|
$14,000.000
|
$13,716.000
|
$18,540.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$11,000.000
|
$15,000.000
|
$15,043.000
|
$18,540.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
3.000
|
$15,000.000
|
$71,000.000
|
$27,953.000
|
$18,540.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$15,000.000
|
$58,000.000
|
$81,501.000
|
$18,540.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$27,000.000
|
$100,000.000
|
$29,151.000
|
$18,540.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
4.000
|
$20,000.000
|
$30,000.000
|
$29,225.000
|
$51,993.960
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,500.000
|
$3,778.000
|
$1,802.500
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$2,300.000
|
$1,900.000
|
$2,953.000
|
$1,905.500
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
13.000
|
$3,000.000
|
$1,800.000
|
$2,573.000
|
$2,060.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$3,000.000
|
$2,400.000
|
$3,384.000
|
$2,214.500
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,000.000
|
$2,500.000
|
$3,672.000
|
$9,424.500
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$4,200.000
|
$3,400.000
|
$3,683.000
|
$9,630.500
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$6,000.000
|
$5,200.000
|
$6,470.000
|
$14,935.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$6,000.000
|
$8,900.000
|
$6,650.000
|
$16,995.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
9.000
|
$10,000.000
|
$2,000.000
|
$3,050.000
|
$10,300.000
|
|
|
REMOV STR (SET)
|
EA
|
30.000
|
$1,500.000
|
$900.000
|
$1,148.000
|
$557.110
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$3,250.000
|
$6,000.000
|
$2,864.000
|
$1,289.200
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,500.000
|
$6,000.000
|
$2,864.000
|
$1,289.200
|
|
|
REMOV STR (PIPE)
|
LF
|
1,195.000
|
$25.000
|
$50.000
|
$58.000
|
$15.590
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
574.000
|
$200.000
|
$420.000
|
$60.000
|
$38.140
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$11,322,867.250
|
$8,000,000.000
|
$7,777,777.000
|
$13,890,817.120
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
43.000
|
$12,000.000
|
$8,500.000
|
$2,777.910
|
$32,265.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,574.000
|
$55.000
|
$57.000
|
$48.000
|
$56.460
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,574.000
|
$15.000
|
$47.000
|
$33.000
|
$17.730
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$50.000
|
$46.000
|
$46.000
|
$53.210
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$15.000
|
$23.000
|
$33.000
|
$14.220
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
49,440.000
|
$3.500
|
$3.500
|
$3.250
|
$3.480
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
49,440.000
|
$1.000
|
$1.500
|
$1.500
|
$1.290
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,500.000
|
$7.500
|
$7.000
|
$7.000
|
$8.840
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,500.000
|
$2.000
|
$1.500
|
$1.500
|
$2.140
|
|
|
CONSTRUCTING DETOURS
|
SY
|
143,642.000
|
$40.000
|
$56.500
|
$69.000
|
$60.330
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
38,940.000
|
$65.000
|
$38.000
|
$80.000
|
$17.700
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
134,910.000
|
$15.000
|
$7.000
|
$5.000
|
$4.930
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
29,040.000
|
$6.000
|
$6.000
|
$22.000
|
$14.280
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
38,940.000
|
$10.000
|
$13.000
|
$10.000
|
$16.730
|
|
|
DRIVEWAYS (ACP)
|
SY
|
500.000
|
$50.000
|
$75.000
|
$67.000
|
$94.010
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
96,720.000
|
$0.150
|
$0.350
|
$0.250
|
$0.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,225.000
|
$25.000
|
$24.000
|
$25.000
|
$26.450
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,650.000
|
$2,100.000
|
$2,273.000
|
$2,168.010
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
9.000
|
$1,650.000
|
$1,400.000
|
$2,380.000
|
$1,266.880
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$6.000
|
$5.000
|
$3.250
|
$2.120
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$180.000
|
$750.000
|
$179.000
|
$212.030
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
24,150.000
|
$15.000
|
$19.000
|
$11.000
|
$17.860
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
12.000
|
$4,000.000
|
$3,800.000
|
$2,975.000
|
$3,922.560
|
|
|
REMOVE CABLE BARRIER
|
LF
|
23,946.000
|
$6.000
|
$5.000
|
$4.090
|
$2.970
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
10.000
|
$400.000
|
$200.000
|
$542.800
|
$386.960
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$3,500.000
|
$2,900.000
|
$2,965.000
|
$3,021.430
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$262.000
|
$318.050
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
25.000
|
$1,300.000
|
$225.000
|
$1,381.000
|
$1,463.010
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
10.000
|
$1,200.000
|
$1,300.000
|
$3,400.000
|
$773.910
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$1,500.000
|
$230.000
|
$693.000
|
$773.910
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$15,000.000
|
$15,000.000
|
$7,948.000
|
$8,194.980
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
9,268.000
|
$70.000
|
$40.000
|
$31.000
|
$42.410
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
4.000
|
$1,350.000
|
$1,650.000
|
$1,640.000
|
$1,600.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
20.000
|
$4,700.000
|
$4,500.000
|
$4,614.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
7,185.000
|
$12.000
|
$12.000
|
$11.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
541.000
|
$33.000
|
$36.000
|
$36.000
|
$35.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
372.000
|
$18.000
|
$31.000
|
$31.000
|
$30.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
8,398.000
|
$1.500
|
$1.600
|
$1.500
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
19,984.000
|
$1.500
|
$1.600
|
$1.500
|
$1.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
16.000
|
$1,000.000
|
$1,125.000
|
$1,128.000
|
$1,100.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
2.000
|
$5,000.000
|
$5,505.000
|
$5,639.000
|
$5,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
852.000
|
$31.000
|
$26.000
|
$27.000
|
$23.900
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
40.000
|
$692.000
|
$815.000
|
$724.000
|
$680.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
9.000
|
$800.000
|
$910.000
|
$778.000
|
$760.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
19.000
|
$806.000
|
$1,050.000
|
$806.000
|
$870.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$875.000
|
$1,150.000
|
$1,009.000
|
$995.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$1,140.000
|
$2,625.000
|
$2,359.000
|
$2,030.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
6.000
|
$4,000.000
|
$7,200.000
|
$3,781.000
|
$3,670.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$80.000
|
$165.000
|
$109.000
|
$80.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
5,008.000
|
$6.250
|
$7.500
|
$7.000
|
$6.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
117.000
|
$40.000
|
$28.000
|
$12.000
|
$21.200
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
12.000
|
$30.000
|
$27.000
|
$12.000
|
$22.260
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
43.000
|
$30.000
|
$53.000
|
$32.000
|
$27.560
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
48.000
|
$30.000
|
$44.000
|
$32.000
|
$27.560
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
60.000
|
$70.000
|
$85.000
|
$64.000
|
$53.010
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
89.000
|
$4.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
129,397.000
|
$0.500
|
$0.350
|
$0.500
|
$0.340
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,814.000
|
$1.000
|
$0.900
|
$1.000
|
$0.880
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
72.000
|
$0.700
|
$16.000
|
$16.000
|
$16.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BKN W/MRKR)
|
LF
|
28,255.000
|
$5.000
|
$0.650
|
$0.500
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
129,181.000
|
$0.500
|
$0.350
|
$0.250
|
$0.340
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
48,564.000
|
$0.250
|
$1.150
|
$1.700
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,185.000
|
$1.500
|
$1.100
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
500.000
|
$6.500
|
$2.250
|
$2.000
|
$2.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
225.000
|
$11.000
|
$16.000
|
$16.000
|
$16.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
16,160.000
|
$0.650
|
$0.900
|
$1.000
|
$0.880
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
68,185.000
|
$0.780
|
$0.800
|
$0.750
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
67,505.000
|
$0.780
|
$0.800
|
$0.750
|
$0.780
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$500.000
|
$500.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
28.000
|
$5.500
|
$7.500
|
$7.500
|
$7.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
987.000
|
$5.500
|
$7.500
|
$7.500
|
$7.500
|
|
|
INSTL TIED CONCRETE EROSN CONTROL MATS
|
SF
|
7,429.000
|
$6.000
|
$18.000
|
$6.000
|
$12.340
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
66,877.000
|
$115.000
|
$118.000
|
$135.000
|
$118.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
10,366.000
|
$130.000
|
$131.000
|
$133.000
|
$133.400
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
19,261.000
|
$120.000
|
$131.000
|
$146.000
|
$126.000
|
|
|
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
|
TON
|
37,126.000
|
$150.000
|
$72.000
|
$135.000
|
$151.000
|
|
|
BONDING COURSE
|
GAL
|
47,230.000
|
$3.500
|
$3.000
|
$8.000
|
$3.000
|
|
|
INTRLCK ART CONC BLKS (4" MIN)
|
SF
|
24,285.000
|
$12.000
|
$35.000
|
$8.000
|
$11.470
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
47,563.000
|
$2.000
|
$1.650
|
$1.670
|
$1.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$22,000.000
|
$8,000.000
|
$23,408.000
|
$31,226.510
|
|
|
TMA (STATIONARY)
|
DAY
|
1,546.000
|
$250.000
|
$25.000
|
$170.000
|
$195.090
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
314.000
|
$450.000
|
$0.010
|
$574.000
|
$195.090
|
|
Totals: |
$106,176,094.300
|
$93,082,026.740
|
$95,073,599.930
|
$138,908,169.006
|