PREPARING ROW
|
STA
|
156.000
|
$15,000.000
|
$8,500.000
|
$2,500.000
|
$16,000.000
|
$4,600.000
|
$42,818.970
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
123,179.000
|
$6.000
|
$4.500
|
$5.000
|
$8.000
|
$10.000
|
$11.740
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
260,474.000
|
$30.000
|
$7.500
|
$19.280
|
$11.000
|
$14.000
|
$48.250
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$50.000
|
$50.000
|
$20.000
|
$26.000
|
$40.000
|
$126.010
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
546,739.000
|
$0.450
|
$0.450
|
$0.460
|
$0.450
|
$0.480
|
$0.440
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
273,370.000
|
$0.400
|
$0.300
|
$0.310
|
$0.500
|
$0.320
|
$0.290
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
273,370.000
|
$0.400
|
$0.300
|
$0.310
|
$0.500
|
$0.320
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
4,444.000
|
$40.000
|
$60.000
|
$30.000
|
$75.250
|
$26.000
|
$68.830
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
33,468.000
|
$50.000
|
$45.000
|
$55.000
|
$55.000
|
$64.000
|
$101.040
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
148,249.000
|
$2.000
|
$1.100
|
$2.100
|
$2.000
|
$5.500
|
$3.840
|
|
|
CEMENT
|
TON
|
4,771.000
|
$200.000
|
$205.000
|
$205.000
|
$201.000
|
$200.000
|
$374.670
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(11")
|
SY
|
21,679.000
|
$3.000
|
$3.750
|
$2.500
|
$2.500
|
$2.100
|
$5.430
|
|
|
CEM TRT(MX EXST MTL & NEW BS)(14")
|
SY
|
146,998.000
|
$3.000
|
$2.250
|
$2.500
|
$2.950
|
$2.600
|
$4.960
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
174,751.000
|
$2.750
|
$2.500
|
$2.000
|
$2.250
|
$2.500
|
$4.650
|
|
|
SLV, HAUL & STKPL RCL APH PV (8 TO 10")
|
SY
|
148,249.000
|
$3.500
|
$4.100
|
$4.000
|
$3.500
|
$8.200
|
$4.600
|
|
|
PRIME COAT (MC-30)
|
GAL
|
32,041.000
|
$5.500
|
$5.000
|
$4.000
|
$6.000
|
$5.600
|
$4.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(1")
|
SY
|
1,470.000
|
$100.000
|
$30.000
|
$30.000
|
$26.000
|
$21.000
|
$45.000
|
|
|
PLAN & TEXT ASPH CONC PAV (1.5")
|
SY
|
1,967.000
|
$6.000
|
$30.000
|
$3.000
|
$6.500
|
$7.000
|
$7.350
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
747.000
|
$50.000
|
$18.000
|
$125.000
|
$115.000
|
$18.000
|
$217.350
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
395.000
|
$85.000
|
$14.000
|
$125.000
|
$115.000
|
$22.000
|
$217.350
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
254.000
|
$125.000
|
$180.000
|
$150.000
|
$350.000
|
$170.000
|
$427.690
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
459.000
|
$20.000
|
$1.000
|
$2.000
|
$15.000
|
$5.000
|
$25.770
|
|
|
TEMPORARY SPL SHORING
|
SF
|
870.000
|
$17.000
|
$1.000
|
$1.000
|
$50.000
|
$24.000
|
$67.980
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
$120.000
|
$185.000
|
$75.000
|
$200.000
|
$190.000
|
$78.240
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
67.000
|
$180.000
|
$200.000
|
$145.000
|
$315.000
|
$300.000
|
$151.260
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
168.000
|
$240.000
|
$240.000
|
$240.000
|
$405.000
|
$385.000
|
$240.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
37.300
|
$500.000
|
$550.000
|
$600.000
|
$650.000
|
$575.000
|
$525.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
59.000
|
$300.000
|
$400.000
|
$450.000
|
$240.000
|
$355.000
|
$355.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
99.000
|
$490.000
|
$500.000
|
$775.000
|
$800.000
|
$500.000
|
$497.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
233.000
|
$400.000
|
$580.000
|
$600.000
|
$677.000
|
$670.000
|
$574.430
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
264.000
|
$700.000
|
$800.000
|
$950.000
|
$1,146.000
|
$1,100.000
|
$1,021.890
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
154.000
|
$100.000
|
$125.000
|
$155.000
|
$99.000
|
$134.000
|
$158.520
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
373.000
|
$115.000
|
$425.000
|
$190.000
|
$167.000
|
$170.000
|
$185.280
|
|
|
RC PIPE (CL III)(30 IN)(SPL)
|
LF
|
248.000
|
$180.000
|
$330.000
|
$190.000
|
$218.000
|
$210.000
|
$261.060
|
|
|
RC PIPE (CL III)(36 IN)(SPL)
|
LF
|
392.000
|
$230.000
|
$280.000
|
$230.000
|
$298.000
|
$300.000
|
$335.170
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$6,500.000
|
$8,500.000
|
$4,800.000
|
$8,358.000
|
$6,000.000
|
$12,021.480
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$8,700.000
|
$9,500.000
|
$5,500.000
|
$9,388.000
|
$8,000.000
|
$16,167.220
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$9,000.000
|
$18,000.000
|
$14,250.000
|
$14,485.000
|
$2,600.000
|
$36,281.100
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$11,000.000
|
$20,000.000
|
$14,750.000
|
$17,170.000
|
$4,200.000
|
$38,823.130
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$12,000.000
|
$30,000.000
|
$15,000.000
|
$21,197.000
|
$4,800.000
|
$42,131.550
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$10,000.000
|
$32,000.000
|
$20,000.000
|
$29,252.000
|
$14,500.000
|
$52,915.170
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$13,000.000
|
$45,000.000
|
$20,000.000
|
$31,266.000
|
$18,000.000
|
$57,341.630
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
4.000
|
$20,000.000
|
$24,000.000
|
$20,000.000
|
$37,978.000
|
$17,000.000
|
$46,592.900
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$2,750.000
|
$1,500.000
|
$1,300.000
|
$2,632.000
|
$2,400.000
|
$4,785.670
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$1,800.000
|
$1,800.000
|
$2,332.000
|
$2,600.000
|
$6,388.700
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,600.000
|
$2,500.000
|
$3,024.000
|
$3,000.000
|
$7,038.370
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$4,200.000
|
$4,900.000
|
$3,200.000
|
$4,411.000
|
$5,400.000
|
$15,039.610
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$4,500.000
|
$8,000.000
|
$8,500.000
|
$5,900.000
|
$5,600.000
|
$21,527.950
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$2,500.000
|
$3,500.000
|
$3,500.000
|
$2,444.000
|
$3,000.000
|
$9,593.250
|
|
|
REMOV STR (SET)
|
EA
|
22.000
|
$1,500.000
|
$600.000
|
$300.000
|
$925.000
|
$530.000
|
$1,882.820
|
|
|
REMOV STR (PIPE)
|
LF
|
760.000
|
$25.000
|
$25.000
|
$15.000
|
$53.000
|
$15.000
|
$36.060
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
162.000
|
$200.000
|
$200.000
|
$60.000
|
$63.000
|
$36.000
|
$142.210
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,321,071.560
|
$3,000,000.000
|
$3,900,000.000
|
$3,814,821.960
|
$4,300,000.000
|
$6,679,760.560
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$12,000.000
|
$7,000.000
|
$4,000.000
|
$12,000.000
|
$6,500.000
|
$31,524.490
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,340.000
|
$55.000
|
$48.000
|
$48.000
|
$70.000
|
$52.000
|
$47.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,340.000
|
$15.000
|
$24.000
|
$32.750
|
$35.000
|
$26.000
|
$23.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$50.000
|
$48.000
|
$25.000
|
$23.000
|
$50.000
|
$44.950
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$15.000
|
$28.000
|
$1.000
|
$9.250
|
$35.000
|
$32.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
39,572.000
|
$3.500
|
$3.250
|
$3.200
|
$4.250
|
$3.500
|
$3.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
39,572.000
|
$1.000
|
$1.500
|
$1.400
|
$1.400
|
$1.500
|
$1.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
25.000
|
$7.500
|
$14.000
|
$50.000
|
$6.000
|
$15.000
|
$14.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
25.000
|
$2.000
|
$6.000
|
$10.000
|
$6.000
|
$6.300
|
$5.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
122,861.000
|
$40.000
|
$64.000
|
$75.000
|
$73.000
|
$86.000
|
$97.410
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
21,600.000
|
$45.000
|
$36.000
|
$66.000
|
$95.000
|
$45.000
|
$108.200
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
109,710.000
|
$15.000
|
$7.000
|
$2.000
|
$4.000
|
$7.000
|
$6.760
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
20,460.000
|
$5.000
|
$6.000
|
$1.000
|
$19.000
|
$16.000
|
$11.670
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
21,600.000
|
$15.000
|
$15.000
|
$10.000
|
$15.000
|
$22.000
|
$18.910
|
|
|
DRIVEWAYS (ACP)
|
SY
|
999.000
|
$50.000
|
$80.000
|
$75.000
|
$57.000
|
$68.000
|
$105.670
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
48,570.000
|
$0.150
|
$0.350
|
$0.160
|
$0.200
|
$0.200
|
$0.180
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$25.000
|
$65.000
|
$31.600
|
$30.000
|
$34.000
|
$31.330
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,650.000
|
$2,200.000
|
$1,185.090
|
$2,380.000
|
$1,890.000
|
$1,174.880
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$6.000
|
$12.000
|
$5.000
|
$3.250
|
$4.000
|
$2.090
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$180.000
|
$750.000
|
$205.420
|
$179.000
|
$410.000
|
$203.650
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$250.000
|
$500.000
|
$205.420
|
$166.000
|
$410.000
|
$203.650
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
15,332.000
|
$15.000
|
$17.000
|
$17.860
|
$26.600
|
$24.000
|
$17.700
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
2.000
|
$4,000.000
|
$3,600.000
|
$3,750.150
|
$3,560.000
|
$4,000.000
|
$3,717.830
|
|
|
REMOVE CABLE BARRIER
|
LF
|
15,634.000
|
$6.000
|
$3.500
|
$2.950
|
$4.000
|
$6.000
|
$2.920
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
8.000
|
$400.000
|
$740.000
|
$384.500
|
$543.000
|
$630.000
|
$381.180
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,500.000
|
$5,000.000
|
$3,002.230
|
$2,965.000
|
$3,800.000
|
$2,976.350
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
24.000
|
$1,300.000
|
$1,250.000
|
$1,432.640
|
$1,381.000
|
$1,060.000
|
$1,420.290
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
9.000
|
$1,200.000
|
$2,000.000
|
$758.460
|
$720.000
|
$1,100.000
|
$751.920
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$1,300.000
|
$800.000
|
$758.460
|
$693.000
|
$990.000
|
$751.920
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$15,000.000
|
$9,000.000
|
$8,127.080
|
$7,948.000
|
$9,000.000
|
$8,057.030
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
21.000
|
$4,700.000
|
$4,500.000
|
$4,500.000
|
$4,526.000
|
$4,700.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,965.000
|
$12.000
|
$12.000
|
$12.000
|
$15.000
|
$15.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
180.000
|
$33.000
|
$35.000
|
$35.000
|
$42.000
|
$44.000
|
$35.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
12,950.000
|
$1.500
|
$1.500
|
$1.500
|
$2.000
|
$2.000
|
$1.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
8.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
$1,750.000
|
$1,100.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
5.000
|
$5,000.000
|
$5,500.000
|
$5,500.000
|
$9,293.000
|
$9,700.000
|
$5,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
34.000
|
$45.000
|
$34.000
|
$20.500
|
$21.000
|
$47.000
|
$21.390
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
594.000
|
$31.000
|
$26.000
|
$25.750
|
$31.500
|
$33.000
|
$26.860
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
27.000
|
$692.000
|
$700.000
|
$700.000
|
$615.000
|
$980.000
|
$730.220
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
16.000
|
$806.000
|
$880.000
|
$875.000
|
$685.000
|
$1,200.000
|
$912.770
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$875.000
|
$1,000.000
|
$985.000
|
$858.000
|
$1,450.000
|
$1,027.520
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$1,110.000
|
$1,120.000
|
$1,750.000
|
$1,157.920
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,500.000
|
$2,300.000
|
$2,015.000
|
$2,526.000
|
$2,630.000
|
$2,101.990
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$80.000
|
$100.000
|
$80.000
|
$93.000
|
$82.000
|
$83.450
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,093.000
|
$6.250
|
$9.000
|
$6.250
|
$6.000
|
$7.000
|
$6.520
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
60.000
|
$70.000
|
$60.000
|
$58.000
|
$54.000
|
$93.000
|
$60.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
170.000
|
$4.000
|
$3.100
|
$3.000
|
$5.250
|
$3.300
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
86,655.000
|
$0.500
|
$0.400
|
$0.320
|
$0.850
|
$0.350
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
3,958.000
|
$1.000
|
$0.500
|
$0.480
|
$1.700
|
$0.550
|
$0.480
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
71.000
|
$0.700
|
$16.000
|
$16.000
|
$5.000
|
$18.000
|
$16.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BKN W/MRKR)
|
LF
|
20,951.000
|
$5.000
|
$0.700
|
$0.680
|
$1.500
|
$0.750
|
$0.680
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
2.000
|
$130.000
|
$150.000
|
$150.000
|
$263.000
|
$165.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
2.000
|
$180.000
|
$265.000
|
$250.000
|
$515.000
|
$280.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
86,156.000
|
$0.500
|
$0.330
|
$0.320
|
$0.850
|
$0.350
|
$0.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
26,462.000
|
$0.250
|
$1.250
|
$1.220
|
$1.500
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,595.000
|
$1.500
|
$0.900
|
$0.880
|
$3.000
|
$1.000
|
$0.880
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
450.000
|
$6.500
|
$8.000
|
$8.000
|
$3.300
|
$9.000
|
$8.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
75.000
|
$11.000
|
$16.000
|
$16.000
|
$5.500
|
$18.000
|
$16.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
8,775.000
|
$0.650
|
$0.900
|
$0.880
|
$1.000
|
$1.000
|
$0.880
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
37,965.000
|
$0.780
|
$1.150
|
$1.100
|
$1.900
|
$1.200
|
$1.100
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
37,515.000
|
$0.780
|
$1.150
|
$1.100
|
$1.900
|
$1.200
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$240.000
|
$210.000
|
$200.000
|
$247.000
|
$220.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
1.000
|
$500.000
|
$505.000
|
$500.000
|
$551.000
|
$550.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$350.000
|
$310.000
|
$300.000
|
$331.000
|
$330.000
|
$300.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
8.000
|
$5.500
|
$5.000
|
$5.000
|
$5.250
|
$6.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
633.000
|
$5.500
|
$5.000
|
$5.000
|
$5.250
|
$6.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,065.000
|
$0.750
|
$0.500
|
$0.350
|
$0.400
|
$0.400
|
$0.350
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
43,296.000
|
$115.000
|
$115.500
|
$132.000
|
$130.000
|
$130.000
|
$133.560
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
1,774.000
|
$130.000
|
$132.000
|
$150.000
|
$135.000
|
$200.000
|
$148.340
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
12,657.000
|
$130.000
|
$130.000
|
$145.000
|
$140.000
|
$150.000
|
$143.560
|
|
|
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
|
TON
|
12,657.000
|
$150.000
|
$135.000
|
$165.000
|
$153.000
|
$185.000
|
$162.920
|
|
|
BONDING COURSE
|
GAL
|
29,824.000
|
$3.500
|
$3.000
|
$3.000
|
$10.000
|
$5.000
|
$3.270
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$22,000.000
|
$8,200.000
|
$20,000.000
|
$21,296.000
|
$46,300.000
|
$34,697.210
|
|
|
TMA (STATIONARY)
|
DAY
|
1,104.000
|
$200.000
|
$25.000
|
$1.000
|
$265.000
|
$250.000
|
$167.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
92.000
|
$350.000
|
$0.010
|
$100.000
|
$556.000
|
$690.000
|
$2,115.810
|
|
Totals: |
$40,574,001.210
|
$33,508,385.700
|
$39,064,958.980
|
$41,963,041.560
|
$43,616,609.620
|
$66,797,604.400
|