PREPARING ROW
|
STA
|
430.820
|
$750.000
|
$530.500
|
$705.660
|
$1,334.200
|
$700.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
139.000
|
$8.600
|
$14.550
|
$11.130
|
$10.500
|
$20.260
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,005.000
|
$11.600
|
$10.850
|
$13.320
|
$10.500
|
$35.010
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
8,996.000
|
$8.800
|
$4.000
|
$5.610
|
$10.700
|
$2.700
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
15,288.000
|
$2.700
|
$5.500
|
$3.330
|
$11.500
|
$2.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
134,872.000
|
$3.150
|
$1.700
|
$3.330
|
$4.000
|
$5.500
|
|
|
REMOVING STAB BASE & ASPH PAV (0"-10")
|
SY
|
27,732.000
|
$2.400
|
$2.250
|
$3.330
|
$3.300
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,048.000
|
$10.300
|
$7.700
|
$15.510
|
$7.100
|
$13.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
19,120.000
|
$6.100
|
$2.350
|
$12.270
|
$10.000
|
$17.000
|
|
|
BLADING
|
HR
|
234.000
|
$104.000
|
$284.000
|
$96.900
|
$188.700
|
$97.390
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
117,218.000
|
$1.400
|
$1.050
|
$0.700
|
$1.600
|
$2.350
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
117,218.000
|
$0.150
|
$0.150
|
$0.140
|
$0.100
|
$0.190
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
234,436.000
|
$0.150
|
$0.100
|
$0.080
|
$0.100
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
3,658.000
|
$19.800
|
$23.000
|
$23.310
|
$25.800
|
$21.220
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
44,764.000
|
$1.000
|
$0.850
|
$0.700
|
$0.800
|
$0.810
|
|
|
PROOF ROLLING
|
HR
|
234.000
|
$90.000
|
$83.000
|
$74.100
|
$145.600
|
$69.740
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
146,432.000
|
$11.300
|
$11.190
|
$11.620
|
$10.600
|
$12.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
2,108.000
|
$164.000
|
$142.000
|
$168.000
|
$175.500
|
$165.000
|
|
|
LIME TRT (EXIST MATL)(9")
|
SY
|
117,605.000
|
$3.000
|
$1.700
|
$2.450
|
$1.800
|
$3.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
39,792.000
|
$2.800
|
$1.850
|
$2.280
|
$1.800
|
$3.250
|
|
|
ASPH (RC-250)
|
GAL
|
30,036.000
|
$4.600
|
$4.650
|
$4.460
|
$4.500
|
$4.650
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
920.000
|
$75.000
|
$91.250
|
$71.700
|
$93.000
|
$95.000
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
1,064.000
|
$84.000
|
$121.900
|
$84.810
|
$123.000
|
$126.000
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
920.000
|
$80.000
|
$90.950
|
$71.700
|
$93.000
|
$95.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
67,198.000
|
$3.250
|
$4.350
|
$3.590
|
$3.500
|
$3.650
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
3,562.000
|
$79.000
|
$63.700
|
$67.590
|
$106.900
|
$110.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
4,399.000
|
$80.000
|
$80.300
|
$74.940
|
$117.600
|
$120.000
|
|
|
CUT & RESTORING PAV
|
SY
|
2,617.000
|
$80.000
|
$45.250
|
$101.960
|
$96.300
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
665.000
|
$109.000
|
$104.200
|
$99.750
|
$103.500
|
$160.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
361.000
|
$3.000
|
$10.950
|
$10.500
|
$10.900
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
531.000
|
$13.000
|
$32.900
|
$31.500
|
$32.700
|
$15.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
165.200
|
$420.000
|
$401.750
|
$495.910
|
$406.400
|
$450.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
288.000
|
$350.000
|
$347.400
|
$405.430
|
$349.900
|
$400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
160.000
|
$375.000
|
$335.500
|
$439.680
|
$352.500
|
$400.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
36.000
|
$120.000
|
$188.750
|
$90.000
|
$121.000
|
$159.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
414.000
|
$422.000
|
$497.800
|
$478.600
|
$417.200
|
$420.000
|
|
|
RAIL (TY T223)
|
LF
|
80.300
|
$103.000
|
$393.250
|
$145.210
|
$95.700
|
$89.960
|
|
|
RAIL (TY SSTR)
|
LF
|
1,180.000
|
$42.000
|
$76.300
|
$62.370
|
$52.000
|
$60.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
180.000
|
$232.000
|
$403.250
|
$246.760
|
$256.000
|
$470.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
92.000
|
$241.000
|
$487.150
|
$325.510
|
$337.600
|
$500.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
86.000
|
$387.000
|
$634.750
|
$393.770
|
$408.400
|
$775.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
277.500
|
$432.000
|
$803.600
|
$483.020
|
$501.000
|
$810.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
36.400
|
$909.000
|
$1,401.600
|
$924.040
|
$958.500
|
$1,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,238.000
|
$73.000
|
$82.250
|
$78.750
|
$81.700
|
$120.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
268.000
|
$111.000
|
$120.650
|
$115.500
|
$119.800
|
$160.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
35.000
|
$139.000
|
$191.900
|
$183.760
|
$190.600
|
$360.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
206.000
|
$175.000
|
$246.750
|
$236.260
|
$245.100
|
$310.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$3,700.000
|
$4,167.400
|
$3,990.150
|
$4,138.800
|
$2,919.700
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$5,798.000
|
$6,174.500
|
$5,981.290
|
$6,350.900
|
$3,076.710
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$8,674.000
|
$11,477.550
|
$9,347.690
|
$8,371.100
|
$19,379.080
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
1.000
|
$12,375.000
|
$15,408.590
|
$11,110.790
|
$12,405.200
|
$23,218.620
|
|
|
WINGWALL (FW - S) (HW=9 FT)
|
EA
|
2.000
|
$20,000.000
|
$13,503.500
|
$16,322.120
|
$34,271.900
|
$18,663.900
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
1.000
|
$6,000.000
|
$9,268.250
|
$6,027.090
|
$5,734.200
|
$2,160.860
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
6.000
|
$6,685.000
|
$4,864.950
|
$4,981.650
|
$5,698.000
|
$5,672.220
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$4,985.000
|
$7,214.350
|
$6,127.460
|
$4,739.100
|
$6,104.740
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
4.000
|
$9,172.000
|
$11,836.000
|
$13,866.840
|
$11,035.400
|
$8,515.710
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
35.000
|
$1,116.000
|
$1,316.000
|
$1,260.050
|
$1,307.000
|
$1,423.580
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
21.000
|
$1,139.000
|
$1,316.000
|
$1,260.050
|
$1,307.000
|
$1,673.210
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,467.000
|
$1,754.700
|
$1,680.060
|
$1,742.600
|
$1,605.290
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,014.000
|
$2,412.710
|
$2,310.090
|
$2,396.100
|
$1,853.290
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,460.000
|
$2,741.710
|
$2,625.100
|
$2,722.900
|
$2,410.330
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,708.000
|
$4,386.700
|
$4,200.160
|
$4,356.600
|
$4,336.880
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,896.000
|
$5,483.420
|
$5,250.200
|
$5,445.800
|
$5,245.970
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
9.000
|
$1,422.000
|
$1,645.000
|
$1,575.060
|
$1,633.700
|
$4,000.000
|
|
|
REMOV STR (SET)
|
EA
|
76.000
|
$373.000
|
$548.350
|
$525.020
|
$544.600
|
$267.200
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,077.000
|
$1,316.000
|
$1,260.050
|
$1,307.000
|
$1,363.470
|
|
|
REMOV STR (PIPE)
|
EA
|
36.000
|
$350.000
|
$548.350
|
$525.020
|
$544.600
|
$155.730
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$724,000.000
|
$695,000.000
|
$745,350.830
|
$1,210,000.000
|
$1,220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$7,114.120
|
$4,135.150
|
$5,590.600
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
800.000
|
$26.000
|
$25.750
|
$21.000
|
$28.400
|
$24.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
800.000
|
$7.600
|
$7.050
|
$7.000
|
$6.700
|
$6.800
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
500.000
|
$14.000
|
$15.450
|
$11.000
|
$15.000
|
$21.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
500.000
|
$5.000
|
$5.700
|
$2.000
|
$5.400
|
$8.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
117.000
|
$74.000
|
$102.450
|
$79.800
|
$66.000
|
$70.330
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
35,180.000
|
$2.100
|
$3.050
|
$1.750
|
$2.000
|
$2.940
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
35,180.000
|
$0.600
|
$0.500
|
$0.750
|
$0.300
|
$0.480
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,800.000
|
$2.800
|
$3.950
|
$3.150
|
$5.000
|
$3.810
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,800.000
|
$0.900
|
$0.800
|
$1.000
|
$1.000
|
$0.790
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,217.000
|
$50.000
|
$47.550
|
$44.850
|
$96.300
|
$105.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
2,080.000
|
$76.000
|
$58.000
|
$79.800
|
$80.400
|
$62.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
1,600.000
|
$76.000
|
$86.000
|
$96.900
|
$69.200
|
$45.430
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.500
|
$3,111.000
|
$23,100.000
|
$3,655.390
|
$5,933.400
|
$6,368.550
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
600.000
|
$24.000
|
$26.400
|
$29.170
|
$37.500
|
$13.820
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
5,850.000
|
$4.000
|
$8.700
|
$13.410
|
$9.700
|
$5.840
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
90.000
|
$5.500
|
$34.600
|
$18.060
|
$9.700
|
$59.970
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$4.500
|
$9.200
|
$23.450
|
$9.700
|
$13.820
|
|
|
DRIVEWAYS (CONC)
|
SY
|
949.000
|
$70.000
|
$76.050
|
$73.230
|
$72.800
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
12,994.000
|
$35.000
|
$37.900
|
$30.660
|
$23.000
|
$55.000
|
|
|
DRIVEWAYS AND TURNOUTS (ACP)
|
SY
|
2,418.000
|
$35.000
|
$30.450
|
$30.660
|
$48.100
|
$77.180
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,837.500
|
$20.000
|
$20.450
|
$20.410
|
$20.100
|
$20.210
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,800.000
|
$1,485.800
|
$1,830.000
|
$1,496.300
|
$1,466.670
|
|
|
SHORT RADIUS
|
LF
|
29.000
|
$30.000
|
$25.700
|
$40.750
|
$25.800
|
$25.380
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$794.000
|
$711.750
|
$985.000
|
$773.900
|
$702.560
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,595.000
|
$2.500
|
$1.050
|
$1.000
|
$1.000
|
$1.030
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$217.000
|
$129.900
|
$111.000
|
$206.400
|
$128.210
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
23.000
|
$2,500.000
|
$2,836.560
|
$2,665.000
|
$2,476.600
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
23.000
|
$200.000
|
$129.900
|
$55.000
|
$258.000
|
$128.210
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
8.000
|
$10,801.000
|
$7,000.000
|
$6,775.000
|
$8,771.200
|
$7,179.490
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
100.000
|
$1,500.000
|
$852.500
|
$770.000
|
$877.100
|
$1,025.640
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,087.000
|
$614.560
|
$100.000
|
$516.000
|
$769.230
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
6,142.000
|
$25.000
|
$33.050
|
$52.500
|
$45.700
|
$27.050
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
362.000
|
$25.000
|
$41.000
|
$57.750
|
$51.200
|
$34.240
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
13.000
|
$586.000
|
$628.600
|
$605.000
|
$619.100
|
$550.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
70.000
|
$213.000
|
$207.800
|
$200.000
|
$309.600
|
$235.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
50.000
|
$524.000
|
$486.250
|
$468.000
|
$490.200
|
$430.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
22.000
|
$612.000
|
$556.600
|
$535.700
|
$464.400
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$611.000
|
$595.950
|
$573.560
|
$516.000
|
$480.000
|
|
|
IN SM RD SN SUP&AM TYFRP(1)UA(P)
|
EA
|
2.000
|
$455.000
|
$618.200
|
$595.000
|
$516.000
|
$465.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$666.000
|
$669.450
|
$644.310
|
$773.900
|
$670.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$411.000
|
$432.250
|
$416.000
|
$464.400
|
$375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
85.000
|
$78.000
|
$77.950
|
$75.000
|
$56.800
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
23.000
|
$22.000
|
$13.350
|
$12.860
|
$5.200
|
$18.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
10.000
|
$82.000
|
$47.100
|
$45.330
|
$92.900
|
$72.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
49.000
|
$80.000
|
$45.800
|
$44.070
|
$92.900
|
$72.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
147.000
|
$28.000
|
$14.800
|
$14.250
|
$10.300
|
$26.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
169,434.000
|
$0.200
|
$0.250
|
$0.250
|
$0.400
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
940.000
|
$0.450
|
$0.550
|
$0.500
|
$1.200
|
$0.640
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
6.000
|
$60.000
|
$79.200
|
$75.000
|
$185.700
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
6.000
|
$70.000
|
$89.750
|
$85.000
|
$185.700
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
5,780.000
|
$0.200
|
$0.250
|
$0.250
|
$0.200
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
369,052.000
|
$0.200
|
$0.250
|
$0.250
|
$0.300
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)(MED NOSE)
|
EA
|
6.000
|
$250.000
|
$158.400
|
$150.000
|
$206.400
|
$344.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
10,560.000
|
$3.300
|
$4.150
|
$4.000
|
$4.500
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,342.000
|
$5.000
|
$6.350
|
$6.000
|
$10.300
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
18,362.000
|
$0.800
|
$0.800
|
$1.500
|
$0.700
|
$1.190
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
470.000
|
$0.800
|
$1.000
|
$0.950
|
$1.100
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
323.000
|
$5.800
|
$6.350
|
$6.000
|
$6.700
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
3.000
|
$107.000
|
$100.350
|
$95.000
|
$129.000
|
$124.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
3.000
|
$137.000
|
$132.000
|
$125.000
|
$154.800
|
$137.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
3.000
|
$285.000
|
$264.050
|
$250.000
|
$175.400
|
$388.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
81,816.000
|
$0.080
|
$0.150
|
$0.150
|
$0.200
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
84,717.000
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.220
|
|
|
PAVEMENT SEALER 8"
|
LF
|
470.000
|
$0.300
|
$0.300
|
$0.300
|
$1.500
|
$0.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
323.000
|
$2.500
|
$3.150
|
$3.000
|
$4.500
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
3.000
|
$45.000
|
$68.650
|
$65.000
|
$206.400
|
$63.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
3.000
|
$50.000
|
$80.250
|
$75.000
|
$206.400
|
$63.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
3.000
|
$150.000
|
$89.750
|
$85.000
|
$206.400
|
$244.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
890.000
|
$0.300
|
$0.350
|
$0.350
|
$0.600
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
16,480.000
|
$0.300
|
$0.350
|
$0.350
|
$0.600
|
$0.400
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
84,717.000
|
$0.900
|
$0.800
|
$0.750
|
$1.100
|
$0.970
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
2,000.000
|
$0.600
|
$0.700
|
$0.650
|
$1.000
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
62,446.000
|
$0.600
|
$0.700
|
$0.650
|
$1.000
|
$0.680
|
|
REFL PAV MRKR TY I-C
|
EA
|
25.000
|
$3.100
|
$5.300
|
$5.000
|
$9.300
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,730.000
|
$2.800
|
$5.300
|
$5.000
|
$5.200
|
$3.220
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
176,180.000
|
$0.450
|
$0.250
|
$0.250
|
$0.500
|
$0.430
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,755.000
|
$0.800
|
$0.100
|
$0.100
|
$0.400
|
$0.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$6,400.000
|
$8,831.780
|
$7,592.000
|
$7,834.200
|
$7,592.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,515.000
|
$8,746.380
|
$7,911.790
|
$8,868.700
|
$8,944.240
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$3.150
|
$36.350
|
$35.000
|
$10.300
|
$13.760
|
|
|
TMA (STATIONARY)
|
DAY
|
302.000
|
$163.000
|
$184.300
|
$163.510
|
$159.900
|
$118.470
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
112.000
|
$131.000
|
$719.250
|
$338.620
|
$331.200
|
$401.390
|
|
Totals: |
$10,224,309.230
|
$10,189,262.840
|
$10,573,002.072
|
$12,133,045.884
|
$13,128,050.898
|