Job Info for 1899-01-018

County: KENDALL Highway: RM 1376 Date: 05/08/2019 (5 years ago) Engineer's Estimate: $10,224,309 Control Number: 1899-01-018
Project: STP 2019(909) District: SAN ANTONIO Time: 217 WORKING DAYS Type: GRD, BSE, SURF, PAV'T MRKINGS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $10,224,309.23
CURRAN CONTRACTING COMPANY   $10,189,262.83 1
-0.34% | -$35,046.40
HUNTER INDUSTRIES, LTD.   $10,573,002.05 2
3.41% | $348,692.82
3.77% | $383,739.22
BRIDGES AND ROADS, LLC   $12,133,045.88 3
18.67% | $1,908,736.65
19.08% | $1,943,783.05
14.75% | $1,560,043.83
CAPITAL EXCAVATION COMPANY   $13,128,050.88 4
28.4% | $2,903,741.65
28.84% | $2,938,788.05
8.20% | $995,005.00

Bid Items

Items: 151, 0 filtered
KENDALL RM 1376  |  SAN ANTONIO  |  1899-01-018  |  05/08/2019  |  $10,224,309  |  STP 2019(909)  |  GRD, BSE, SURF, PAV'T MRKINGS  |  217 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CURRAN CONTRACTING COMPANY HUNTER INDUSTRIES, LTD. BRIDGES AND ROADS, LLC CAPITAL EXCAVATION COMPANY
100 6002 PREPARING ROW STA 430.820 $750.000 $530.500 $705.660 $1,334.200 $700.000
104 6009 REMOVING CONC (RIPRAP) SY 139.000 $8.600 $14.550 $11.130 $10.500 $20.260
104 6017 REMOVING CONC (DRIVEWAYS) SY 1,005.000 $11.600 $10.850 $13.320 $10.500 $35.010
104 6054 REMOVING CONCRETE(MOW STRIP) LF 8,996.000 $8.800 $4.000 $5.610 $10.700 $2.700
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY 15,288.000 $2.700 $5.500 $3.330 $11.500 $2.000
105 6030 REMOVING STAB BASE & ASPH PAV (8"-14") SY 134,872.000 $3.150 $1.700 $3.330 $4.000 $5.500
105 6046 REMOVING STAB BASE & ASPH PAV (0"-10") SY 27,732.000 $2.400 $2.250 $3.330 $3.300 $5.000
110 6001 EXCAVATION (ROADWAY) CY 12,048.000 $10.300 $7.700 $15.510 $7.100 $13.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 19,120.000 $6.100 $2.350 $12.270 $10.000 $17.000
150 6002 BLADING HR 234.000 $104.000 $284.000 $96.900 $188.700 $97.390
161 6017 COMPOST MANUF TOPSOIL (4") SY 117,218.000 $1.400 $1.050 $0.700 $1.600 $2.350
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 117,218.000 $0.150 $0.150 $0.140 $0.100 $0.190
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 234,436.000 $0.150 $0.100 $0.080 $0.100 $0.150
168 6001 VEGETATIVE WATERING MG 3,658.000 $19.800 $23.000 $23.310 $25.800 $21.220
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 44,764.000 $1.000 $0.850 $0.700 $0.800 $0.810
216 6001 PROOF ROLLING HR 234.000 $90.000 $83.000 $74.100 $145.600 $69.740
247 6312 FL BS (CMP IN PLC)(TY D GR1-2)(8") SY 146,432.000 $11.300 $11.190 $11.620 $10.600 $12.000
260 6016 LIME (HYD, COM, OR QK(SLURRY)) TON 2,108.000 $164.000 $142.000 $168.000 $175.500 $165.000
260 6024 LIME TRT (EXIST MATL)(9") SY 117,605.000 $3.000 $1.700 $2.450 $1.800 $3.000
260 6027 LIME TRT (EXST MATL)(8") SY 39,792.000 $2.800 $1.850 $2.280 $1.800 $3.250
316 6029 ASPH (RC-250) GAL 30,036.000 $4.600 $4.650 $4.460 $4.500 $4.650
316 6222 AGGR(TY-PB GR-3 SAC-B) CY 920.000 $75.000 $91.250 $71.700 $93.000 $95.000
316 6226 AGGR(TY-PB GR-5 SAC-B) CY 1,064.000 $84.000 $121.900 $84.810 $123.000 $126.000
316 6240 AGGR(TY-PD GR-4 SAC-B) CY 920.000 $80.000 $90.950 $71.700 $93.000 $95.000
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 67,198.000 $3.250 $4.350 $3.590 $3.500 $3.650
340 6011 D-GR HMA(SQ) TY-B PG64-22 TON 3,562.000 $79.000 $63.700 $67.590 $106.900 $110.000
344 6048 SUPERPAVE MIXTURES SP-C SAC-B PG70-22 TON 4,399.000 $80.000 $80.300 $74.940 $117.600 $120.000
400 6006 CUT & RESTORING PAV SY 2,617.000 $80.000 $45.250 $101.960 $96.300 $100.000
401 6001 FLOWABLE BACKFILL CY 665.000 $109.000 $104.200 $99.750 $103.500 $160.000
402 6001 TRENCH EXCAVATION PROTECTION LF 361.000 $3.000 $10.950 $10.500 $10.900 $5.000
403 6001 TEMPORARY SPL SHORING SF 531.000 $13.000 $32.900 $31.500 $32.700 $15.000
420 6066 CL C CONC (RAIL FOUNDATION) CY 165.200 $420.000 $401.750 $495.910 $406.400 $450.000
432 6001 RIPRAP (CONC)(4 IN) CY 288.000 $350.000 $347.400 $405.430 $349.900 $400.000
432 6002 RIPRAP (CONC)(5 IN) CY 160.000 $375.000 $335.500 $439.680 $352.500 $400.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 36.000 $120.000 $188.750 $90.000 $121.000 $159.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 414.000 $422.000 $497.800 $478.600 $417.200 $420.000
450 6006 RAIL (TY T223) LF 80.300 $103.000 $393.250 $145.210 $95.700 $89.960
450 6023 RAIL (TY SSTR) LF 1,180.000 $42.000 $76.300 $62.370 $52.000 $60.000
462 6006 CONC BOX CULV (5 FT X 2 FT) LF 180.000 $232.000 $403.250 $246.760 $256.000 $470.000
462 6007 CONC BOX CULV (5 FT X 3 FT) LF 92.000 $241.000 $487.150 $325.510 $337.600 $500.000
462 6016 CONC BOX CULV (7 FT X 5 FT) LF 86.000 $387.000 $634.750 $393.770 $408.400 $775.000
462 6019 CONC BOX CULV (8 FT X 4 FT) LF 277.500 $432.000 $803.600 $483.020 $501.000 $810.000
462 6023 CONC BOX CULV (8 FT X 8 FT) LF 36.400 $909.000 $1,401.600 $924.040 $958.500 $1,000.000
464 6005 RC PIPE (CL III)(24 IN) LF 1,238.000 $73.000 $82.250 $78.750 $81.700 $120.000
464 6007 RC PIPE (CL III)(30 IN) LF 268.000 $111.000 $120.650 $115.500 $119.800 $160.000
464 6008 RC PIPE (CL III)(36 IN) LF 35.000 $139.000 $191.900 $183.760 $190.600 $360.000
464 6010 RC PIPE (CL III)(48 IN) LF 206.000 $175.000 $246.750 $236.260 $245.100 $310.000
465 6070 INLET (COMPL)(PSL)(RC)(3FTX3FT) EA 1.000 $3,700.000 $4,167.400 $3,990.150 $4,138.800 $2,919.700
466 6007 HEADWALL (CH - FW - 0) (DIA= 30 IN) EA 2.000 $5,798.000 $6,174.500 $5,981.290 $6,350.900 $3,076.710
466 6167 WINGWALL (FW - S) (HW=6 FT) EA 1.000 $8,674.000 $11,477.550 $9,347.690 $8,371.100 $19,379.080
466 6168 WINGWALL (FW - S) (HW=7 FT) EA 1.000 $12,375.000 $15,408.590 $11,110.790 $12,405.200 $23,218.620
466 6170 WINGWALL (FW - S) (HW=9 FT) EA 2.000 $20,000.000 $13,503.500 $16,322.120 $34,271.900 $18,663.900
466 6214 HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD) EA 1.000 $6,000.000 $9,268.250 $6,027.090 $5,734.200 $2,160.860
467 6172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 6.000 $6,685.000 $4,864.950 $4,981.650 $5,698.000 $5,672.220
467 6177 SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C) EA 4.000 $4,985.000 $7,214.350 $6,127.460 $4,739.100 $6,104.740
467 6254 SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C) EA 4.000 $9,172.000 $11,836.000 $13,866.840 $11,035.400 $8,515.710
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 35.000 $1,116.000 $1,316.000 $1,260.050 $1,307.000 $1,423.580
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 21.000 $1,139.000 $1,316.000 $1,260.050 $1,307.000 $1,673.210
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 4.000 $1,467.000 $1,754.700 $1,680.060 $1,742.600 $1,605.290
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 4.000 $2,014.000 $2,412.710 $2,310.090 $2,396.100 $1,853.290
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 3.000 $2,460.000 $2,741.710 $2,625.100 $2,722.900 $2,410.330
467 6474 SET (TY II) (48 IN) (RCP) (3: 1) (C) EA 2.000 $3,708.000 $4,386.700 $4,200.160 $4,356.600 $4,336.880
467 6477 SET (TY II) (48 IN) (RCP) (4: 1) (C) EA 4.000 $4,896.000 $5,483.420 $5,250.200 $5,445.800 $5,245.970
480 6001 CLEAN EXIST CULVERTS EA 9.000 $1,422.000 $1,645.000 $1,575.060 $1,633.700 $4,000.000
496 6004 REMOV STR (SET) EA 76.000 $373.000 $548.350 $525.020 $544.600 $267.200
496 6005 REMOV STR (WINGWALL) EA 4.000 $1,077.000 $1,316.000 $1,260.050 $1,307.000 $1,363.470
496 6016 REMOV STR (PIPE) EA 36.000 $350.000 $548.350 $525.020 $544.600 $155.730
500 6001 MOBILIZATION LS 1.000 $724,000.000 $695,000.000 $745,350.830 $1,210,000.000 $1,220,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 14.000 $5,000.000 $7,114.120 $4,135.150 $5,590.600 $3,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 800.000 $26.000 $25.750 $21.000 $28.400 $24.800
506 6011 ROCK FILTER DAMS (REMOVE) LF 800.000 $7.600 $7.050 $7.000 $6.700 $6.800
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 500.000 $14.000 $15.450 $11.000 $15.000 $21.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 500.000 $5.000 $5.700 $2.000 $5.400 $8.000
506 6031 FRNT END LOADER WORK (ERSN & SEDM CONT) HR 117.000 $74.000 $102.450 $79.800 $66.000 $70.330
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 35,180.000 $2.100 $3.050 $1.750 $2.000 $2.940
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 35,180.000 $0.600 $0.500 $0.750 $0.300 $0.480
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,800.000 $2.800 $3.950 $3.150 $5.000 $3.810
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,800.000 $0.900 $0.800 $1.000 $1.000 $0.790
508 6001 CONSTRUCTING DETOURS SY 7,217.000 $50.000 $47.550 $44.850 $96.300 $105.000
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 2,080.000 $76.000 $58.000 $79.800 $80.400 $62.000
510 6002 ONE-WAY TRAF CONT (PILOT CAR) HR 1,600.000 $76.000 $86.000 $96.900 $69.200 $45.430
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 7.500 $3,111.000 $23,100.000 $3,655.390 $5,933.400 $6,368.550
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 600.000 $24.000 $26.400 $29.170 $37.500 $13.820
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 5,850.000 $4.000 $8.700 $13.410 $9.700 $5.840
512 6037 PORT CTB (STKPL)(SGL SLP)(TY 1) LF 90.000 $5.500 $34.600 $18.060 $9.700 $59.970
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 600.000 $4.500 $9.200 $23.450 $9.700 $13.820
530 6004 DRIVEWAYS (CONC) SY 949.000 $70.000 $76.050 $73.230 $72.800 $80.000
530 6005 DRIVEWAYS (ACP) SY 12,994.000 $35.000 $37.900 $30.660 $23.000 $55.000
530 6014 DRIVEWAYS AND TURNOUTS (ACP) SY 2,418.000 $35.000 $30.450 $30.660 $48.100 $77.180
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 4,837.500 $20.000 $20.450 $20.410 $20.100 $20.210
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,800.000 $1,485.800 $1,830.000 $1,496.300 $1,466.670
540 6014 SHORT RADIUS LF 29.000 $30.000 $25.700 $40.750 $25.800 $25.380
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA 1.000 $794.000 $711.750 $985.000 $773.900 $702.560
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,595.000 $2.500 $1.050 $1.000 $1.000 $1.030
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $217.000 $129.900 $111.000 $206.400 $128.210
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 23.000 $2,500.000 $2,836.560 $2,665.000 $2,476.600 $2,800.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 23.000 $200.000 $129.900 $55.000 $258.000 $128.210
545 6001 CRASH CUSH ATTEN (INSTL) EA 8.000 $10,801.000 $7,000.000 $6,775.000 $8,771.200 $7,179.490
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 100.000 $1,500.000 $852.500 $770.000 $877.100 $1,025.640
545 6005 CRASH CUSH ATTEN (REMOVE) EA 8.000 $1,087.000 $614.560 $100.000 $516.000 $769.230
556 6007 PIPE UNDERDRAINS (TY 7) (6") LF 6,142.000 $25.000 $33.050 $52.500 $45.700 $27.050
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF 362.000 $25.000 $41.000 $57.750 $51.200 $34.240
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 13.000 $586.000 $628.600 $605.000 $619.100 $550.000
560 6014 MAILBOX INSTALL-S (TWG-POST) TY 4 EA 70.000 $213.000 $207.800 $200.000 $309.600 $235.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 50.000 $524.000 $486.250 $468.000 $490.200 $430.000
644 6002 IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) EA 22.000 $612.000 $556.600 $535.700 $464.400 $475.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 8.000 $611.000 $595.950 $573.560 $516.000 $480.000
644 6023 IN SM RD SN SUP&AM TYFRP(1)UA(P) EA 2.000 $455.000 $618.200 $595.000 $516.000 $465.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 9.000 $666.000 $669.450 $644.310 $773.900 $670.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 1.000 $411.000 $432.250 $416.000 $464.400 $375.000
644 6076 REMOVE SM RD SN SUP&AM EA 85.000 $78.000 $77.950 $75.000 $56.800 $95.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 23.000 $22.000 $13.350 $12.860 $5.200 $18.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 10.000 $82.000 $47.100 $45.330 $92.900 $72.000
658 6049 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 49.000 $80.000 $45.800 $44.070 $92.900 $72.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 147.000 $28.000 $14.800 $14.250 $10.300 $26.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 169,434.000 $0.200 $0.250 $0.250 $0.400 $0.260
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 940.000 $0.450 $0.550 $0.500 $1.200 $0.640
662 6017 WK ZN PAV MRK NON-REMOV (W)(ARROW) EA 6.000 $60.000 $79.200 $75.000 $185.700 $150.000
662 6029 WK ZN PAV MRK NON-REMOV(W)(WORD) EA 6.000 $70.000 $89.750 $85.000 $185.700 $150.000
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 5,780.000 $0.200 $0.250 $0.250 $0.200 $0.260
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 369,052.000 $0.200 $0.250 $0.250 $0.300 $0.260
662 6043 WK ZN PAV MRK NON-REMOV (Y)(MED NOSE) EA 6.000 $250.000 $158.400 $150.000 $206.400 $344.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 10,560.000 $3.300 $4.150 $4.000 $4.500 $2.500
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 1,342.000 $5.000 $6.350 $6.000 $10.300 $6.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 18,362.000 $0.800 $0.800 $1.500 $0.700 $1.190
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 470.000 $0.800 $1.000 $0.950 $1.100 $0.700
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 323.000 $5.800 $6.350 $6.000 $6.700 $6.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 3.000 $107.000 $100.350 $95.000 $129.000 $124.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 3.000 $137.000 $132.000 $125.000 $154.800 $137.000
666 6156 REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) EA 3.000 $285.000 $264.050 $250.000 $175.400 $388.000
666 6224 PAVEMENT SEALER 4" LF 81,816.000 $0.080 $0.150 $0.150 $0.200 $0.150
666 6225 PAVEMENT SEALER 6" LF 84,717.000 $0.150 $0.200 $0.200 $0.200 $0.220
666 6226 PAVEMENT SEALER 8" LF 470.000 $0.300 $0.300 $0.300 $1.500 $0.400
666 6230 PAVEMENT SEALER 24" LF 323.000 $2.500 $3.150 $3.000 $4.500 $3.000
666 6231 PAVEMENT SEALER (ARROW) EA 3.000 $45.000 $68.650 $65.000 $206.400 $63.000
666 6232 PAVEMENT SEALER (WORD) EA 3.000 $50.000 $80.250 $75.000 $206.400 $63.000
666 6233 PAVEMENT SEALER (MED NOSE) EA 3.000 $150.000 $89.750 $85.000 $206.400 $244.000
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 890.000 $0.300 $0.350 $0.350 $0.600 $0.400
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 16,480.000 $0.300 $0.350 $0.350 $0.600 $0.400
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 84,717.000 $0.900 $0.800 $0.750 $1.100 $0.970
666 6344 REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) LF 2,000.000 $0.600 $0.700 $0.650 $1.000 $0.700
666 6345 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 62,446.000 $0.600 $0.700 $0.650 $1.000 $0.680
672 6007 REFL PAV MRKR TY I-C EA 25.000 $3.100 $5.300 $5.000 $9.300 $8.000
672 6009 REFL PAV MRKR TY II-A-A EA 1,730.000 $2.800 $5.300 $5.000 $5.200 $3.220
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 176,180.000 $0.450 $0.250 $0.250 $0.500 $0.430
678 6033 PAV SURF PREP FOR MRK (RPM) EA 1,755.000 $0.800 $0.100 $0.100 $0.400 $0.500
685 6004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) EA 2.000 $6,400.000 $8,831.780 $7,592.000 $7,834.200 $7,592.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $9,515.000 $8,746.380 $7,911.790 $8,868.700 $8,944.240
6056 6001 PREFORMED IN-LANE(TRANS) RUMBLE STRIP LF 80.000 $3.150 $36.350 $35.000 $10.300 $13.760
6185 6002 TMA (STATIONARY) DAY 302.000 $163.000 $184.300 $163.510 $159.900 $118.470
6185 6005 TMA (MOBILE OPERATION) DAY 112.000 $131.000 $719.250 $338.620 $331.200 $401.390
Totals: $10,224,309.23 $10,189,262.84 $10,573,002.07 $12,133,045.88 $13,128,050.90