Job Info for 0142-09-047

County: KENDALL Highway: RM 473 Date: 07/10/2024 (4 months ago) Engineer's Estimate: $7,160,915 Control Number: 0142-09-047
Project: SSW 142-9-47 District: SAN ANTONIO Time: 283 WORKING DAYS Type: WIDEN ROAD - ADD SHOULDERS
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,160,914.83
ACME BRIDGE COMPANY, INC.   $4,477,118.86 1
-37.48% | -$2,683,795.97
J. CARROLL WEAVER, INC.   $4,607,328.68 2
-35.66% | -$2,553,586.15
2.91% | $130,209.82
LCR TOTAL TRANSPORT LLC   $5,399,445.00 3
-24.6% | -$1,761,469.83
20.6% | $922,326.14
17.19% | $792,116.32
DEAN WORD COMPANY, LTD.   $5,831,190.11 4
-18.57% | -$1,329,724.72
30.24% | $1,354,071.25
8.00% | $431,745.11
ALLEN KELLER COMPANY   $5,928,107.45 5
-17.22% | -$1,232,807.38
32.41% | $1,450,988.59
1.66% | $96,917.34
CK NEWBERRY, LLC   $6,427,861.45 6
-10.24% | -$733,053.38
43.57% | $1,950,742.59
8.43% | $499,754.00
J3 COMPANY, LLC   $6,634,821.25 7
-7.35% | -$526,093.58
48.19% | $2,157,702.39
3.22% | $206,959.80
HUNTER INDUSTRIES, LTD.   $7,162,487.35 8
0.02% | $1,572.52
59.98% | $2,685,368.49
7.95% | $527,666.10
Subcontractor Percentage Amount
J. H. ODEN CONTRACTING COMPANY 7.33% $328,172.81
MPB, INC. 5.13% $229,676.20
TRP CONSTRUCTION GROUP, LLC 4.20% $188,038.99
MURRAY CONSTRUCTION 2.40% $107,450.85
EGGEMEYER LAND CLEARING, LLC 1.46% $65,365.94
DIIBS SPECIALISTS, LLC 1.24% $55,516.27
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.51% $22,833.31
Total: 22.27% $997,054.37

Bid Items

Items: 96, 0 filtered
KENDALL RM 473  |  SAN ANTONIO  |  0142-09-047  |  07/10/2024  |  $7,160,915  |  SSW 142-9-47  |  WIDEN ROAD - ADD SHOULDERS  |  283 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ACME BRIDGE COMPANY, INC. J. CARROLL WEAVER, INC. LCR TOTAL TRANSPORT LLC DEAN WORD COMPANY, LTD. ALLEN KELLER COMPANY CK NEWBERRY, LLC J3 COMPANY, LLC HUNTER INDUSTRIES, LTD.
100 6002 PREPARING ROW STA 378.000 $900.000 $1,030.000 $220.000 $858.000 $675.805 $500.000 $500.000 $700.000 $1,165.500
104 6009 REMOVING CONC (RIPRAP) SY 316.000 $17.830 $19.200 $16.020 $25.000 $24.236 $62.200 $50.000 $30.000 $36.300
104 6017 REMOVING CONC (DRIVEWAYS) SY 554.000 $15.330 $14.400 $16.020 $25.000 $21.058 $57.300 $50.000 $30.000 $36.300
105 6043 REMOVING STAB BASE & ASPH PAV (0-6") SY 679.000 $10.950 $14.700 $8.450 $6.000 $11.513 $14.100 $25.000 $20.000 $7.000
105 6044 REMOVING STAB BASE AND ASPH PAV (10") SY 11,538.000 $13.850 $10.500 $14.700 $14.000 $4.740 $4.550 $30.000 $15.500 $16.400
110 6001 EXCAVATION (ROADWAY) CY 11,822.000 $24.880 $10.300 $28.120 $41.000 $24.506 $20.050 $30.000 $75.000 $87.500
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 2,622.000 $40.000 $11.300 $23.560 $28.000 $31.653 $19.200 $35.000 $20.000 $115.500
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 78,835.000 $4.970 $0.920 $1.830 $1.600 $1.252 $4.450 $2.000 $8.000 $3.380
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 78,835.000 $0.630 $0.290 $0.330 $0.200 $0.291 $0.300 $0.300 $0.200 $0.280
164 6009 BROADCAST SEED (TEMP) (WARM) SY 39,418.000 $0.200 $0.160 $0.110 $0.200 $0.198 $0.200 $0.200 $0.150 $0.190
164 6011 BROADCAST SEED (TEMP) (COOL) SY 39,418.000 $0.200 $0.160 $0.110 $0.200 $0.198 $0.200 $0.200 $0.150 $0.190
168 6001 VEGETATIVE WATERING MG 1,230.000 $143.830 $31.500 $30.800 $57.000 $27.553 $16.500 $25.000 $60.000 $28.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 78,835.000 $3.030 $0.950 $1.820 $1.000 $1.716 $1.650 $2.000 $1.200 $1.650
216 6001 PROOF ROLLING HR 105.000 $67.500 $39.200 $71.500 $122.000 $98.440 $150.500 $100.000 $95.000 $156.000
247 6053 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY 8,987.000 $80.100 $97.000 $74.930 $98.000 $222.867 $132.250 $140.000 $108.000 $134.640
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 5,802.000 $10.000 $7.300 $6.350 $5.750 $5.115 $9.050 $7.000 $5.000 $12.500
316 6240 AGGR(TY-PD GR-4 SAC-B) CY 985.000 $264.320 $148.000 $121.580 $150.000 $115.774 $222.250 $140.000 $250.000 $174.210
316 6407 AGGR (TY-PD GR-3 OR TY-PL GR-3) CY 310.000 $311.500 $347.000 $260.780 $150.000 $175.705 $449.500 $300.000 $400.000 $238.700
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 46,646.000 $4.740 $6.000 $4.040 $5.100 $4.729 $5.700 $5.000 $6.000 $6.800
400 6003 STRUCT EXCAV (PIPE) CY 50.000 $34.880 $32.900 $7.820 $22.500 $36.400 $100.500 $100.000 $55.000 $72.590
400 6006 CUT & RESTORING PAV SY 45.000 $254.340 $94.900 $159.500 $33.000 $117.700 $100.500 $125.000 $200.000 $186.220
401 6001 FLOWABLE BACKFILL CY 16.000 $433.330 $339.000 $330.000 $205.000 $260.000 $276.500 $300.000 $300.000 $262.340
402 6001 TRENCH EXCAVATION PROTECTION LF 64.000 $25.000 $13.300 $60.500 $35.000 $26.000 $42.700 $50.000 $5.000 $134.520
403 6001 TEMPORARY SPL SHORING SF 628.000 $47.060 $20.000 $82.500 $46.000 $26.750 $100.500 $100.000 $35.000 $33.240
432 6001 RIPRAP (CONC)(4 IN) CY 4.000 $435.830 $1,110.000 $1,320.000 $1,355.000 $728.000 $1,130.000 $1,200.000 $1,000.000 $791.420
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 113.000 $435.830 $837.000 $880.000 $790.000 $583.150 $754.000 $850.000 $1,000.000 $679.210
460 6003 CMP (GAL STL 24 IN) LF 17.000 $94.260 $185.000 $308.170 $138.000 $314.580 $175.750 $200.000 $225.000 $274.180
460 6010 CMP AR (GAL STL DES 3) LF 19.000 $166.430 $361.000 $321.610 $226.000 $474.010 $377.000 $425.000 $275.000 $346.860
464 6005 RC PIPE (CL III)(24 IN) LF 68.000 $146.560 $174.000 $163.640 $173.000 $212.930 $271.500 $300.000 $200.000 $186.620
466 6062 HEADWALL (CH - FW - A - 0) (DES= 3) EA 2.000 $6,502.180 $5,240.000 $10,450.000 $7,150.000 $5,189.500 $3,420.000 $4,000.000 $10,000.000 $6,959.140
466 6130 HEADWALL (CH - PW - S) (DIA= 24 IN) EA 1.000 $6,502.180 $9,290.000 $6,050.000 $10,650.000 $7,039.950 $3,170.000 $3,500.000 $15,000.000 $8,534.220
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1.000 $3,143.300 $2,890.000 $3,850.000 $1,980.000 $3,531.000 $2,310.000 $3,000.000 $5,000.000 $4,248.420
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 1.000 $3,096.900 $4,250.000 $4,950.000 $1,770.000 $3,600.550 $2,510.000 $3,000.000 $5,000.000 $4,976.840
467 6534 SET (TY II) (DES 3) (CMP) (4: 1) (C) EA 2.000 $1,900.000 $2,140.000 $3,850.000 $2,055.000 $2,284.450 $2,510.000 $3,000.000 $4,500.000 $3,182.270
496 6004 REMOV STR (SET) EA 3.000 $1,224.520 $344.000 $1,650.000 $1,029.000 $1,658.500 $276.500 $2,000.000 $1,000.000 $1,292.330
496 6007 REMOV STR (PIPE) LF 65.000 $116.600 $22.600 $49.500 $29.000 $21.400 $50.300 $100.000 $50.000 $59.650
500 6001 MOBILIZATION LS 1.000 $714,332.960 $450,000.000 $567,322.760 $449,000.000 $581,973.317 $445,000.000 $625,000.000 $625,000.000 $716,249.480
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 $8,596.120 $8,700.000 $7,289.150 $3,200.000 $5,388.432 $17,960.000 $30,000.000 $12,000.000 $8,828.520
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 124.000 $44.000 $42.400 $44.550 $44.500 $42.120 $40.700 $50.000 $48.000 $40.500
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,228.000 $46.290 $50.900 $47.300 $53.500 $44.200 $42.700 $50.000 $43.000 $42.500
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,352.000 $17.700 $21.200 $2.200 $22.250 $9.235 $8.900 $10.000 $23.000 $8.880
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 $15.430 $42.400 $5.500 $44.500 $23.556 $22.750 $25.000 $28.000 $22.650
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 $8.000 $21.200 $2.200 $22.250 $9.880 $9.550 $10.000 $15.000 $9.500
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 25,747.000 $5.000 $4.500 $4.400 $4.750 $3.380 $3.250 $4.000 $4.000 $3.250
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 25,747.000 $1.180 $0.900 $0.550 $1.000 $0.520 $0.500 $1.000 $1.500 $0.500
508 6001 CONSTRUCTING DETOURS SY 641.000 $126.430 $94.600 $241.190 $92.000 $84.851 $123.000 $150.000 $175.000 $101.200
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 260.000 $111.000 $179.000 $51.150 $120.000 $87.740 $291.500 $150.000 $75.000 $84.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 40.000 $54.530 $56.300 $168.040 $91.500 $30.763 $262.000 $250.000 $100.000 $117.050
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 80.000 $56.120 $40.800 $168.040 $90.500 $30.495 $242.250 $150.000 $100.000 $110.010
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 60.000 $17.560 $76.700 $152.400 $12.500 $20.651 $201.250 $125.000 $50.000 $160.140
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 120.000 $28.650 $55.300 $50.200 $15.500 $20.651 $149.500 $75.000 $50.000 $85.610
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 40.000 $20.920 $49.300 $75.300 $24.000 $24.343 $273.500 $100.000 $75.000 $105.680
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 80.000 $26.490 $49.300 $75.300 $18.000 $24.075 $112.000 $100.000 $75.000 $72.320
530 6004 DRIVEWAYS (CONC) SY 472.000 $91.890 $155.000 $178.840 $116.000 $261.947 $191.250 $150.000 $130.000 $141.520
530 6006 DRIVEWAYS (SURF TREAT) SY 3,329.000 $41.890 $57.000 $71.500 $44.000 $37.536 $85.600 $50.000 $60.000 $56.500
530 6007 TURNOUTS (CONC) SY 26.000 $208.500 $154.000 $220.000 $125.000 $320.797 $244.000 $400.000 $150.000 $130.200
530 6009 TURNOUTS (SURF TREAT) SY 457.000 $85.270 $56.600 $13.200 $50.250 $48.792 $95.500 $50.000 $60.000 $56.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,200.000 $35.830 $23.900 $27.500 $25.000 $25.740 $25.400 $30.000 $30.000 $23.720
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 4.000 $1,167.330 $1,270.000 $1,485.000 $1,350.000 $1,404.000 $1,410.000 $1,500.000 $1,500.000 $1,264.980
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $3,783.330 $3,130.000 $3,850.000 $3,275.000 $3,551.600 $3,800.000 $3,500.000 $3,250.000 $3,109.750
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 27.000 $338.080 $382.000 $335.500 $340.000 $374.400 $306.500 $400.000 $400.000 $360.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 5.000 $741.900 $690.000 $665.500 $675.000 $676.000 $608.000 $750.000 $700.000 $650.000
636 6001 ALUMINUM SIGNS (TY A) SF 12.000 $52.740 $37.100 $26.400 $28.500 $36.400 $25.650 $40.000 $30.000 $35.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 40.000 $853.330 $743.000 $770.000 $750.000 $728.000 $678.000 $800.000 $675.000 $700.000
644 6002 IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) EA 9.000 $1,515.430 $796.000 $913.000 $925.000 $780.000 $834.000 $850.000 $830.000 $750.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 42.000 $897.500 $849.000 $880.000 $875.000 $832.000 $789.000 $900.000 $785.000 $800.000
644 6023 IN SM RD SN SUP&AM TYFRP(1)UA(P) EA 2.000 $450.000 $743.000 $1,144.000 $1,160.000 $728.000 $1,050.000 $800.000 $1,040.000 $700.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 8.000 $1,075.830 $1,030.000 $990.000 $960.000 $1,014.000 $864.000 $1,200.000 $860.000 $975.000
644 6031 IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) EA 3.000 $980.550 $1,460.000 $1,149.500 $1,160.000 $1,430.000 $1,050.000 $1,600.000 $1,045.000 $1,375.000
644 6076 REMOVE SM RD SN SUP&AM EA 104.000 $167.600 $106.000 $115.500 $120.000 $104.000 $105.500 $125.000 $125.000 $100.000
644 6078 REMOVE SM RD SN SUP&AM (SIGN ONLY) EA 1.000 $124.710 $79.600 $93.500 $95.000 $78.000 $85.400 $100.000 $100.000 $75.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 20.000 $39.250 $34.000 $22.000 $27.000 $33.280 $19.600 $30.000 $25.000 $32.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 21.000 $101.390 $79.600 $80.300 $81.000 $78.000 $72.900 $85.000 $80.000 $75.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 75,852.000 $1.260 $0.400 $0.390 $0.400 $0.478 $1.050 $0.500 $0.500 $1.050
662 6067 WK ZN PAV MRK REMOV (W)6"(SLD) LF 1,435.000 $13.330 $1.100 $1.050 $1.100 $0.499 $20.100 $0.550 $1.250 $20.000
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 572.000 $13.330 $9.700 $9.900 $9.500 $4.992 $38.200 $5.500 $10.000 $38.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 3,742.000 $1.250 $1.500 $1.100 $2.500 $1.605 $2.250 $1.250 $4.000 $1.630
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 4,014.000 $7.830 $1.500 $1.100 $2.500 $1.605 $2.250 $1.250 $4.000 $1.630
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 228.000 $1.970 $1.100 $1.050 $1.100 $2.382 $3.950 $3.000 $1.250 $3.950
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 1.000 $249.780 $227.000 $220.000 $225.000 $182.000 $452.000 $200.000 $300.000 $450.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 1.000 $266.270 $256.000 $247.500 $250.000 $192.400 $502.000 $225.000 $300.000 $500.000
666 6225 PAVEMENT SEALER 6" LF 140,206.000 $0.570 $0.280 $0.280 $0.300 $0.468 $0.350 $0.500 $0.350 $0.360
666 6226 PAVEMENT SEALER 8" LF 228.000 $0.870 $0.570 $0.550 $0.600 $0.614 $1.050 $0.750 $0.750 $1.050
666 6231 PAVEMENT SEALER (ARROW) EA 1.000 $120.170 $28.400 $27.500 $28.000 $104.000 $125.500 $125.000 $50.000 $125.000
666 6232 PAVEMENT SEALER (WORD) EA 1.000 $125.690 $34.100 $33.000 $33.500 $109.200 $150.750 $125.000 $50.000 $150.000
666 6285 REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) LF 74,574.000 $2.020 $0.910 $0.880 $0.900 $1.768 $1.250 $2.000 $1.000 $1.250
666 6289 REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL) LF 62,682.000 $2.380 $0.910 $0.880 $0.900 $1.768 $1.250 $2.000 $1.000 $1.250
666 6293 REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL) LF 2,950.000 $1.570 $0.970 $0.940 $0.950 $1.820 $1.300 $2.000 $1.100 $1.280
672 6007 REFL PAV MRKR TY I-C EA 12.000 $6.580 $6.800 $6.600 $6.700 $4.420 $20.100 $5.000 $8.000 $20.000
672 6009 REFL PAV MRKR TY II-A-A EA 944.000 $7.570 $6.800 $6.600 $6.700 $4.160 $8.400 $5.500 $8.000 $8.350
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 65,327.000 $0.880 $0.400 $0.830 $0.400 $0.364 $0.500 $0.500 $0.500 $0.500
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 36,896.000 $37.500 $1.750 $3.180 $21.350 $4.794 $5.650 $3.000 $3.000 $10.500
6056 6002 PREFORMED CENTERLINE RUMBLE STRIP LF 72.000 $8.740 $22.700 $22.000 $22.250 $104.000 $42.200 $50.000 $25.000 $208.670
6185 6002 TMA (STATIONARY) DAY 13.000 $232.680 $248.000 $550.000 $250.000 $321.000 $1,010.000 $500.000 $1,000.000 $269.860
6185 6005 TMA (MOBILE OPERATION) DAY 43.000 $401.830 $493.000 $110.000 $450.000 $592.780 $1,040.000 $500.000 $1,250.000 $347.120
6509 6001 DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM MO 14.500 $10,619.510 $10,400.000 $13,750.000 $8,815.000 $14,525.423 $16,530.000 $25,000.000 $20,000.000 $12,081.590
Totals: $7,160,914.84 $4,477,118.86 $4,607,328.68 $5,399,445.00 $5,831,190.25 $5,928,107.45 $6,427,861.45 $6,634,821.25 $7,162,487.36