PREPARING ROW
|
STA
|
327.300
|
$2,500.000
|
$410.570
|
$585.000
|
$865.800
|
$1,050.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
103.000
|
$7.000
|
$15.500
|
$33.000
|
$19.980
|
$53.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
364.000
|
$15.000
|
$7.750
|
$20.000
|
$19.980
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
466.000
|
$17.000
|
$9.000
|
$21.000
|
$22.260
|
$12.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,160.000
|
$7.500
|
$1.500
|
$9.000
|
$12.270
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,068.000
|
$9.000
|
$19.360
|
$24.000
|
$24.540
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,350.000
|
$12.000
|
$15.190
|
$18.000
|
$21.390
|
$14.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
82,354.000
|
$3.000
|
$3.760
|
$1.000
|
$0.850
|
$2.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
82,354.000
|
$0.180
|
$0.140
|
$0.150
|
$0.150
|
$0.180
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
82,354.000
|
$0.100
|
$0.110
|
$0.150
|
$0.100
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
1,284.700
|
$26.000
|
$8.340
|
$17.000
|
$16.680
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
82,354.000
|
$0.800
|
$0.860
|
$1.000
|
$0.900
|
$1.000
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
966.000
|
$92.400
|
$87.090
|
$89.000
|
$96.520
|
$105.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
31,875.000
|
$4.500
|
$3.650
|
$3.500
|
$4.060
|
$3.400
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
|
SY
|
6,000.000
|
$39.000
|
$34.850
|
$37.000
|
$43.850
|
$44.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
168.200
|
$100.000
|
$156.000
|
$180.000
|
$140.000
|
$150.000
|
|
|
CEM STABIL BKFL
|
CY
|
17.000
|
$80.000
|
$152.000
|
$170.000
|
$135.000
|
$225.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
47.000
|
$50.000
|
$85.000
|
$73.000
|
$94.000
|
$95.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
14.000
|
$140.000
|
$270.000
|
$180.000
|
$135.000
|
$400.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
120.000
|
$400.000
|
$460.000
|
$500.000
|
$580.000
|
$650.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
84.000
|
$400.000
|
$465.000
|
$500.000
|
$510.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
115.000
|
$470.000
|
$735.000
|
$500.000
|
$510.000
|
$415.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
8.160
|
$55.000
|
$50.000
|
$200.000
|
$695.000
|
$325.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
100.590
|
$40.000
|
$60.000
|
$170.000
|
$285.000
|
$115.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
72.270
|
$85.000
|
$60.000
|
$73.000
|
$81.500
|
$85.000
|
|
|
CMP AR (GAL STL DES 7)
|
LF
|
42.550
|
$250.000
|
$191.000
|
$200.000
|
$135.000
|
$300.000
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
19.260
|
$80.000
|
$128.000
|
$300.000
|
$305.000
|
$240.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
13.890
|
$110.000
|
$211.000
|
$440.000
|
$425.000
|
$300.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
12.270
|
$165.000
|
$395.000
|
$675.000
|
$575.000
|
$425.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$6,500.000
|
$4,500.000
|
$7,100.000
|
$3,060.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (C)
|
EA
|
2.000
|
$1,065.000
|
$1,500.000
|
$1,200.000
|
$2,350.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$1,325.000
|
$1,500.000
|
$1,520.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$1,500.000
|
$1,600.000
|
$1,520.000
|
$1,650.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$3,400.000
|
$1,600.000
|
$3,800.000
|
$1,760.000
|
$2,000.000
|
|
|
SET (TY II) (27 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,910.000
|
$2,500.000
|
$2,000.000
|
$2,230.000
|
$2,100.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,640.000
|
$4,100.000
|
$3,000.000
|
$2,350.000
|
$2,300.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,900.000
|
$7,850.000
|
$4,700.000
|
$4,710.000
|
$11,000.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$890.000
|
$1,500.000
|
$1,000.000
|
$4,450.000
|
$2,000.000
|
|
|
SET (TY II) (DES 7) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$5,500.000
|
$4,000.000
|
$1,500.000
|
$6,690.000
|
$10,000.000
|
|
|
SET (TY II) (DES 7) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$4,500.000
|
$1,300.000
|
$6,570.000
|
$12,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
18.000
|
$1,500.000
|
$2,000.000
|
$2,000.000
|
$1,560.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,000.000
|
$325.000
|
$1,200.000
|
$1,030.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
EA
|
3.000
|
$1,000.000
|
$375.000
|
$800.000
|
$1,890.000
|
$800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$292,817.530
|
$421,061.900
|
$380,000.000
|
$383,000.000
|
$420,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$6,750.000
|
$1,835.620
|
$3,200.000
|
$2,280.000
|
$13,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 5)
|
LF
|
3,014.000
|
$35.000
|
$20.270
|
$22.000
|
$21.500
|
$23.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,014.000
|
$8.000
|
$7.540
|
$8.000
|
$7.900
|
$6.450
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$15.000
|
$21.590
|
$23.000
|
$22.500
|
$27.650
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$5.000
|
$6.700
|
$7.000
|
$7.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
16,705.000
|
$2.000
|
$2.300
|
$2.500
|
$2.400
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
16,705.000
|
$0.600
|
$0.420
|
$0.500
|
$0.450
|
$0.500
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
682.000
|
$120.000
|
$104.160
|
$100.000
|
$136.800
|
$80.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
162.000
|
$68.000
|
$116.510
|
$90.000
|
$100.000
|
$90.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,930.000
|
$25.000
|
$42.700
|
$54.000
|
$39.420
|
$60.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
296.000
|
$30.000
|
$50.040
|
$103.000
|
$39.420
|
$83.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,450.000
|
$20.000
|
$24.990
|
$24.000
|
$26.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (SPECIAL)
|
LF
|
100.000
|
$20.000
|
$29.140
|
$35.000
|
$30.500
|
$30.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$57.000
|
$73.870
|
$70.000
|
$77.500
|
$55.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,638.000
|
$1.750
|
$1.230
|
$2.750
|
$1.300
|
$1.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,650.000
|
$3,015.140
|
$3,000.000
|
$3,170.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$300.000
|
$204.900
|
$250.000
|
$215.000
|
$220.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
87.200
|
$17.000
|
$80.000
|
$35.000
|
$36.000
|
$35.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
12.000
|
$250.000
|
$183.000
|
$200.000
|
$190.000
|
$185.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$575.000
|
$560.000
|
$610.000
|
$590.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
74.000
|
$495.000
|
$530.000
|
$575.000
|
$555.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
32.000
|
$490.000
|
$612.000
|
$700.000
|
$645.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$790.000
|
$726.000
|
$800.000
|
$760.000
|
$730.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$700.000
|
$710.000
|
$775.000
|
$745.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$720.000
|
$643.000
|
$700.000
|
$675.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$500.000
|
$580.000
|
$630.000
|
$610.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
84.000
|
$100.000
|
$94.000
|
$100.000
|
$98.500
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
78.000
|
$25.000
|
$22.000
|
$24.000
|
$23.000
|
$22.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
29.000
|
$25.000
|
$6.000
|
$6.000
|
$6.300
|
$6.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
39.000
|
$26.000
|
$24.000
|
$26.000
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
18.000
|
$55.000
|
$73.000
|
$80.000
|
$76.500
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI)
|
EA
|
6.000
|
$125.000
|
$68.000
|
$74.000
|
$71.500
|
$70.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
2.000
|
$40.000
|
$73.000
|
$80.000
|
$76.500
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
21.000
|
$63.000
|
$73.000
|
$80.000
|
$76.500
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
3.000
|
$90.000
|
$68.000
|
$74.000
|
$71.500
|
$70.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
2.000
|
$211.000
|
$73.000
|
$80.000
|
$76.500
|
$75.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
2.000
|
$200.000
|
$73.000
|
$80.000
|
$76.500
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,400.000
|
$0.250
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
44.000
|
$8.000
|
$10.000
|
$10.000
|
$10.500
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,954.000
|
$0.260
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,505.000
|
$0.700
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
99.000
|
$1.750
|
$1.150
|
$0.750
|
$1.400
|
$1.530
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,509.000
|
$1.500
|
$1.150
|
$0.750
|
$1.400
|
$1.530
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
860.000
|
$0.850
|
$0.800
|
$0.750
|
$0.850
|
$0.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
16.000
|
$6.000
|
$20.000
|
$21.000
|
$21.000
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$150.000
|
$150.000
|
$160.000
|
$160.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
1.000
|
$190.000
|
$300.000
|
$325.000
|
$315.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
15.000
|
$150.000
|
$150.000
|
$160.000
|
$160.000
|
$150.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
5.000
|
$45.000
|
$50.000
|
$53.000
|
$52.500
|
$50.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$322.000
|
$344.000
|
$350.000
|
$360.000
|
$344.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
66,410.000
|
$0.150
|
$0.110
|
$0.120
|
$0.100
|
$0.110
|
|
|
PAVEMENT SEALER 6"
|
LF
|
65,149.000
|
$0.190
|
$0.170
|
$0.200
|
$0.200
|
$0.170
|
|
|
PAVEMENT SEALER 8"
|
LF
|
892.000
|
$0.750
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
16.000
|
$2.200
|
$10.000
|
$10.000
|
$10.500
|
$10.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$50.000
|
$50.000
|
$54.000
|
$52.500
|
$50.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
15.000
|
$55.000
|
$50.000
|
$54.000
|
$52.500
|
$50.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
1.000
|
$145.000
|
$188.000
|
$200.000
|
$195.000
|
$188.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
5.000
|
$25.000
|
$20.000
|
$20.000
|
$21.000
|
$20.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
1.000
|
$125.000
|
$200.000
|
$200.000
|
$210.000
|
$200.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
65,149.000
|
$0.800
|
$0.810
|
$0.750
|
$0.850
|
$0.810
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
380.000
|
$0.500
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
66,030.000
|
$0.600
|
$0.580
|
$0.750
|
$0.600
|
$0.580
|
|
REFL PAV MRKR TY I-C
|
EA
|
99.000
|
$4.600
|
$4.000
|
$4.000
|
$4.200
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,066.000
|
$4.000
|
$3.130
|
$3.000
|
$3.300
|
$3.130
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,020.000
|
$0.850
|
$0.470
|
$0.500
|
$0.500
|
$0.470
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
22.000
|
$4.000
|
$5.000
|
$5.000
|
$5.300
|
$5.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
11,900.000
|
$62.000
|
$76.800
|
$70.000
|
$80.730
|
$80.000
|
|
|
TACK COAT
|
GAL
|
8,008.000
|
$2.100
|
$2.730
|
$2.000
|
$3.380
|
$2.500
|
|
|
TMA (STATIONARY)
|
DAY
|
102.000
|
$135.000
|
$200.000
|
$1,000.000
|
$325.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
38.000
|
$150.000
|
$200.000
|
$1,000.000
|
$325.000
|
$400.000
|
|
Totals: |
$3,953,036.650
|
$3,777,154.659
|
$3,815,092.710
|
$4,007,048.661
|
$4,237,555.550
|